Wilmont's Pharmacy Project Plan

This document outlines the project plan for Wilmont's Pharmacy drone delivery program. It includes the critical path with key milestones such as completing the schedule, budget, risk management plan, customizing drone structures, developing flight paths and operations procedures, implementing the program, and closing out the project. The plan also shows task dependencies and identifies total slack for each task.

Uploaded by

Prathamesh Patil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
360 views2 pages

Wilmont's Pharmacy Project Plan

This document outlines the project plan for Wilmont's Pharmacy drone delivery program. It includes the critical path with key milestones such as completing the schedule, budget, risk management plan, customizing drone structures, developing flight paths and operations procedures, implementing the program, and closing out the project. The plan also shows task dependencies and identifies total slack for each task.

Uploaded by

Prathamesh Patil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Project: Wilmont' Pharmacy

Revision No.: 0
Revision Date: 08 May 21 Critical Path
9 2 11 11 3 14
6 3 9 1.2.6 – Risk 1.2.2 – Budget
Management Plan estimate
1.2.1 – Schedule
0 4 4 16 7 18 18 7 21
development
1.1.2 – Engage
Stakeholders 13 7 16
11 3 14 14 4 18
2 2 6
1.5.1 – Flight Path 1.5.2 – Flight path
Engineering testing
0 0 0 0 6 6 6 0 6 6 5 11 14 3 17 17 3 21
Start 1.1.1 – Develop Milestone – 1.3.1 – Drone
0 0 0 Scope and Plan End Initiating changes design
11 3 14 14 8 22
0 0 6 6 0 6 6 0 11
1.3.2 – Purchase 1.3.3 – Custom
0 3 3 6 3 9 materials drones structure
1.1.3 – Communication 1.2.5 – Processes
Management Plan 11 0 14 14 0 22
design
3 3 6 19 13 22
6 4 10 10 4 14
1.4.1 – Systems 14 3.5 17.5
1.4.2 – Specialized
changes design Customer order interface 1.4.3 – Custom
Management Reporting
11.5 5.5 15.5 15.5 5.5 19.5 Interface
Total Slack = TS = LF - EF = LS – ESEF = ES+ Duration
19.5 5.5 23
LS= LF-Duration

1 of 2
14 4 18 18 0 18
1.2.3 – Legal Contract Milestone –
Negotiations Contract assigned 28 0 28
21 7 25 25 7 25 Finish
28 0 28

18 2 20
1.5.3 – Pharmacy 22 2 24 24 0 24 25 2 27 27 1 28
manager drone 1.5.4 – Customization Milestone – End Flight 1.6.1 – Final 1.6.2 – Closing
operations procedures of Flight Processing operations implementation out the project
21 3 23 23 1 25 25 1 25 25 0 27 27 0 28

22 3 25
1.3.4 – Drone 25 0 25
maintenance Milestone – End
procedures Adapted drones
22 0 25 25 0 25

17.5 0 17.5
Milestone – End IT
and App interfaces
23 5.5 23