1- MAJOR ACTIIVITIES :
1-
2-
3
CONCORSE LEVEL
1-
2-
1
DESIGN & BUILT PACKAGE 4
GREEN LINE UNDERDROUND
Date-: 12-02-2019
CONSTRUCTION DAILY REPORT – GREEN LINE UNDERGROUND FIRE TELEPHONE SYSTEM
3
PLAT FORM LEVEL
1
2
3
UNDER PLATFORM
1
2
3
Station 2 AL SHAQAB
GRADE LEVEL
1-
2-
CONCORSE LEVEL
1-
2-
2
DESIGN & BUILT PACKAGE 4
GREEN LINE UNDERDROUND
Date-: 12-02-2019
CONSTRUCTION DAILY REPORT – GREEN LINE UNDERGROUND FIRE TELEPHONE SYSTEM
1
2
UNDER PLATFORM
1
2
3
Station 3 QNL ST
GRADE LEVEL
1-
2-
CONCORSE LEVEL
1- Concourse level west 300meters cable pulling completed.
2- Concourse level central 540meters cable pulling completed.
UNDER PLATFORM
3
DESIGN & BUILT PACKAGE 4
GREEN LINE UNDERDROUND
Date-: 12-02-2019
CONSTRUCTION DAILY REPORT – GREEN LINE UNDERGROUND FIRE TELEPHONE SYSTEM
1 Platform east&west 6 jackbox&cc1 box installed.
2
3
2- MANPOWER DETAILS :
First Shift : Second Shift :
TOTAL
TOTAL
DESIGNATION
Q-MEP Q-MEP
SUB-CONTRACTORS SUB-CONTRACTORS
4
DESIGN & BUILT PACKAGE 4
GREEN LINE UNDERDROUND
Date-: 12-02-2019
CONSTRUCTION DAILY REPORT – GREEN LINE UNDERGROUND FIRE TELEPHONE SYSTEM
Q-MEP
Q-MEP
HTC
HTC
Project Director / Management 1 1
QA/QC 1
Engineer 2
Site Doctor
HSE Officer/Nurse 1
Land Surveyor
Doc. Controller
Survey Assistant
Management and indirect
Time Keeper
Storekeeper 1
Office Boy
Security
Visitors
Others (Admin, Account,
Designer &Planner, QS, ETC.)
Total: 3 4 7
TOTAL
TOTAL
5
DESIGN & BUILT PACKAGE 4
GREEN LINE UNDERDROUND
Date-: 12-02-2019
CONSTRUCTION DAILY REPORT – GREEN LINE UNDERGROUND FIRE TELEPHONE SYSTEM
DESIGNATION
Q-MEP Q-MEP
SUB-CONTRACTORS SUB-CONTRACTORS
Q-MEP
Q-MEP
HTC
HTC
Foreman/Supervisor/CH 4
Driver/Operator 3
Scaffolder
Carpenter
Mason
Direct (site) Steel fixer / Erector
Electrician 16
Technician / Helper 28
Mechanic & Auto Elec
Plumber
Welder
Unskilled Workers
Pipe Fitter
Rigger/Flagman
Other Skilled Workers
6
DESIGN & BUILT PACKAGE 4
GREEN LINE UNDERDROUND
Date-: 12-02-2019
CONSTRUCTION DAILY REPORT – GREEN LINE UNDERGROUND FIRE TELEPHONE SYSTEM
TOTAL 5 44
4- MATERIAL DELIVERY :
No Material Descriptions Quantity Unit Supplier Reference No
1 25mm Conduit pipe 2Nos 60Mtr
2 single way box 1Box
3 L box 20 Nos
4 Flexible cable 1 box
5 Copper push male 1box
6 Copper push big 1box
7 Coupler 2boxes
8 Jack box 12Nos
9 Back box 12Nos
10 Fire rated cable 1000 meters
11 jackbox 5 nos
12
13
5 REMARKS ANDNOTES:
7
DESIGN & BUILT PACKAGE 4
GREEN LINE UNDERDROUND
Date-: 12-02-2019
CONSTRUCTION DAILY REPORT – GREEN LINE UNDERGROUND FIRE TELEPHONE SYSTEM
4-
8
DESIGN & BUILT PACKAGE 4
GREEN LINE UNDERDROUND
Date-: 12-02-2019
CONSTRUCTION DAILY REPORT – GREEN LINE UNDERGROUND FIRE TELEPHONE SYSTEM
9
DESIGN & BUILT PACKAGE 4
GREEN LINE UNDERDROUND
Date-: 12-02-2019
CONSTRUCTION DAILY REPORT – GREEN LINE UNDERGROUND FIRE TELEPHONE SYSTEM
10
DESIGN & BUILT PACKAGE 4
GREEN LINE UNDERDROUND
Date-: 12-02-2019
CONSTRUCTION DAILY REPORT – GREEN LINE UNDERGROUND FIRE TELEPHONE SYSTEM
11
DESIGN & BUILT PACKAGE 4
GREEN LINE UNDERDROUND
Date-: 12-02-2019
CONSTRUCTION DAILY REPORT – GREEN LINE UNDERGROUND FIRE TELEPHONE SYSTEM
12