You are on page 1of 10

EARTHQUAKE DAMAGES REPAIR FOR SCTEX PROJECT

(SCTEX)

INSPECTION REPORTS

1 INSPECTION REPORT MMR 01


EARTHQUAKE DAMAGES REPAIR FOR SCTEX PROJECT

INSPECTION REPORT
(SCTEX)

(PARTIAL AS OF MARCH 24, 2021)

WE HEREBY CERTIFY AND INSPECTED that Item:

Removal of Existing Asphalt Pavement (35mm Stone Mastic Asphalt- SMA)

with a total quantity of 871.71 m2

For Part I Pavement Cracks Repair 93 Locations

has been accomplished by the Contractor and Conforms

with the standard Specification and Special Provisions of the Contract.

Done this 10th of March 2021.

Submitted by: Checked by and Verified by:

Marco S. Dela Cruz Eloida B. Acosta


GPI- Materials Engineer 1 Head- QA/QC NLEX CORP

2 INSPECTION REPORT MMR 01


EARTHQUAKE DAMAGES REPAIR FOR SCTEX PROJECT

INSPECTION REPORT
(SCTEX)

(PARTIAL AS OF MARCH 24, 2021)

WE HEREBY CERTIFY AND INSPECTED that Item::

Removal of Existing Asphalt Pavement (50mm Asphalt Wearing Course-AWC)

with a total quantity of 871.71 m2

For Part I Pavement Cracks Repair 93 Locations

has been accomplished by the Contractor and Conforms

with the standard Specification and Special Provisions of the Contract.

Done this 10th of March 2021.

Submitted by: Checked by and Verified by:

Marco S. Dela Cruz Eloida B. Acosta


GPI- Materials Engineer 1 Head- QA/QC NLEX CORP

3 INSPECTION REPORT MMR 01


EARTHQUAKE DAMAGES REPAIR FOR SCTEX PROJECT

INSPECTION REPORT
(SCTEX)

(PARTIAL AS OF MARCH 24, 2021)

WE HEREBY CERTIFY AND INSPECTED that Item:

Removal of Existing Asphalt Pavement (50mm Aggregate Base Course - ABC)

with a total quantity of 618.93 m2

For Part I Pavement Cracks Repair 93 Locations

has been accomplished by the Contractor and Conforms

with the standard Specification and Special Provisions of the Contract.

Done this 10th of March 2021.

Submitted by: Checked by and Verified by:

Marco S. Dela Cruz Eloida B. Acosta


GPI- Materials Engineer 1 Head- QA/QC NLEX CORP

4 INSPECTION REPORT MMR 01


EARTHQUAKE DAMAGES REPAIR FOR SCTEX PROJECT

INSPECTION REPORT
(SCTEX)

(PARTIAL AS OF MARCH 24, 2021)

WE HEREBY CERTIFY AND INSPECTED that Item:

Removal of Cement Treated Lahar and Sub-Base Course

with a total quantity of 154.733

For Part I Pavement Cracks Repair 93 Locations

has been accomplished by the Contractor and Conforms

with the standard Specification and Special Provisions of the Contract.

Done this 10th of March 2021.

Submitted by: Checked by and Verified by:

Marco S. Dela Cruz Eloida B. Acosta


GPI- Materials Engineer 1 Head- QA/QC NLEX CORP

5 INSPECTION REPORT MMR 01


EARTHQUAKE DAMAGES REPAIR FOR SCTEX PROJECT

INSPECTION REPORT
(SCTEX)

(PARTIAL AS OF MARCH 24, 2021)

WE HEREBY CERTIFY AND INSPECTED that Item:

Removal of Existing Asphalt Pavement (50mm Asphalt Wearing Course-AWC)

with a total quantity of 743.9 m2

For Part II BRIDGE APPROACH SLAB SETTLEMENT REPAIR- 30 LOCATIONS

has been accomplished by the Contractor and Conforms

with the standard Specification and Special Provisions of the Contract.

Done this 10th of March 2021.

Submitted by: Checked by and Verified by:

Marco S. Dela Cruz Eloida B. Acosta


GPI- Materials Engineer 1 Head- QA/QC NLEX CORP

6 INSPECTION REPORT MMR 01


EARTHQUAKE DAMAGES REPAIR FOR SCTEX PROJECT

INSPECTION REPORT
(SCTEX)

(PARTIAL AS OF MARCH 24, 2021)

WE HEREBY CERTIFY AND INSPECTED that Item:

Removal of Existing Asphalt Pavement (50mm Aggregate Base Course - ABC)

with a total quantity of 876 m2

For Part II BRIDGE APPROACH SLAB SETTLEMENT REPAIR- 30 LOCATIONS

has been accomplished by the Contractor and Conforms

with the standard Specification and Special Provisions of the Contract.

Done this 10th of March 2021.

Submitted by: Checked by and Verified by:

Marco S. Dela Cruz Eloida B. Acosta


GPI- Materials Engineer 1 Head- QA/QC NLEX CORP

7 INSPECTION REPORT MMR 01


EARTHQUAKE DAMAGES REPAIR FOR SCTEX PROJECT

INSPECTION REPORT
(SCTEX)

(PARTIAL AS OF MARCH 24, 2021)

WE HEREBY CERTIFY AND INSPECTED that Item:

Removal of Existing Asphalt Pavement (35 to 50mm Transition / Settlement


Correction)

with a total quantity of 2520.3 m2

For Part II BRIDGE APPROACH SLAB SETTLEMENT REPAIR- 30 LOCATIONS

has been accomplished by the Contractor and Conforms

with the standard Specification and Special Provisions of the Contract.

Done this 10th of March 2021.

Submitted by: Checked by and Verified by:

Marco S. Dela Cruz Eloida B. Acosta


GPI- Materials Engineer 1 Head- QA/QC NLEX CORP

8 INSPECTION REPORT MMR 01


EARTHQUAKE DAMAGES REPAIR FOR SCTEX PROJECT

INSPECTION REPORT
(SCTEX)

(PARTIAL AS OF MARCH 24, 2021)

WE HEREBY CERTIFY AND INSPECTED that Item:

Removal of Aggregate Base Course- ABC

with a total quantity of 90.5 m3

For Part II BRIDGE APPROACH SLAB SETTLEMENT REPAIR- 30 LOCATIONS

has been accomplished by the Contractor and Conforms

with the standard Specification and Special Provisions of the Contract.

Done this 10th of March 2021.

Submitted by: Checked by and Verified by:

Marco S. Dela Cruz Eloida B. Acosta


GPI- Materials Engineer 1 Head- QA/QC NLEX CORP

9 INSPECTION REPORT MMR 01


EARTHQUAKE DAMAGES REPAIR FOR SCTEX PROJECT

INSPECTION REPORT
(SCTEX)

(PARTIAL AS OF MARCH 24, 2021)

WE HEREBY CERTIFY AND INSPECTED that Item:

Drill 100mm dia Hole 6 holes

with a total quantity of 192 holes

For Part II BRIDGE APPROACH SLAB SETTLEMENT REPAIR- 30 LOCATIONS

has been accomplished by the Contractor and Conforms

with the standard Specification and Special Provisions of the Contract.

Done this 10th of March 2021.

Submitted by: Checked by and Verified by:

Marco S. Dela Cruz Eloida B. Acosta


GPI- Materials Engineer 1 Head- QA/QC NLEX CORP