Project Name: 380kV OHTL from JEC-JRP Abha East 380kV BSP Contract No 4400005257 Permit No. Reference No.
RA TEAM (NAMES) DESIGNATION SIGNATURES TASK/ACTIVITY/PROCESS NAME RISK EVALUATION TABLE
1. Mr. Gijo M. Eapen Civil Surveyor ________________ PERSON 2 3 6
2. Mr Owen Villarino HSE Coordinator ________________ RISK FACTOR PROBABILITY
EXPOSED Remote Possible Probable
SEVERITY
OVERHEAD ELECTRICAL LIVE LINES
C – Contractors /
Medium RiskAcceptable 4
12 - 24 only with full implementation L M M
Sub-contractors Reportable Injury
WORK LOCATION: of all control measures.
O – Others, such as
1 - 11
Maintainall basic disciplines 2
Public, visitor
and clients. and controls. First Aid or Minor L L M
DEPARTMENT/AREA APPROVED BY DATE : January 05, 2018 NEXT REVIEW DATE: July 26, 2018
MANAGER/SUPERVISOR:
Identify the hazard on the given task and conduct assessment of the actual site condition, all identified risk should provide with a plan to eliminate or control the risk.
RISK ASSESSMENT
HAZARD IDENTIFICATION CONTROL Consequences X Likelihood =
RISK REDUCTION ACTION PLAN
Consequences X Likelihood = Risk Ranking
Risk Ranking
Person
ImplementedControls
Risks Issue
Risk Ranking
Risk Ranking
Consequence
Consequence
(Possible incident)
Exposed Follow up by
Likelihood
Likelihood
Workplace/Activity/
[What can go wrong] IMPROVED EXISTING Whom (name)
HAZARD EXISTING CONTROLS
No.
Coordinate with site management to move Assign a banks man/ signal man to control the
equipment around the work site movement of the vehicle/ equipment
Equipment and operator must be holding Drivers should be cautious on the speed at the
appropriate valid 3rd party certificates. site
Struck by equipment or Vehicle Drivers
Moving vehicle and plant
Equipment movement moving plant, struck by load Load must be secured to ensure no materials will All loads must be secured properly to prevent Supervisor
1
In site. falling from equipment, fall while being transported.
0 8 0 3 2 6
from falling
1 3 3 Yes
Personal Injury
manual handling Daily
Drivers of equipment and vehicles must inspect Safety signages must be posted along the
vehicles prior to deployment in the site access roads
Establish safe access roads All drivers must follow traffic rules and
regulations
Prepared by: Owen Villarino/ HSE Coordinator Approved by: M. Ramesh/ Construction Manager Element Reference No: 2.8 Page No: Revision No:
Signature: Signature SEC EHV FORMS 2.8 G 4 Page 1 of 2 00
SEC EHVPD RISK ASSESSMENT
If possible and necessary, obtain shutdown permit
from the SEC authorities
Prepared by: Owen Villarino/ HSE Coordinator Approved by: M. Ramesh/ Construction Manager Element Reference No: 2.8 Page No: Revision No:
Signature: Signature SEC EHV FORMS 2.8 G 4 Page 2 of 2 00