Date 2020.12.20
PROSEDURES page
2
Sign Date
Number and job SOIL TEST (SPT and SLT) Prepared by Position
tittle
Sign Date
PIC SYNOHIDRO VICTORY JO Reviewed by Position
Sign Date
Section SOIL IMPROVEMENT Approved by Position
PPE (personal protective equipment) must be used : Locations : Kediri International Airport, Dhoho, Settlement 4
Site person in charge:
1. Required : Safety Shoes, Vest, Safety Helmet
Work Step Risk identifications Risk Level Safety Measurement and prevention Risk Level
Basic step and toll used correlation between each step of work to the Level of Risk action taken to reduce risks that could make an accident,
possibility of an accident identifications injuries and occupational disease Level of risk
after
prevention
1
Preparation
1.1 Mobilization of equipment & 1.1.1 Involvement of unskilled High Risk 1.1.1.1 Trained the operator to be authorized for working
Materials personnel
1.1.1.3 To ensure there is nobody around the work area. Low Risk
1.1.2 Movement in restricted areas Medium Risk 1.1.2.1 Doing tol box meeting before working
1.1.2.2 Using Spoter to helping the operator when moving Low Risk
the machine
1.1.3 Machine and tools malfunction Medium Risk 1.1.3.1 Doing commissioning check before using the
occurs that causes an accident machine and tools
1.1.4 Crushed by an object and worker High Risk 1.1.4.1 Using Spoter to helping the operator when moving
when the machine move the machine
1.1.4.2 Keep a distance from the machine when directing Low Risk
the machine to a new point.
1.3.2 Not Familiar yet with the project High Risk 1.3.1.3 Conduct HSE Induction
2
Standard Penetration Test (SPT)
2.1 Underground and Overhead 2.1.1 Buried power, gas & water High Risk 2.1.1.1 Insure clearance and non-member utillities are Low Risk
Utilities lines, fibre optics, overhead contacted and cleared
lines
2.2 Pretrip 2.2.1 Tripping, Falling, Pinching, High Risk 2.2.1.1 Always perform equipment inspections before and Low Risk
Crushing, Burns, Lifting, after operations (pre and post)
Bending, Pulling, Twisting
2.3 Loading Equipment 2.3.1 Backing truck or equipment Medium Risk 2.3.1.1 Display appropriate warning signs, Wear Low Risk
into objects/ people or off the side appropriate PPE - if using Truck mounted drill rig
of a trailer, Unsecured loads, - be sure all transported equipment and tools are
Tripping, Falling, Pinching, properly secured.
Crushing, Moving Parts, Burns,
Lifting, Bending, Pulling, Twisting
2.4 Traffic Control Setup 2.4.1 Tripping, Falling, Pinching, High Risk 2.4.1.1 Follow your traffic control plan) and insure the
Crushing, Moving Parts, Burns, plan is on location. Mark all overhead obstructions
Lifting, Bending, Pulling, with cones, signs, or flags. Always use
Twisting, Backing equipment into attenenuator trucks when available and TEST your
objects/ people, Traffic plan and insure it is working properly.
2.4.2 Worn/faded/dirty traffic control Medium Risk 2.4.2.1 Use clean and legible traffic control devices
devices
2.4.3 Getting struck by traffic or Medium Risk 2.4.3.1 Use identified escape routes in your traffic control
equipment plan – always have a set of eyes watching traffic
2.4.4 Signs blowing over Medium Risk 2.1.4.1 Use sandbags Low Risk
2.5 Traffic control removal 2.5.1 tripping,falling,pinching,crushing, High Risk 2.5.1 .1 Remove signs and other safety devices in
moving parts, Burns, Lifting, accordance with Methods of Handling Traffic.
Bending, Always use attenenuator trucks when available,
Pulling, Twisting, Backing notify the traffic management center and public
equipment into objects/ relations when work is completed, utilize law
people, Traffic enforcement when available, wear appropriate
PPE
2.6 Unloading equipment 2.6.1 Backing truck or equipment High Risk 2.6.1.1 Use a spotter, Do a walk around, Proper unloading
into objects/ people, of equipment, Wear appropriate PPE
Unsecured loads, Tripping,
Falling, Pinching, Crushing,
Moving Parts, Burns, Lifting,
Bending, Pulling, Twisting
2.7 Post Trip at the machine 2.7.1 Tripping, Falling, Pinching, High Risk 2.7.1.1 Always perform equipment inspections before and
Crushing, Burns, Lifting, after operations (pre and post)
Bending, Pulling, Twisting
2.7.2 Pinched, injured, scratched 2.7.1.2 Install the cover to the flywheel (fan belt)
2.8 Working at height 2.8.1 Fell, slipped, crushed 2.8.1.1 Use the Full Body Harness double hook (2) when
High Risk work
3
Static Loading Test (SLT)
3.1 Mobilization of workers and 3.1.1 3.1.1.1 Refer to Safety Policy and Conduct Tool Box
equipment Meeting
Non – compliance of Safety
Medium Risk
Policy
3.2 Making Load Arrangement 3.2.1 Make sure that proper acess shall be there for the
installation of the of shackels and slings
Improper Access 3.2.1.1
Medium Risk
Low Risk
3.2.2 Gloves shall be used during the installation of a
Hand Injury 3.2.1.2 rigging gears.
3.3 Lifting Load with Chain Block 3.3.1 Gloves shall be used during the installation of a
Hand Injury Medium Risk 3.3.1.1 rigging gears.
4.1 Night shift. 4.1.1 Hit High Risk 4.1.1.1 Before working, a special person is responsible for
checking and confirming that the lighting facilities
are and intact
4.2.1.3
Noise Set up reminders in the working area to
inform noise work
5 5.1 Installed Electrical 5.1.1 Electrocution High Risk 5.1.1.2 elecrical material must be standard
regulation
5.1.1.3 Electrical source avoid with flood/ water/ rainy
7.1.1 Crash High Risk 7.1.1.2 following traffic sign and speed limits on
the project
7.1.1.3 using corporate transportation