Tanta University Design of Metallic Bridges [b]

Faculty of Engineering CSE 4238


Structural Engineering Department Second Semester

LAYOUT OF TRUSS GIRDER ROAD WAY


BRIDGES
Classification Bridges
I-According to Function of Bridge: First Semester
Rail Way Bridges
 Rail Way Bridges Plate Girder Bridges
 Road Way Bridges
 Crane Bridges
 Foot Bridges
 Bridges Carring Pipe Line

II-According to Type of Main Girder:


 Plate Girder Bridges Second Semester
 Truss Girder Bridges Road Way Bridges
 Box Girder Bridges Truss Girder Bridges
 Composite Girder Bridges
Any Bridge Consists Of:
1-Floor [R.C Slab (Road Way & Side Walk)]
Side Walk Road Way

R.C Slab

150
150

200
50
Stringer

1750~2250

2-Floor Beams [Stringer & Cross Girder]


3-Main Girder – Road Way Bridge – Truss Girder
4-Bearing [Supports]
Steps of Design of Road Way Bridge:
Layout of Road Way Bridge
Design of Stringer
Design of Cross Girder
Design of Main Girder [Truss]
 Loads & Forces in Truss Members
 Design of Upper Chord Members
 Design of Lower Chord Members
 Design of Diagonal & Vertical Members
 Design of Vertical Members [Pony Bridge]
 Design of Connections
Design of Bearing [Supports]
Layout of Road Way Bridges:
100 cm

1 cm
SCALE 1:100 NOTES
SCALE 1:50
ELEV 1:25
1:20

S.V

SCALE 1:100
70 cm

1 cm 1 cm

PLAN
UPPER BRACING

SCALE 1:100

12 cm
PLAN
LOWER BRACING

7.5 cm
1 cm
Example No [1]:
o Road Way Bridge
o W-Truss Girder
o Pony Bridge
o Side Walk = 2.0 m & Road Way = 11.0 m
o Span = 50.0 m Divide [10] Equal Panels
[Solution]
 Width of M.G = 40 cm [Pony Bridge]
 Width of Bridge B = [0.40+(2x2.0)+11.0] = 15.40 m
 Depth of M.G = [L/10] = [50.0/10] = 5.0 m
 Depth of X.G = [B/7-9] = [15.40/7-9] = 2.0 m
 Spacing Between X.G a = [50.0/10] = 5.0 m
 Depth of Str = [a/10] = [5.0/10] = 0.50 m
 Spacing Between Str [1.75 m – 2.25 m] = 11.0/5 = 2.20 m
2000 11000 2000
5000

500

2200 2200 2200 2200 2200

15400

S.V.
5000 10x5000=50000

5000
10x5000=50000
ELEV.

10x5000=50000
15400

15400
10x5000=50000
PLAN.
LOWER BRACING.
Example No [2]:
o Road Way Bridge
o W-Truss Girder
o Deck Bridge
o Side Walk = 2.0 m & Road Way = 11.0 m
o Span = 50.0 m Divide [10] Equal Panels
[Solution]
 Width of M.G = 30 cm [Deck Bridge]
 Width of Bridge B = [0.30+(2x2.0)+11.0] = 15.30 m
 Depth of M.G = [L/10] = [50.0/10] = 5.0 m
 Depth of X.G = [B/7-9] = [15.30/7-9] = 2.0 m
 Spacing Between X.G a = [50.0/10] = 5.0 m
 Depth of Str = [a/10] = [5.0/10] = 0.50 m
 Spacing Between Str [1.75 m – 2.25 m] = 11.0/5 = 2.20 m
2000 11000 2000

500
2200 2200 2200 2200 2200
5000

15300

S.V.
5000 10x5000=50000

5000
10x5000=50000
ELEV.

10x5000=50000
15300

15300
10x5000=50000
PLAN.
UPPER BRACING.
10x5000=50000

Stability

15300
15300

10x5000=50000
PLAN.
LOWER BRACING.
Example No [3]:
o Road Way Bridge
o N-Truss Girder
o Through Bridge
o Spacing Between M.G [Width of Bridge] B = 11.30 m
o Side Walk = 2.0 m & Road Way = 10.0 m
o Span = 72.0 m Divide [8] Equal Panels
[Solution]
 Width of M.G = 30 cm [Through Bridge]
 Depth of M.G = [L/8] = [72.0/8] = 9.0 m [Through Bridge]
 Depth of X.G = [B/7-9] = [11.30/7-9] = 1.60 m
 Spacing Between X.G a = [72.0/8] = 9.0 m
 Depth of Str = [a/10] = [9.0/10] = 0.90 m
 Spacing Between Str [1.75 m – 2.25 m] = 10.0/5 = 2.0 m
9000

2000 10000 2000


900

2000 2000 2000 2000 2000

1350 11300 1350

S.V.
9000

8x9000=72000
ELEV.

8x9000=72000
1350

1350
11300
11300

1350
1350

8x9000=72000
PLAN.
LOWER BRACING.
11300

To Reduce Lb

Stability

To Reduce Lb
PLAN.
UPPER BRACING.
8x9000=72000
8x9000=72000

To Reduce Lb

11300