Monitoring of Outages of Distribution System

A. Daily Outage Statement of 11kV Feeders of Jammu City


Name of Division: Sub Transmission Division-I; Jammu Date: 16-06-2021

Emanating from Total period for


Tripping Restoration
S.No Name of 11kV Feeder 33/11kV Sub which feeder Type of Fault Reason of Fault
Time Time
Station remained Off
1.
2.
3.
4.
5.
6.
7.

1. Please indicate type of fault as; O/C Fault, Earth Fault, Planned Shut Down etc.
2. Please indicate reason of fault as; Transient Fault, Wind Storm, Rains, Pole Broken at......, Mid span clashing of conductors,
tree fault, broken insulator etc.

Page 1 of 2
B. Daily Outage Statement of 33/11kV Sub Stations
Name of Division: Date: 16-06-2021

Total period for


Name of 33/11kV Equipment Under Tripping Restoration which
S.No Type of Fault Reason of Fault Areas effected
Sub Station Outage Time Time equipment
remained Off
1.
2.
3.
4.
5.
6.
7.

1. Please indicate equipment under outage as; Power Transformer, CB, CT, PT, LA, Isolator, BPI, Bus, Bus Jumper
2. Please indicate type of fault as; O/C Fault, Earth Fault, Differential Trip, Buch Trip, OT Trip, WT Trip, Planned Shut Down
etc.
3. Please indicate reason of fault like, Low Oil Level in PTR ....., Air Lock in Buch, LA Failure, CT Failure, Bus Joint failure etc

Page 2 of 2