Security Forces - Medical Centre Project

Riyadh - Jeddah

Prot. 0221/2021 – XP035


Date: 24/02/2021

ATTACHMENT No. 1

Contractor Ref: Transmittal/Submittal: MI-AA-A1-B08.07-M0-WS-005-07-00 Date: 14-02-2021

Attached Documents: As per Attached Drawing Submittal Checklist.

Submittal Title: B08.07 Filling Station & Washing Facility-Mech. HVAC - IFC stage.

Design phase: Issued for Construction

COMMENTS - MEP DEPARTMENT

1. This drawing submittal approval is conditional and subject to the designer complying to all
comments listed below and submision of all information / documents.
2. The Contractor is fully responsible for the coordination amongst all design’s disciplines. In the
event of mis-coordination due to errors, omissions and other mistakes within the
Designer/Contractor control, the Contractor shall correct those mistakes with all necessary
actions (demolition included) to the satisfaction of the Engineer.
3. Any deviations have to be submitted via the “change notification form” reflecting the value
engineering resulting from changes made from the technical specifications and project tender
documents. Refer to attached Commercial Rider “A”.

Contractor’s Contractual
No. Document Comments
Doc. Ref.
Reference
Contractor has submitted this submittal in compliance to
earlier submittal for Filling Station & Washing Facility which
was submitted vide submittal reference number: MI-AA-A1-
B08.07-M0-WS-004-07-00, received 19-02-2018.

In this revised submittal, contractor has been asked to comply


the comments which were issued on 06/03/2018.

Submission Contractor has complied with all comments mentioned as per -


1
at attached compliance document # MI-HK-A1-B08.07-M0-SR-
001-07-00-A in this submittal.

Kindly note that this submission in Compliance to an earlier


submission, hence this submission shall be read with same
number Revision -01.

Design phase shall read as IFC (Re-Submission).

Page 1 of 3 MI-MT-FM034-PAM-00
Security Forces - Medical Centre Project
Riyadh - Jeddah

Contractor shall refer the drawings also for an additional


2 General comments. -

Layout shall be as per the latest approved Architectural.

Contractor shall provide the drawing with lighter X-ref CAD pen
3 X-Ref assignment and darker Mechanical system for better -
identification.

All air outlet location with an approved RCP.

Contractor has submitted Fuel oil system drawing # MI-HK-A1-


B08.07-M0-10-011-07-00.

This is a Mechanical – HVAC package, contractor shall submit


this drawing in Plumbing package.

Contractor has already complied in earlier IFC package,

Fuel Oil
4 -
System

Kindly check and confirm. All relevant schedule like (Air


Compressor, Fuel Oil Tank) shall be provided in Plumbing
discipline.

Missing
5 RDS (Room Data Sheet) is missing in this submission. -
Documents

Contractor shall provide the Legend and Notes details to suite


Legends and the requirement of this building, instead of submitting the
6 -
Notes complete project details.

Page 2 of 3 MI-MT-FM034-PAM-00
Security Forces - Medical Centre Project
Riyadh - Jeddah

Contractor has attached BOD submitted by an earlier designer


Ms Arcadis, whereas compliance has been submitted by
Ms Shaker.
7 BOD Report -
Kindly clarify, the present design responsibilities is under Ms
Shaker.

Approval Code: [B]

Sr. Mech. Engineer Head of MEP Department


Bilal Sarang Andrea Boscolo