Direct Pressure - Charted B
Direct Pressure - Charted B
Charted
Authorized By:
____________________________
Senior Inspector
Methanex Corporation
Medicine Hat, AB
Copy: 01
Revision Date: January 7, 2000
\\mxcmhtnt1\inetpub\wwwroot\procedures\maintenance\inspection\nde\lt-09.doc
TABLE OF CONTENTS
DIRECT PRESSURE / PRESSURE DROP TECHNIQUE "B"
2. Equipment:
• Test liquid is water at a pressure not to exceed the calculated test pressure of the equipment
being tested.
3. Surface cleanliness: no cleaning required other than new welds to be examined as part of
construction package.
4. Method or Technique:
• Monitor for pressure drop and check system for visible leaks. Visible or other leaks at
flanges, threads, etc., must be fixed prior to commencement of test period.
• Wind and start pressure / temperature recorder. Initial and date chart at start of test and
ensure chart time aligns with real time.
• The system being tested shall be between 40ºF and 125ºF during test.
5. Test is considered acceptable if any observed pressure drop can be positively attributed to rise
and fall in test commodity temperature.
6. No post cleaning should be required depending on normal line commodity and test liquid.
7. Where repairs are required the equipment will be depressurized, repaired in accordance with the
applicable code section and the test repeated.
8. The date and signature of the inspector appearing on the test chart will indicate acceptance of the
test.