You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

48
DEVIATION 48 NOTES:
FA C8 RECYCLE
R420-FR-2130 A/B ALARM
1300 V V FROM R420-T-2520 1 - SAME INSTRUMENTATION ON EACH PASS, (SEE TABLE 1,2 ON DWG.
217 D-EP-R420-1225-1118).
47 XYLENES RERUN COLUMN REBOILER R420-1514 47

14"-P-R420-5116-3CC1P01-IH
A FALL
A 21.6 A
RADIATION CONVECTION
FI FI FI 1300 D D 2 - CONVECTION ZONE TUBES PROTECTION IN CASE OF XYMAX UNIT SHUTDOWN,
DESIGN DUTY : 227.1 17.44 x 106 kcal/h
1300 1300 1300 VALVE OPENS.
46 2 (ga) A 46
DESIGN PRESSURE : 17.8/FV 18.6/FV kgf/cm L L L
FI
DESIGN TEMPERATURE : 480 470 °C AA AB AC 3 - DELETED.
1352
4 - DRAIN TO BE DISPOSED TO THE CLOSED DRAIN SYSTEM THROUGH A
45 45
TEMPORARY HOSE CONNECTED TO THE NEAREST CONNECTION POINT ON
TI THE COLLECTION HEADER.
2oo3
1307 ZC FAL ZC HS
44 44
5 - FV EQUIPPED WITH MINIMUM MECHANICAL TRAVEL STOP.
R420-FR-2130 A 1308 1300 1308 1352
AA FY 6 - SYMMETRICAL DISTRIBUTION IS REQUIRED.
XYLENES A
43 1352 OPEN VALVE 43 7 - DELETED.
RERUN COLUMN
AND LOGIC ACTIVATION 8 - FOR FIRING SYSTEM DETAIL SEE DWG: D-EP-R420-1225-1115,
B REBOILER V
B
TT D-EP-R420-1225-1116, D-EP-R420-1225-1117 AND D-EP-R420-1225-1118.
NOTE 8 * * DETAIL M2++
42 1307 42
CONTRACTOR VENDOR CONTRACTOR FT FT FT FT 9 - TWO PHASE FLOW: APPROPRIATE SUPPORT TO PREVENT FROM VIBRATIONS
AA D
1300 1300 1352 1352 TO BE PROVIDED.
N1A RO
FE A B FE ZV
41 AA AB 1352 41 10 - LLLL=MAX S.P 60% NORMAL FLOWRATE.
N3A 1300 MIXED XYLENES
A 6 1352 1352
6C 6A
A FROM R420-P-2135A/B
TE 8"-300#RF 6
10"x8" 8"-P-R420-1104-3CC1P01-IH LO LO
40 40 11 - REMOVABLE SPOOL APPLICABLE ONLY FOR LINES R420-P-1092/1200/1204/
1307 NOTE 6 R420-1111
NNF 1208/1212/1216/1220/1224/1228/1232/1236/1240/1244/1248/1252/1256
AA D 1 D AFL 1 D
NOTE 1 10"x8" BASED ON MAINTENANCE REQUIREMENT.

21.6
COIL 1-2 B

232
7A TSO
39 1D 1D 39
A 8"-300#RF * D
8"-300#RF NOTE 2
N2A FT
C D C
16"x8" N4A 1300
38 NOTE 6 N5 AA÷AP NOTE 11 38

H AC 232 8"-P-R420-1103-3CC1P01-IH
TE TT TI

7A
TI TT TE 16"x8"
NOTE 1 1308 1308 1308 27.7 GENERAL NOTES:
37 1306 1306 1306 B 37
L NOTE 10
10" - REFER TO GENERAL NOTES ON DWG: D-EP-R400-1225-1003.
AA AA
AA - ALL INSTRUMENT TAGS TO BE PREFIXED BY R420- UNLESS OTHERWISE
36 7A 12"X8" N6 AA÷AP 36
DISCREPANCY INDICATED.
1 LINE3
SKIN ALARM
H
8"-300#RF TE TT TI
H FA
35 2 COIL 1-16 1304 1304 1304 FC 35

12"-PH-R420-1079-3CC1P01-IH
1301
AA AA 1301
AA L
D D
3 AA
34 34
AA

3
FT

3
8"-P-R420-1199-3CC1P01-IH

3
PG 291
4 1301
33 1302 FV FE 27.4 33
AA
AA 1301 AA 1301
5 6B
5B 1 6"-300#RF 1 AA
32 LINE2 LINE 1 3 32
CURBED
6 AREA 8"X6"
AFO 8"X6"
8"x6" 1M D NOTE 5 1M D * 1
31 31
7 NOTE 4 FT
6" NOTE 4 1306 2
6"
FI
3 9
@ 14

E 30 8 AA 30 E
4
3

1306
F V@

4
48" HIPS 2oo16 4
H

FALL
V
13.8
304

AA

3
9 1300 D FSLL

3
29 8"-P-R420-1200-3CC1P01-IH 29

3
291 ZC FALL
FROM OTHER 6
NOTE 1 17.8 B 1309 1306
10 PASSES
28 28
AA 8

11
FALL
27 7 27
2oo3 1306
12 TI ZC FAL
FROM LALL-1301
1307 1308 1300 A 5 16
26 R420-FR-2130 B NOTE 1 30" 26
F 13 R420-1107 F
BA B
XYLENES 11
25 14 RERUN COLUMN 25
REBOILER 14"X10" FI FI FI
TT 9
XYLENES RERUN COLUMN NOTE 8 * * 1300 1300 1300
15 1307 L L L
24 FEED FROM XYMAX CONTRACTOR VENDOR CONTRACTOR FT FT NOTE 6 24
BA BA BB BC 10
TO R420-T-2130 1300 1300
N1B 14"X10"
16 FE REFERENCE DRAWINGS
(TRAY NUMBER # 83) BA BB
23 N3B 1300 23
16"-P-R420-1078-3CC1P01-IH 250 C DEVIATION 12 DWG NO. DWG TITLE

R420-1107 6C NOTE 10 17
B
1 0

17.6 NOTE 6 TE ALARM


@ 8

8"-300#RF 10"x8"
9
V 2
8
H V@

1307 10" 14
FA
F

22 NOTE 6 22
XYLENES RERUN COLUMN
G BA 1300 G
REBOILED RETURN COIL 3-4 NOTE 1 D 10"x8"
64"X48" 7A 16
TO R420-T-2130 B
21 64"-PH-R420-1079-3CC1P01-IH C 8"-300#RF * 21
8"-300#RF D-FE-R420-1225-1107_3 R420-1 XYLENES FRACTIONATION SECTION - XYLENES RERUN COLUMN REBOILING SYSTEM
R420-1107 N2B FT
TWO PHASE FLOW NOTE 9 16"x8" LINE 2 15 ISSUE PURPOSE: FINAL ISSUE AS-BUILT
N4B 1300 DISCREPANCY
N5 BA÷BP NOTE 11
APPROVED FOR ARAMCO APPROVED FOR
20 64"X48" ALARM 20
BC
NOTE 6 16"x8"
H 13 OVERSEAS COMPANY B. V. SUMITOMO CHEMICAL CO. , LTD
NOTE 1 FA 32
TI TT TE HOT OIL
D SIGNATURE/DATA NAME SIGNATURE/DATA NAME
19 1306 1306 1306 1301 FROM USERS AND 19
42"X30"
L
BA BA R420-PDY-1300
BA 42"-P-R420-1090-3CC1P01-IH
BA 12"X8"
7A N6 BA÷BP R420-1110
18 17 18
SKIN
H

3
LINE3 TE TT TI 42"X30"

3
H 8"-300#RF H

3
H 291
18 COIL 17-32 1304 1304 1304 FC
12"-PH-R420-1079-3CC1P01-IH

17 17

3
27.4

3
1301 8"-P-R420-1231-3CC1P01-IH

3
BA BA 291
BA L
19 27.4
16
BA 16
FT Z1 28/08/17 FINAL ISSUE AS-BUILT M.ZAKEE A.BUETTO M.AMMIRATI
PG
20 1301 REV. DATE DESCRIPTION PREPARED CHECKED APPROVED
1302 FV FE
15 BA BA 15
BA 1301 1301
21 6B
5B 1 6"-300#RF 1 BA
CURBED LINE2 LINE 1 19 LOCATION: RABIGH, SAUDI ARABIA
14 14
22 AREA 8"X6"
8"X6" AFO
8"x6" 1M D 1M D * 17 RABIGH II REFINING AND PETROCHEMICAL PROJECT
I NOTE 5 I

13 23 FT 13 NAPHTHA AND AROMATICS PACKAGE (RP2)


3 9

NOTE 4
@ 14
4

NOTE 4
3

6"
F V@

6" 1306 18
H
V
13.8

24
304

BA
12 4 12
48" 20
3

25 D
3

8"-P-R420-1232-3CC1P01-IH
3

291 HIPS 2oo16


11 22 11
NOTE 1 17.8 FSLL
26 ZC FI
FROM OTHER
1309 1306 24
10 PASSES 10
27
BA ARAMCO OVERSEAS COMPANY B.V.
FALL 23
J
9
FURNACE 28 1306
9 & SUMITOMO CHEMICAL CO. , LTD J

BURNERS
SHUT DOWN SHUT DOWN 21
B NOTE 1
FALL 30" SAIPEM JOB CODE: 032142
8 29 8
HA HA 1306
27 THIS DOCUMENT IS CONFIDENTIAL. THE COPYRIGHT THEREIN IS VASTED IN COMPANY.
1301 1303
RECIPIENTS MUST OBTAIN THE WRITTEN AUTHORITY OF THE SAID COMPANY BEFORE WHOLLY OR PARTLY DUPLICATING OR DISCLOSING THE SAME TO OTHERS. ALL RIGHTS RESERVED.
30 BA
7 7
25

31
6
FURNACE
26 6
PIPING AND INSTRUMENTATION DIAGRAM
32
SHUT DOWN
PIB-32
28
R420-1 XYLENES FRACTIONATION SECTION
K 5 HS 5 K
ZC
ZC 1303 XYLENES RERUN COLUMN REBOILING SYSTEM (2/2)
1306 1310 P 30
4 FURNACE 4

SHUT DOWN UNIT NO: R420 UNIT TITLE: AROMATICS COMPLEX


32
HA
NUMBER OF UNIT 1 NAME OF AREA/UNIT XYLENES FRACTIONATION SECTION
3 1303 3
R 31
CCR SCALE: NONE SIZE REV

HS HS HS AT SAFE
2 2
1301 1303 1303 LOCATION 29 COMPANY DWG. NO.;

C R D-EP-R420-1225-1109 B Z1
L L
BURNERS
FURNACE FURNACE
1 SHUT DOWN 1 SAIPEM DWG. NO.:
SHUT DOWN SHUT DOWN
R420-GD-B-06608 B Z1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

You might also like