ATTACHMENT No. 1
Submittal Title: B08.07 Filling Station & Washing Facility-Mech. HVAC - IFC stage.
1. This drawing submittal approval is conditional and subject to the designer complying to all
comments listed below and submision of all information / documents.
2. The Contractor is fully responsible for the coordination amongst all design’s disciplines. In the
event of mis-coordination due to errors, omissions and other mistakes within the
Designer/Contractor control, the Contractor shall correct those mistakes with all necessary
actions (demolition included) to the satisfaction of the Engineer.
3. Any deviations have to be submitted via the “change notification form” reflecting the value
engineering resulting from changes made from the technical specifications and project tender
documents. Refer to attached Commercial Rider “A”.
Contractor’s Contractual
No. Document Comments
Doc. Ref.
Reference
Contractor has submitted this submittal in compliance to
earlier submittal for Filling Station & Washing Facility which
was submitted vide submittal reference number: MI-AA-A1-
B08.07-M0-WS-004-07-00, received 19-02-2018.
Page 1 of 3 MI-MT-FM034-PAM-00
Security Forces - Medical Centre Project
Riyadh - Jeddah
Contractor shall provide the drawing with lighter X-ref CAD pen
3 X-Ref assignment and darker Mechanical system for better -
identification.
Fuel Oil
4 -
System
Missing
5 RDS (Room Data Sheet) is missing in this submission. -
Documents
Page 2 of 3 MI-MT-FM034-PAM-00
Security Forces - Medical Centre Project
Riyadh - Jeddah
Page 3 of 3 MI-MT-FM034-PAM-00