You are on page 1of 2

Livan Trade Corp

ESH INSPECTION FORM


PROJECT NAME Livan Trade J. Ruiz REPORT NUMBER 2
INSPECTOR SCPOBRE DESIGNATION SO/PCO
DATE OF INSPECTION 7.8.2021 TIME 09:41 AM

ESH AREAS OF CONCERN


1. SAFETY MANAGEMENT 12. VEHICLES / TRANSPORT
2. HEALTH & WELFARE 13. ACCESS, EGRESS& WALKWAYS
3. FIRST AID 14. EXCAVATION/EARTHWORKS
4. FIRE PRECAUTIONS 15. GUARDING/FENCING/BARRIERS
5. HOUSEKEEPING 16. GAS /FLAMMABLE LIQUIDS
6. PPE/SAFETY EQUIPMENT 17. HAZARDOUS SUBSTANCES
7. ELECTRICITY 18. SAFETY PROCEDURES
8. TOOLS 19. SAFETY SIGNS/NOTICES
9. PLANT/MACHINERY 20. SCAFFOLD / WORKS AT HEIGHT
10. LIFTING GEAR / EQUIPMENT 21. CONFINED SPACE
11. ENVIRONMENTAL 22. OTHERS

RECOMMENDED ACTION
N PRIOR
O AREA OBSERVATION (All Actions are to be completed within the ACTIONEE
. suggested time frame indicated in the ITY*
PRIORITY column)

1 J. P1 Edmar / Edel
Ruiz- Geronimo
Rest
room Cleaning and
besid repainting
e done by Edel
water Geronimo
office

Rest room dirt wall with black hand print water and scrub it on the stains, using
(BEFORE) a sponge or other nonabrasive cleaning
implement to removed black print and
repaint. (AFTER)

REPORT REVIEW:
AREA REVIEW DATE REVIEW TO BE PERFORMED BY: PERSON REQUIRED FOR REVIEW
j.ruiz 7.8.2021 Edmar/ Raoul Elmido Raoul Elmido

Page 1 of 2
Person Making Report:
NAME DESIGNATION SIGNATURE DATE

SCPOBRE SAFETY OFFICER/PCO

Distribution:
COO PROJECT
ESH

*Action Priority Levels


P1 - for action requiring 3 calendar days at the most
P2 - for action requiring 7 calendar days at the most
P3 - for action requiring 14 calendar days at the most
P4 - for action requiring 30 calendar days at the most
P5 - for action requiring more than 30 calendar days

Page 2 of 2

You might also like