OBS Second Tower

Cover
project

OBS NEW HEAD OFFICE


Second Tower
project

Bill of Quantities
IFC Package
Mar-20

Prepared By:

Mar.2020 IFC 1/5 05/22/2021


OBS Second Tower
Cover
project

Mar.2020 IFC 2/5 05/22/2021


DIVISION 15 - MECHANICAL ENGINEERING
INSTALLATIONS
unite Qty
AIR CONDITIONING AND VENTILATION shopDrawing Qty DIFFERENCE QTY shopDrawing Qty DIFFERENCE QTY
INSTALLATIONS Remarks
Rev-01 Design Vs. Rev-01 Rev-02 Design Vs. Rev-02
1 AIR COOLED CHILLER(SEC.15623)

Install, connect, test and put into operation of Air Cooled


SCREW Chillers complete with hook up and accessories
Complete with Vibration isolators, fittings, Gauges, R.417,
R 134 and all accessories necessary to complete installation
according to specs and drawings and all related ancillary
works.

CH-01,02,03
- Capacity 195 TR at ambient 110
- Water flow rate 468
GPM.
- E.W.T. 54 ºF
1-a
- L.W.T. 44 ºF No. 3

CH-04,05 ( one stand-by )


- Capacity 316 TR at ambient
110 - Water
flow rate 750 GPM.
- E.W.T. 54 ºF
1-b
- L.W.T. 44 ºF No. 2

2 CHILLED WATER PUMPS(SEC.15540)


Install, connect, test and put into operation of End Suction
Centrifugal Pumps, with supply & Installation of hook up
and ancillaries Complete with Vibration isolators, fittings,
Gauges and all accessories necessary to complete
installation according to specs and drawing and all related
ancillary works.

CHWP-01,02,03 ( one stand-by )


2-a - Water flow rate. 468 GPM No. 3
and 165 ft head -

CHWP - 04,05 ( one stand-by )


2-b - Water flow rate. 750 GPM No. 2
and 165 ft head -

3 EXPANSION AND COMPRESSION TANK(SEC.15526)


Supply and Installl, connect, test and put into operation of
compression tank, vertical removable bladder type -
vertically mounted, heavy gauge, floor mounted complete
with steel base and frame,pressurizatin unit, water shut-off
valves, vent and drain valve level indicator , non return
valve, supporting gauges, piping required to be connected
with the system, fittings, flanges, the item include stat
testing and all related ancillary works.

3-a EXP.T-01 capacity 1000 Liter Item 1

4 AIR SEPARATOR (SEC.15970)

Supply and, installing, and commisioning of an air seperator


and a make up water assembly c/w all connections, isolation
valves, relief valves,pressure gagues, strainers, piping,
mounting frame....ets, according to drawing &
specifiecation .

4-a AS 01 No. 1

5 FANS (SEC.15860)
Supply and Install, connect, test and put into operation of
exhaust fans complete with Common steel base with
vibration isolators, mesh screens, Tags , labels, flow
indicator & color code finishing, flexible duct ,duct
connect., Belt guard and weather protection for the
motor,builder works, Earthing & earthing, cables, electric
connection and all accessories necessary to complete
installation and all related ancillary works.

5-a Exhaust Fans(SEC.15860):

E.A.F - 01 (Centrifugal Type )


5-a-1
Capacity 10800 CFM & E.S.P. 0.95" W.G. No. 1

E.A.F - 02 (Centrifugal Type )


5-a-2
Capacity 5400 CFM & E.S.P. 0.8" W.G. No. 1

E.A.F - 03 (Centrifugal Type )


5-a-3
Capacity 7700 CFM & E.S.P. 0.95" W.G. No. 1

E.A.F - 04 (Centrifugal Type )


5-a-4
Capacity 2200 CFM & E.S.P. 0.8" W.G. No. 1
E.A.F - 05 (Centrifugal Type )
5-a-5
Capacity 5600 CFM & E.S.P. 0.8" W.G. No. 1
E.A.F - 06 (Centrifugal Type )
5-a-6
Capacity 3000 CFM & E.S.P. 0.8" W.G. No. 1
E.A.F - 07 (Centrifugal Type )
5-a-7
Capacity 6500 CFM & E.S.P. 0.8" W.G. No. 1

5-b Smoke Fans(SEC.15860):


S.F - 01 (Centrifugal Fan Type)
5-b-1
Capacity 11300 CFM & E.S.P. 2" W.G. No. 4

5-c Stair Case Pressurization Fans:


Supply and install, connect, test and put into operation of
pressurization air fans complete with Common steel base
with vibration isolators,st.st wire mesh screens, gravity
shutter, all corresponding filters,ags, labels, flow indicator
& color code finishing, duct connection, flexible duct, Belt
guard andweather protection, earthing cables, electric
connections and all accessories necessary to complete
installation and all related ancillary works.
P.F - 01 (Fan SectionType)
5-c-1
Capacity 9000 CFM & E.S.P. 2" W.G. No. 2

AIR HANDLING UNITS-TOTAL FRESH (SEC.15855)


7

Supply and Install, connect, test and put into operation of


horizon. draw through type air handling units, total fresh air
type c/w double skin insulated casing with thickness
according spec, supply fan sec. backward curved draw
through fan. , chilled water coil sec, mixing sec.accesses.
filter sec.( pre-filter & bag filter), hinged & tight sealing
doors, drain pan, through fan(where required) unit will
include common steel base with vibration isolators,shut-off
& pressure independant control valves, press. and temp.
gauges, strainer with drain valves and automatic air vent,
earthing duct connections with flexible connections,
electrical connections, all accessories and all related
ancillary works.

F.A.H.U.01 :
7-a
Air Flow 10385 CFM , Cooling Capacity 55TR. No. 1
F.A.H.U.02 :
7-b
Air Flow 6315 CFM , Cooling Capacity 33.3 TR. No. 1
F.A.H.U.03 :
7-c
Air Flow 6380 CFM , Cooling Capacity 33.38 TR. No. 1
F.A.H.U.04 :
7-d
Air Flow 12055 CFM , Cooling Capacity 64TR. No. 1

8 CHILLED WATER PIPING WORKS ((SEC.15125)


Supply, install, connect, test and put into operation of
chilled water pipe black seamless steel pipes, schedule 40,
conforming ASTM53A up to 600 mm diam. fittings to be
schedule 40 conforming ASTM234WPB, specialties,
connections tags, flanges, bolts, nuts, gaskets, sealers,
coupling & expansion joint, supports, hangers seismic
restraining system, rods, anchorsbeams, rollers, saddle and
surface cleaning, treatment, painting of flow indicators
with color code finishing, welding, cutting, normalizing
bending as well as rubber pads for sound isolation, testing,
balancing and start up to the connections with other units,
and all related ancillary works.

Φ 5" m 210 208 2 50 160


Φ 6" m 93 285 -192 195 (102)
Φ 8" m 60 73.04 -13.04 120 (60)
Φ 10" m 237 195 42 220 17
Φ 4" m 55 (55)
Φ 3" m 10 (10)
Φ 2.50" m 80 (80)
Φ2" m 15 (15)
9 NETWORK VALVES (SEC.15100) m
9-a Gate valve ( BV)
G.V Φ 2 1/2" No. 30 40 (10)
G.V Φ 3" No. 6 0 6
G.V Φ2" No. 8 (8)
G.V Φ4" No. 10 (10)
9-b MOTORIZED CONTROOL VALVE
M.C.V. SIZE 6" No. 1 0 1
10 CHILLED WATER PIPING INSULATION(SEC.15190)
Supply, install, connect, test and put into operation of
thermal insulation of chilled water pipes from fiber glass
high density c/w aluminum foil and all accessories, and all
related ancillary works.

50 mm thick. pipe work insulation to suit the following pipe


10-a sizes

Φ 5" m 210 208 -2 50 160


Φ 6" m 93 285 192 195 (102)
Φ 8" m 60 73.04 13.04 120 (60)
Φ 10" m 237 195 -42 220 17
Φ 4" m 55 (55)
Φ 3" m 10 (10)
Φ 2.50" m 80 (80)
Φ2" m 15 (15)
11 Pipingt Cladding
Supply, install, connect and put into operation of roof
chilled water pipe cladding from aluminum sheet 0.6 mm
thickness complete with support, hangers, rods, blots,
riveting and sealers, sleeves, rubber pads for labels, color m 400
code finishing, flow indicators

12 NETWORK VALVES(SEC.15100)
12-a Balancing valve ( BV)
BV Φ 2 1/2" No. 16 20 (4)
BV Φ 3" No. 1 0 1
BV Φ2" No. 4 (4)
BV Φ 4" No. 5 (5)
Automatic Air Vent 1'' No. 4 (4)
Drain Valve 2'' No. 4 (4)
13 DUCT WORK (SEC.15891)
Supply, install, connect, test and put into operation of
galvanized steel sheet metal duct delivered stored in good
conditions with standard accessories such as volume and
fire dampers in ducts passing through fire wall rated where
shown on dwgs, motorized damper for make up fresh air.
flex. connections splitter, inspection doors complete with
support, hangers, rods, wooden fram,anchors nuts, blots &
sealers, sleeves, rubber pads for sound isolations, tags,
labels color code finishing, flow indicators, builder works,
and all related ancillary works.

Galvanized steel sheet metal duct work with thickness


13-a
according to SMACNA standard. Kg 16230
Black steel sheet metal duct work with thickness 1.5 mm
13-b
according to SMACNA standard. Kg 17000

14 Duct Cladding

Supply, install, connect and put into operation of roof duct


cladding (for treated fresh air duct) from aluminum sheet
0.6 mm thickness complete with support, hangers, rods, m2 390
blots, riveting and sealers, sleeves, rubber pads for sound
isolations, labels, color code finishing, flow indicators

15 DUCT INSULATION (SEC.15250)


Supply, install, connect, test and put into operation of duct
insulation according to the specification and as shown on
drawings. Complete with internal sound lining (armaflex
6mm), closing tape, vapor barriers, adhesives surface
protection, insulation, fastener and coating, tags, flow
indicators, labels, color code, stickers, testing and
commissioning, builder works and all related ancillary
works.

Fiber glass with aluminum foil insulation for outdoor duct


15-a works 50 mm thickness and 24 Kg/m³ according to the m2 390
specification and as shown on drawings.

TESTING, BALANCING AND COMMISIONING SEC.15990)


Provide all labor and materials required to complete the
testing and balancing required according to the specification
according to schedule 40, PN 16 confirming with ASTM
including pipes, insulation,valves,fittings and drainage
18-b facilities for to suit proper the system and coordination with Item 1
plumbing works operation as shown on drawings and
specifications.

WATER TREATMENT AND CHEMICAL CLEAING SYSTEMS(SEC.15932)


Flushing & Chemical Treatment
Supply, install, connect, test all necessary mechanical
equipment, cleaning chemicals, treatment chemicals,
control equipment and services shall be furnished by a
single water treatment firm for undivided responsibility for
Chilled water and cooling tower network treatment system,
Complete with one year supply chemicals. and all related
Item 1
ancillary works.

Water softner
Supply, install, connect, test and put into operation of water
softner system complete with doseing pump, valves,
chemicals tanks, control system and all accessories
necessary to complete work same as specification. Item 1