You are on page 1of 2

Project number 3 Unit numberQENM3/003

1-Follow BS7255, H/S and PPE use safety barrier when needed
keep the workplace clean before, during and after work.
2-Gloves, boots, erect barriers, lock and tog device
3-All documentation provided via office PDA, job sheets check and
manufacture information
4-Contact office/manufactures
5-All tools are stored in the van and checked before each use
6-Before any job activity tools are checked for damage and correct
operation
7-Send back to the office for repair or replacement do not use
8- Checked all materials on the job sheet and material list
9-Consult with the officer and replace/order, do not use on site
10- office via PDA
11- Sent job sheet with a customer sign via PDA
12-Anything that is not compatible with the work/activity
13-Waste is taken to office in the van and the correct disposed of in skip
or waste oil container
14-All tools are stored in the van when not in use
15-To improve safety, time taken and maybe reduce costs
16-Via phone, email or PDA
17-To become more efficient and reduce costs
18-To help complete tasks and maintain a happy workplace build a team
ethic
19-Report to the manager any situation, then try to resolve any problems
20-conflicts and tensions low engagement
21-Equality and diversity is about providing the same opportunity every
employee should be given equal opportunity to progress
22-To improve the knowledge and skills
23-NVQ
24-To keep progressing and improve skills
25-company ownership
26-To work withing knowledge and seek help from office when need