You are on page 1of 1

Orion Power Meghnaghat Limited

100 MW HFO Power Plant, Meghnaghat, Narayanganj


Operation Department
Compressor room

Oil LO Motor 1st stage 2nd stage 3rd stage Instrument air
Date Comp. no. Time HMR Diff. level Press. curent condense drain (Ltr) Signature
(Bar) (Amp) Press(bar)/Temp(oC) Press(bar)/Temp(oC) Press(bar)/Temp(oC) IAC 1 IAC 2
09:00 / / /
Start Air 12:00 / / /
compressor
#1 15:00 / / /
18:00 / / /
09:00 / / /
Start Air 12:00 / / /
compressor
#2 15:00 / / /
18:00 / / /
21:00 / / /
Start Air 24:00 / / /
compressor
#1 03:00 / / /
06:00 / / /
21:00 / / /
Start Air 24:00 / / /
compressor
#2 03:00 / / /
06:00 / / /
LO Motor 1st stage 2nd stage 3rd stage Instrument air
Oil condense drain (Ltr)
Date Comp. no. Time HMR Diff. Press. curent Signature
level (Bar) (Amp) Press(bar)/Temp(oC) Press(bar)/Temp(oC) Press(bar)/Temp(oC) IAC 1 IAC 2
09:00 / / /
Start Air 12:00 / / /
compressor
#1 15:00 / / /
18:00 / / /
09:00 / / /
Start Air 12:00 / / /
compressor
#2 15:00 / / /
18:00 / / /
21:00 / / /
Start Air 24:00 / / /
compressor
#1 03:00 / / /
06:00 / / /
21:00 / / /
Start Air 24:00 / / /
compressor
#2 03:00 / / /
06:00 / / /

You might also like