SUBMITTED BY:
CONTENTS
Sl. No Description Page No.
1 FORWARDING LETTER 03
CP STATIONS MONTHLY OPERATION AND MAINTENANCE REPORT 04
(a) ASHUGANJ- MONOHORDI (A-M) PIPELINE 05
(b) ASHUGANJ- ELANGA (B,B) (A-E) PIPELINE 06
(c) MONOHORDI-DHANUA (M-D) PIPELINE 07
(d) DHANUA- SAVAR (D-S) PIPELINE 08
2 (e) DHANUA- ELANGA (D-E) PIPELINE
(f) BEANIBAZAR-KALISHTILA (BB-KTL) PIPELINE 09
(g) NOUTH-SOUTH (N-S) PIPELINE 10-12
(h) RASHIDPUR-ASHUGANJ (R-A) PIPELINE
(i) ASHUGANJ- BAKHRABAD1 (A-B1) PIPELINE 13
(j) ASHUGANJ- BAKHRABAD2 (A-B2) PIPELINE
(k) BIBIYANA-DHANUA (B-D) PIPELINE 14
MONTHLY PIPE TO SOIL POTENTIAL (PSP) SURVEY REPORT 15
(a) ASHUGANJ- MONOHORDI (A-M) PIPELINE 16
(b) ASHUGANJ- ELANGA (B,B) (A-E) PIPELINE 17
(c) MONOHORDI-DHANUA (M-D) PIPELINE 18
(d) DHANUA- SAVAR (D-S) PIPELINE 19
(e) DHANUA- ELANGA (D-E) PIPELINE 20
(f) BEANIBAZAR-KALISHTILA (BB-KTL) PIPELINE 21
3
(g) NOUTH-SOUTH (N-S) PIPELINE 22
(h) RASHIDPUR-ASHUGANJ (R-A) PIPELINE 23
(i) ASHUGANJ- BAKHRABAD1 (A-B1) PIPELINE 24
(j) ASHUGANJ- BAKHRABAD2 (A-B2) PIPELINE 25
(k) BIBIYANA-DHANUA (B-D) PIPELINE 26
(l) TITAS-AB PIPELINE 27
(m) SRIKAIL-AB PIPELINE 28
(n) TITAS-KHATIHATA- MALIHATA PIPELINE 29
(o) TITAS-CBA PIPELINE 30
4 MONTHLY PIPE TO SOIL POTENTIAL (PSP) SURVEY GRAPHICAL 31-45
REPORT
5 SUMMARY OF WORK PROGRESS AS OF FEBRUARY 2021 46-47
6 CONCLUSION 48
Date:
Subject: Monthly CP system Maintenance report for the month of February 2021
Your Ref: Operation and Maintenance works of the Cathodic Protection (CP) System of GTCL
operated High Pressure Gas Transmission Pipelines under PART-A.
Dear Sir,
Reference to the above-mentioned works, we hereby submit 03 (three) copies of our Monthly
CP System Monitoring report for the month of February 2021 as per Section (f): Technical
Specifications (scope of work) of the contract.
We therefore request your kind acceptance of the report as it conforms to stipulation of the
Contract meeting your requirements.
Yours Sincerely
NORTH - SOUTH (24” DIA. X 175 KM LONG), RASHIDPUR – ASHUGANJ (30” DIA. X 82 KM LONG) HIGH
PIPELINE NAME :
PRESSURE GAS AND NORTH – SOUTH (6” DIA. X 175 KM LONG) CONDENSATE TRANSMISSION PIPELINE.
CP Station Maintenance Information
Before Maintenance After Maintenance
CP Station Fuel TEG G.B V. TEG G.B V.
SI TEG No. Description Drain Drain
Observation Present Pressure Without Input Without Input
No. (Model 1120) Completed work Output Point Output Point Inspection Date
Status (psi) Reg. Drop Ampere Reg. Drop Amper
Voltage PSP Voltage PSP
Voltage (A) Voltage e (A)
(V) (mV) (V) (mV)
(V) (V)
CP Station-1: Kailashtilla-2, Golapganj, Sylhet.
5418-Q9k Found Running Running TEG Filter Cleaning,
1. 5 Necessary servicing and 5.92 4.92 3.00 1068 5.92 4.92 3.00 1068 07.02.21
5418-Q9k Found Standby Inactive
voltage adjustment done
CP Station-2: Chowdhury Bazar, Golapganj, Sylhet.
5449-O9K Found Standby Standby
5450-Q9K Found Standby Standby
5451-O9K Found Standby Standby
5452-Q9K Found Standby Standby TEG Filter Cleaning,
2 5454-Q9K Found Running Running 6 Necessary servicing and 3.40 - 0.81 1206 3.40 - 0.81 1206 07.02.21
voltage adjustment done
5455-O9K Found Standby Standby
5456-Q9K Found Standby Standby
5457-Q9K Found Running Running
5458-O9K Found Standby Standby
CP Station-3: Fenchugonj, Sylhet.
5409-Q9K Found Standby Standby
5410-Q9K Found Standby Standby
5412-Q9K Found Standby Standby TEG Filter Cleaning,
3 5414-Q9K Found Standby Standby 5.2 Necessary servicing and 6.76 - 0.60 1245 6.76 - 0.60 1245 08.02.21
voltage adjustment done
5415-Q9K Found Running Running
5416-Q9K Found Standby Standby
5417-Q9K Found Standby Standby
CP Station-4: Mostafapur, Moulavibazar
4 5420-Q9k Found Standby Standby 5.6 TEG Filter Cleaning, 7.39 - 3.03 1395 7.39 - 3.03 1395 08.02.21
Gas Transmission Company Limited (GTCL) Pipeline Integrity Department P a g e | 10
CP System Maintenance Report of GTCL Pipelines (PART-A) Month: February 2021
Page-
OPERATION AND MAINTENANCE REPORT OF GTCL
PIPELINES (PART-A) CP SYSTEM
2
(h) RASHIDPUR-ASHUGANJ (R-A) PIPELINE
PART-A
(i) ASHUGANJ- BAKHRABAD1 (A-B1) PIPELINE
Sl. Test Chain Location PSP Pipe PSP Min PSP Inspection Date Remarks
No Ref age km 24” -mV Casing” req.
No -mV -mV
Sl. Test Chain Location PSP- 30” PSP Min PSP Inspection Remarks
No Ref age -mV Casing” req. mV Date
No km -mV
1 1 0 Monohordi (Drain Point) 1341 850 02.02.21
2 13 8.6 Changra Uttar Para 1208 850 02.02.21
3 44 28.95 Sreepur CP Station 1426 850 02.02.21 CP Station
4 54 35.75 Chatir Bazar 1226 850 02.02.21
5 56 37.5 Dhanua CP Station 1445 850 02.02.21 CP Station
Sl. Test Chain age Location PSP- 20” PSP Min PSP Inspection Date Remarks
No Ref km -mV Casing” req.
No -mV -mV
1 1 0.00 Dhanua Valve Station 1329 850 04.02.21
2 22 18.50 Panshail CP Station 1347 850 04.02.21 CP station
3 25 22.50 Baroi Chala 1243 850 04.02.21
4 32 31.75 Kodda Valve Station 1275 850 04.02.21 CP station
5 40 40.00 Poiashona 1274 850 04.02.21
6 44 45.50 Ashulia CP Station 1445 850 04.02.21 CP station
7 53 60.00 Aminbazar CGS 1141 850 04.02.21
Sl. Test Chain age Location PSP- 20” PSP Min PSP Inspection Date Remarks
No Ref km -mV Casing” req.
No -mV -mV
03 0.05 Dhaka- Mymensingh 04.02.21
1 1242 850
Highway Road U.S
2 15 31.60 Tonki River 1 1347 850 04.02.21
3 33 Moshinda Razabari 1243 850 04.02.21
Sl. Test Chain age Location PSP- PSP- 4” Min PSP Inspection Date Remarks
No Ref km 20” -mV Req.
No -mV -mV
1 1 0.00 Inside of Beanibazar Gas Field 1011 956 850 07.02.21
2 6 5.20 Nalful- Beanibazar road D.S 1261 1272 850 07.02.21 CP Station
3 10 13.10 Kadam Rasul CP Station 1348 1279 850 07.02.21
4 16 18.00 Inside of KTL-2 1158 1160 850 07.02.21
Pipeline Name: Ashuganj-Monohordi High Pressure Gas Transmission Pipeline. (30'' Dia, 37km)
1600
1400
1200
1000
PSP (mV)
800
Pipe 30"
400
200
0
0 10.9 22.5 28 36.7
Chainage (km)
Pipeline Name: Ashuganj- Elenga/ Brahmaputra Basin (B.B) High Pressure Gas Transmission Pipeline.
(24” Dia, 125km Long)
1600
1400
1200
1000
PSP (mV)
800
Pipe 24"
400
200
0
0 11.50 20.48 36.2 58.55 75.25 92.05 95.75 115.35 125
Chainage (km)
Pipeline Name: Monohordi-Dhanua High Pressure Gas Transmission Pipeline. (30” Dia, 37km Long)
1600
1400
1200
1000
PSP (mV)
800
Pipe 30"
400
200
0
0 8.6 28.95 35.75 37.5
Chainage (km)
Pipeline Name: Dhanua- Savar High Pressure Gas Transmission Pipeline. (20” Dia, 60 km Long)
1600
1400
1200
1000
PSP (mV)
800
Pipe 20"
400
200
0
0 18.5 22.5 31.75 40 45.5 60
Chainage (km)
Pipeline Name: Dhanua- Elanga High Pressure Gas Transmission Pipeline. 30” Dia, 52 km Long)
1600
1400
1200
1000
PSP (mV)
800
Pipe 30
600 Minimum PSP
400
200
0
0.05 31.6 50
Chainage (km)
Pipeline Name: Beanibazar - Kailastilla High Pressure Pipeline(20" Dia., × 18 Km Long) & Beanibazar-
Kailashtilla Condensate Transmission Pipeline. (4” Dia., ×18 Km Long)
1600
1400
1200
1000
PSP (mV)
400
200
0
0 5.2 13.1 18
Chainage (km)
Pipeline Name: North - South (24” dia. × 175 km Long), High Pressure Gas and North – South (6” dia. ×
175 km Long) Condensate Transmission Pipeline.
1600
1400
1200
1000
PSP (mV)
400
200
0
0 2 9 24 27 36 63 69 93 97 102 113 122 132 139 149 162 175
Chainage (km)
Pipeline Name: Rashidpur – Ashuganj (30” Dia. × 82 Km Long) High Pressure Gas Transmission Pipeline.
1400
1200
1000
800
PSP (mV)
Pipe 30"
600
Minimum PSP
400
200
0
0 17 34.3 70 82
Chainage (km)
1400
1200
1000
PSP (mV)
800
Pipe 20"
Minimum PSP
600
400
200
0
2
Chainage (km)
Pipeline Name: Ashuganj - Bakhrabad High Pressure Gas Transmission Pipeline. (30” Dia. × 58.5
Km Long)
1600
1400
1200
1000
PSP (mV)
800
Pipe 30"
600 Minimum PSP
400
200
0
0 10 23 35 48 58
Chainage (km)
Pipeline Name: GTCE A-B High Pressure Gas Transmission Pipeline. (30” Dia., × 61 Km Long)
1400
1200
1000
800
PSP (mV)
Pipe 30"
600
Minimum PSP
400
200
0
0 13 29 61
Chainage (km)
Pipeline Name: Titas– AB High Pressure Gas Transmission Pipeline. (24” Dia. × 7.5 Km Long)
1400
1200
1000
800
PSP (mV)
Pipe 20"
600
Minium PSP
400
200
0
0 5 7.5
Minimum PSP
Pipeline Name: Srikail– Ab High Pressure Gas Transmission Pipeline. (20” Dia. × 1.2 Km Long)
1200
1000
800
PSP (mV)
600
Pipe 20"
Minimum PSP
400
200
0
0.2
Chainage (km)
Pipeline Name: Titas CBA-Soybaria (10.75” Dia, 7.7 Km Long) High Pressure Gas Transmission
Pipeline
1400
1200
1000
800
PSP (mV)
Pipe 20"
600
Minimum PSP
400
200
0
2.15 7
Chainage (km)
Pipeline Name: Bibiyana- Dhanua High Pressure Gas Transmission Pipeline. (36” Dia, 137km Long)
1600
1400
1200
1000
PSP (mV)
800
Pipe 36"
Minimum PSP
600
400
200
0
0 3.42 6.74 30.08 36.62 40.93 55.66 84.42 91.37 95.83 107.18 118.58 136
Chainage (km)
4 Accommodation 324 90 09 99
Remarks:
Conclusion: Pipe to Soil Potential (PSP) readings were found within the
acceptable level which indicates Pipelines are well protected with the
Operational CP System.
Reported by:
SUBMITTED BY:
Contract Name: Operation and Maintenance works of the Cathodic Protection (CP) System of
GTCL operated High Pressure Gas Transmission Pipelines under PART-B.
CONTENTS
Sl. No Description Page No.
1 FORWARDING LETTER 03
CP STATIONS MONTHLY OPERATION AND MAINTENANCE REPORT 04
(a) ELANGA-JAMUNA (E-J) PIPELINE 05
2 (b) ELANGA-BAGHABARI (E-B) PIPELINE 06
(c) NALKA- BOGURA (N-B) PIPELINE 07
(d) HATIKUMRUL-BHERAMARA (H-B) PIPELINE 08
(e) BONPARA-RAJSHAHI (B-R) PIPELINE 09
(f) BHERAMARA-KHULNA (B-K) PIPELINE 10
(g) BOGURA-SAYEDPUR( B-S) PIPELINE 11
3 TRANSFORMER RECTIFIER REPORT 12-14
MONTHLY PIPE TO SOIL POTENTIAL (PSP) SURVEY REPORT
(a) ELANGA-JAMUNA (E-J) PIPELINE 14
(b) ELANGA-BAGHABARI (E-B) PIPELINE 15
4
(c) NALKA- BOGURA (N-B) PIPELINE 16
(d) HATIKUMRUL-BHERAMARA (H-B) PIPELINE 17
(e) BONPARA-RAJSHAHI (B-R) PIPELINE 18
(f) BHERAMARA-KHULNA (B-K) PIPELINE 19
(g) BOGURA-SAYEDPUR( B-S) PIPELINE 20
5 MONTHLY PIPE TO SOIL POTENTIAL (PSP) SURVEY GRAPHICAL REPORT 22-28
6 SUMMARY OF WORK PROGRESS AS OF FEBRUARY 2021 29-30
7 CONCLUSION 31
Date:
Subject: Monthly CP system Maintenance report for the month of February 2021
Your Ref: Operation and Maintenance works of the Cathodic Protection (CP) System of GTCL
operated High Pressure Gas Transmission Pipelines under PART-B.
Dear Sir,
We therefore request your kind acceptance of the report as it conforms to stipulation of the
Contract meeting your requirements.
Yours Sincerely
Page |4
CP System Maintenance Report of GTCL Pipelines (PART-B) Month: February, 2021
Page |5
CP System Maintenance Report of GTCL Pipelines (PART-B) Month: February, 2021
Sl. Location PSP Min PSP Inspection Date Sl. Location PSP Min PSP Inspection Date
No (-mV) -mV No (-mV) -mV
1 KOD Condensate Dram 6 Hater Outlet line
2 Filter Condensate Dram 7 DRS Metering Unit
3 Filter Outlet Line 8 Liquid Separator Condensate Dram
4 Hater Fuel line 9 Condensate Dram
5 Hater Inlet line 10 Generator Fuel line
CP Station-2: PutiaTBS
Found Running Running TR Cleaning, Necessary servicing and voltage adjustment done 2.00 0.38 2.00 0.38
Sl. Location PSP Min PSP Inspection Date Sl. Location PSP Min PSP Inspection Date
No (-mV) -mV No (-mV) -mV
1 KOD Condensate Dram 6 Hater Outlet line
2 Filter Condensate Dram 7 DRS Metering Unit
3 Filter Outlet Line 8 Liquid Separator Condensate Dram
4 Hater Fuel line 9 Condensate Dram
5 Hater Inlet line 10 Generator Fuel line
CP Station-3: Tamaltala TBS
Found Running Running TR Cleaning, Necessary servicing and voltage adjustment done
Sl. Location PSP Min PSP Inspection Date Sl. Location PSP Min PSP Inspection Date
No (-mV) -mV No (-mV) -mV
1 KOD Condensate Dram 6 Hater Outlet line
2 Filter Condensate Dram 7 DRS Metering Unit
3 Filter Outlet Line 8 Liquid Separator Condensate Dram
4 Hater Fuel line 9 Condensate Dram
5 Hater Inlet line 10 Generator Fuel line
Sl. Location PSP Min PSP Inspection Date Sl. Location PSP Min PSP Inspection Date
No (-mV) -mV No (-mV) -mV
1 KOD Condensate Dram 6 Hater Outlet line
2 Filter Condensate Dram 7 DRS Metering Unit
3 Filter Outlet Line 8 Liquid Separator Condensate Dram
4 Hater Fuel line 9 Condensate Dram
5 Hater Inlet line 10 Generator Fuel line
CP Station-5: Kushtia TBS
Found Running Running TR Cleaning, Necessary servicing and voltage adjustment done 5 0.09 6 0.12
Sl. Location PSP Min PSP Inspection Date Sl. Location PSP Min PSP Inspection Date
No (-mV) -mV No (-mV) -mV
1 KOD Condensate Dram 6 Hater Outlet line
2 Filter Condensate Dram 7 DRS Metering Unit
3 Filter Outlet Line 8 Liquid Separator Condensate Dram
4 Hater Fuel line 9 Condensate Dram
5 Hater Inlet line 10 Generator Fuel line
CP Station-6: Zhenidah TBS
Found Running Running TR Cleaning, Necessary servicing and voltage adjustment done
Sl. Location PSP Min PSP Inspection Date Sl. Location PSP Min PSP Inspection Date
No (-mV) -mV No (-mV) -mV
1 KOD Condensate Dram 6 Hater Outlet line
2 Filter Condensate Dram 7 DRS Metering Unit
3 Filter Outlet Line 8 Liquid Separator Condensate Dram
4 Hater Fuel line 9 Condensate Dram
5 Hater Inlet line 10 Generator Fuel line
Sl. Location PSP Min PSP Inspection Date Sl. Location PSP Min PSP Inspection Date
No (-mV) -mV No (-mV) -mV
1 KOD Condensate Dram 6 Hater Outlet line
2 Filter Condensate Dram 7 DRS Metering Unit
3 Filter Outlet Line 8 Liquid Separator Condensate Dram
4 Hater Fuel line 9 Condensate Dram
5 Hater Inlet line 10 Generator Fuel line
Sl. Location PSP Min PSP Inspection Date Sl. Location PSP Min PSP Inspection Date
No (-mV) -mV No (-mV) -mV
1 KOD Condensate Dram 6 Hater Outlet line
2 Filter Condensate Dram 7 DRS Metering Unit
3 Filter Outlet Line 8 Liquid Separator Condensate Dram
4 Hater Fuel line 9 Condensate Dram
5 Hater Inlet line 10 Generator Fuel line
Page-
OPERATION AND MAINTENANCE REPORT OF GTCL
PIPELINES (PART-B) CP SYSTEM
PSP Min
SI. Test Chainage PSP Pipe Casing PSP
Location Inspection Date Remarks
No No (km) 30” -mV ” req.
-mV -mV
1 1 0.00 Elenga CP Station 1340 850 11.02.2021 CP station
PSP Min
SI. Test Chainage PSP Pipe Casing PSP
Location Inspection Date Remarks
No No (km) 30” -mV ” req.
-mV -mV
1 05 1.79 Saydabad Road Crossing D.S. 1100 1200 850 11.02.2021 CP station
1070 850
Min
Test PSP
SI. Location PSP Pipe PSP Inspection
Post Location Casing Remarks
No (km) 24” -mV req. Date
No. -mV
-mV
1 1 0.00 Elenga Metering Station 1000 850 11.02.2021
Min
Test PSP
SI. Location PSP Pipe PSP Inspection
Post Location Casing” Remarks
No (km) 30” -mV req. Date
No. -mV
-mV
1 1 0.00 Nalka Valve Station 1205 850 10.02.2021
Sl. Test Chain Location PSP- PSP- Min Inspection Date Remarks
No Ref age km 12.75” Casing PSP
No -mV -mV Req.
-mV
1 1 0.00 Boanpara CP Station 1440 850 24.02.2021
2 26 17.327 Tomal Tola CP Station 1440 850 24.02.2021 CP station
3 43 28.076 Putia-Anari Road (D.S) 1300 850 24.02.2021
4 65 41.844 Belpukuria CP Station 1280 850 24.02.2021 CP station
Pipeline Name: Elenga-Jamuna High Pressure Gas Transmission Pipeline. (30” Dia, 13km Long)
1600
1400
1200
1000
PSP (mV)
800
Pipe 30"
400
200
0
0 12 15
Chainage (km)
Pipeline Name: West Side Jumana Bridge - Nalka High Pressure Gas
Transmission Pipeline. (30” Dia, 13km Long)
1200
1000
800
PSP (mV)
600
Pipe 30"
Minimum PSP
400
200
0
1.79 15.5
Chainage (km)
Pipeline Name: Elenga-Baghabari (Elenga-J, River East, J River West-Nalka (24” dia, 28.50km Long,
Bridge Section 30” dia, 9km Long & Nalka – Bagabari 20” dia, 35.50km Long, Total =73 Km Long)
High Pressure Gas Transmission Pipeline
1600
1400
1200
1000
Axis Title
800
Pipe 24" 20"
600 Minimum PSP
400
200
0
0 28.5 35 42 47 73
Axis Title
Pipeline Name: Nalka – Bogra (Nalka-Hatikumrul 30” dia, 6.20km long & Hatikumrul-Bogra 20”
dia, 53.8km long, Total =60km long) High Pressure Gas Transmission Pipeline
1600
1400
1200
1000
PSP (mV)
800
Pipe 30" & 20"
400
200
0
1 2 Chainage (km) 3 4 5
Pipeline Name: Hatikumrul-Bheramara High Pressure Gas Transmission Pipeline (30” dia, 82km
long)
1600
1400
1200
1000
PSP mV)
800
Pipe 30"
400
200
0
0 3.8 12.9 40 44.3 52.3 66.4 69.35 82
Chainage (km)
Pipeline Name: Bonpara- Rajshahi High Pressure Gas Transmission Pipeline. (12.75” dia, 52km
long,)
1800
1600
1400
1200
PSP (mV)
1000
Pipe 12.75"
800
Minimum PSP
600
400
200
0
0 17.327 28.076 41.844 47.848 52
Chainage (km)
Pipeline Name: Bheramara-Khulna High Pressure Gas Transmission Pipeline. ( 20” dia, 163km long,)
1800
1600
1400
1200
1000
PSP (mV)
Pipe 20"
800
Minimum PSP
600
400
200
0
0 23 38 44 55.01 66 71 101 102 109
Chainage (km)
Conclusion: Pipe to Soil Potential (PSP) readings were found within the
acceptable level which indicates Pipelines are well protected with the
Operational CP System.
Reported by:
SUBMITTED BY:
CONTENTS
SI No. Description Page No.
1 FORWARDING LETTER 03
Date:
Subject: Monthly CP system Maintenance report for the month of February 2021
Your Ref: Operation and Maintenance works of the Cathodic Protection (CP) System of GTCL
operated High Pressure Gas Transmission Pipelines under PART-C.
Dear Sir,
Reference to the above-mentioned works, we hereby submit 03 (three) copies of our Monthly
CP System Monitoring report for the month of February 2021 as per Section (f): Technical
Specifications (scope of work) of the contract.
We therefore request your kind acceptance of the report as it conforms to stipulation of the
Contract meeting your requirements.
Yours Sincerely
Page |4
CP System Maintenance Report of GTCL Pipelines (PART-C) Month: February, 2021
Page |5
CP System Maintenance Report of GTCL Pipelines (PART-C) Month: February, 2021
MAHESHKHALI- ANOWARA (M-A) HIGH PRESSURE GAS TRANSMISSION PIPELINE( PARALAL) (42″
PIPELINE NAME :
OD, 79 Km)
PIPELINE NAME : ZEROPOINT-CTMS HIGH PRESSURE GAS TRANSMISSION PIPELINE(42″ OD, 6 Km)
3 20 20.75 Goripur TBS & CPS-02 1490 850 14.02. 2021 CP Station
Pipeline Name: Bakhrabad-Shiddhirgonj (B-S) High Pressure Gas Transmission Pipeline (30″ od, 60 Km)
Min
Test PSP
SI. Location PSP Pipe PSP Inspection
Post Location Casing” Remarks
No (km) 30” -mV req. Date
No. -mV
-mV
1 01 0.00 Take Off Point Bakhrabad 1155 850 17.02.21
Pipeline Name: Anowara - Fouzdarhat (A-F) High Pressure Gas Transmission Pipeline
(42″ OD, 30km)
PSP
Test PSP Min PSP
SI. Location Pipe Inspection
Post Location Casing” req. Remarks
No (km) 42” - Month
No. -mV -mV
mV
1 1 0.00 Drain Point (Anowara) 1210 850 18.02.21 CP station
Pipeline Name: Maheshkhali- Anowara (M-A) High Pressure Gas Transmission Pipeline
(30″ od, 91 km)
PSP Min
Test PSP
SI. Location Pipe PSP Inspection
Post Location Casing” Remarks
No (km) 30” - req. Date
No. -mV
mV -mV
1 1 0.00 Zero Popint,Maheshkhali (SP) 1221 850 22.02.21
4 17 17.16 Nuna Chara Mat Bazar Road (SP) 1169 850 22.02.21
5 31 28.17 Uzantia River Crossing (DS) 1172 850 22.02.21
Pipeline Name: Chattogram-Feni- Bakhrabad (CFB) High Pressure Gas Transmission Pipeline
(36″ od, 178km)
Test PSP Min PSP
SI. Location PSP Pipe Inspection
Post Location Casing req. Remarks
No (km) 24” -mV Date
No. -mV -mV
1 01 0.00 Salimpur Valve Station 1202 850 16.02.21
Pipeline Name: Maheshkhali- Anowara (M-A) High Pressure Gas Transmission Pipeline
Parallel (42″ od, 79 km)
Min
Test PSP PSP
SI. Location PSP
Post Location Pipe Casing” Inspection Date Remarks
No (km) req.
No. 30” -mV -mV
-mV
1 1 0 CTMS Valve Station 1238 850 23.02.21
Pipeline Name: Zero point- CTMS High Pressure Gas Transmission Pipeline (42″ od, 6 km)
Pipeline Name: Bakhrabad-Demra (BKB-D) High Pressure Gas Transmission Pipeline (20″ od, 68.72km)
1600
1400
1200
1000
PSP (mV)
800
Pipe 20"
Minimum PSP
600
400
200
0
0 15.5 20.75 34.75 59 68
Chainage (km)
Pipeline Name: Bakhrabad-Chattogram (BKB-CHT) High Pressure Gas Transmission Pipeline (24″ od,
178km)
1600
1400
1200
1000
PSP (mV)
800
Pipe 24"
400
200
0
0 10.5 44.9 50 56 73.5 89 102.5 126 147 152 157.3 164.8 178
Chainage (km)
Pipeline Name: Bakhrabad-Shiddhirgonj (B-S) High Pressure Gas Transmission Pipeline (30″ od, 60 Km)
1600
1400
1200
1000
PSP (mV)
800
Pipe 30"
400
200
0
0 8.845 30 55.5 59.823
Chainage (km)
Pipeline Name: Anowara - Fouzdarhat (A-F) High Pressure Gas Transmission Pipeline (42″ OD, 30km)
1400
1200
1000
800
PSP (mV)
Pipe 42"
600
Minimum PSP
400
200
0
0 4.04 16.04 23.08 28
Chainage (km)
Pipeline Name: Maheshkhali- Anowara (M-A) High Pressure Gas Transmission Pipeline (30″ od, 91 km)
1600
1400
1200
1000
PSP (mV)
800
Pipe 30"
Minimum PSP
600
400
200
0
0 4.55 6.75 17.16 28.17 47.42 55.44 64.78 70.46 80 91
Chainage (km)
Pipeline Name: Chattogram-Feni- Bakhrabad (CFB) High Pressure Gas Transmission Pipeline (36″ od,
178km)
1600
1400
1200
1000
PSP (mV)
800
Pipe 36"
Minimum PSP
600
400
200
0
0 7.42 14.5 24.25 30.92 45 50 72.02 77 78.5 84.68 107.3 129 150 165 181
Chainage (km)
Pipeline Name: Maheshkhali- Anowara (M-A) High Pressure Gas Transmission Pipeline Parallel (42″ od, 79
km)
1600
1400
1200
1000
PSP (mV)
800
Pipe 42"
Minimum PSP
600
400
200
0
0 6.78 16.76 24.67 34.42 47.25 54.15 59.95 79
Chainage (km)
Pipeline Name: Zero point- CTMS High Pressure Gas Transmission Pipeline (42″ od, 6 km)
1600
1400
1200
1000
PSP (mV)
800
Pipe 42"
Minimum PSP
600
400
200
0
0 3.05 6.2 6.75
Chainage (km)
Bakhrabad-Chattogram
Bakhrabad-Shiddhirganj
Monthly
Operation and Anowara-Fouzdarhat
1 Maintenance Maheshkhali-Anowara
736 164 22 186
of CP Stations
Chattogram-Feni-Bakhrabad
Maheshkhali-Anowara (Para.)
Zero Point-CTMS
Bakhrabad-Demra
Bakhrabad-Chattogram
Bakhrabad-Shiddhirganj
Monthly Pipe
Anowara-Fouzdarhat
to Soil
2 1560 332 48 380
Potential Maheshkhali-Anowara
(PSP) Survey
Chattogram-Feni-Bakhrabad
Maheshkhali-Anowara (Para.)
Zero Point-CTMS
4 Accommodation 252 70 7 77
Remarks:
Conclusion: Pipe to Soil Potential (PSP) readings were found within the
acceptable level which indicates Pipelines are well protected with the Operational
CP System.
Reported by: