EXPANSION OF TERMINAL BUILDING AND ALLIED FACILITIES AT

ALLAMA IQBAL INTERNATIONAL AIRPORT PROJECT (AIIAP), LAHORE

BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

C. CIVIL WORKS

02-PASSENGER TERMINAL BUILDING

DEMOUNTABLE PARTITIONS
Ref.Spec. No. 6625

Methodology for dismantling/ repouring/ remedial


works as mentioned in General Notes drawing
shall be strictly followed and as approved by the
Engineer.

02-1C Providing, fixing/ erecting and removing


demountable temporary partitions with M.S.
supporting system, both sides painted fiber
cement board, insulated polycarbonate sheet,
lockable metal door etc. comprising propping,
bracing and shoring of existing RCC structures till
completion of works. (The Contractor shall submit
methodology and design of temporary partitions/
supporting system to the Engineer for approval
prior to start the works.) Sqm 4,000

Unit Rate in words …………………………………..


.
DISMANTLING
Ref.Spec. No.0200

02-2C Dismantling/ Cutting/ chiseling of existing


reinforced cement concrete works (as describe/
shown in drawing) at any depth & level, stacking of
useable material shall be handed over to Employer
and disposal of debris/ unused/ demolished/
removed materials, including loading, unloading
and transporting complete in all respect to
designated places and up to any lead or as
directed by the Engineer and specification
(Contractor is fully responsible for the safety and
stability of existing structure during removing/
dismantling works)

a) Remote access ramp Cum 215

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-1 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

b) Boarding Bridge including stairs Cum 205

Unit Rate in words …………………………………..

c) Waffle Slab 600mm thick Sqm 1,600

Unit Rate in words …………………………………..

d) Columns, Beams, Slabs, Purdi, Walls etc. Cum 2,100

Unit Rate in words …………………………………..

e) Trench Cum 200

Unit Rate in words …………………………………..

02-3C Dismantling/ Cutting/ chiseling and removal of


existing plain cement concrete works (as
describe/ shown in drawing) at any depth & level
including loading, unloading and transporting
complete in all respect to designated places and
up to any lead or as directed by the Engineer and
specification (Contractor is fully responsible for the
safety and stability of existing structure during
removing/ dismantling works) Cum 50

Unit Rate in words …………………………………..

02-4C Dismantling/ removal of existing brick masonry


walls of any thickness (as describe/ shown in
drawing) at any depth & level, stacking of useable
material, shall be handed over to Employer and
disposal of debris/ unused/ demolished/ removed
materials, including loading, unloading and
transporting complete in all respect to designated
places and up to any lead or as directed by the
Engineer and specification (Contractor is fully
responsible for the safety and stability of existing
structure during removing/ dismantling works)
Cum 585

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-2 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

02-5C Dismantling/ removal of existing floor and


skirting of any kinds with base/ sub-floor (as
describe/ shown in drawing) at any depth & level,
stacking of useable material shall be handed over
to Employer and disposal of debris/ unused/
demolished/ removed materials, including loading,
unloading and transporting complete in all respect
to designated places and up to any lead or as
directed by the Engineer and specification
(Contractor is fully responsible for the safety and
stability of existing structure during removing/
dismantling works) Sqm 4,390

Unit Rate in words …………………………………..

02-6C Removal and reinstallation of existing marble/


granite cladding (as describe/ shown on drawing)
without damaging panels, tiles, trims, moulding &
motifs at any level, safely removing, handling,
safe storage/ stacking, shifting including repairing
if required, reinstallation/ refixing and refixing
accessories etc; and disposal of debris/ unused/
demolished/ removed materials, including loading,
unloading and transporting complete in all respect
to designated places and up to any lead or as
directed by the Engineer and specification
(Contractor is fully responsible for the safety and
stability of existing structure during removing/
dismantling works) Sqm 1,650

Unit Rate in words …………………………………..

02-7C Removal of existing brick cladding from walls (as


describe/ shown in drawing) at any level, safely
removing, handling, safe storage/ stacking,
shifting including repairing if required,
reinstallation/ refixing and refixing accessories
etc; and disposal of debris/ unused/ demolished/
removed materials, including loading, unloading
and transporting complete in all respect to
designated places and up to any lead or as
directed by the Engineer and specification
(Contractor is fully responsible for the safety and
stability of existing structure during removing/
dismantling works) Sqm 9,655

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-3 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

02-8C Dismantling/ removal of existing precast fairfaced


concrete sill, coping, moulding and concrete
blocks (as describe/ shown in drawing) at any
level, safely removing, handling, safe storage/
stacking, shifting including repairing if required,
reinstallation/ refixing and refixing accessories
etc; and disposal of debris/ unused/ demolished/
removed materials, including loading, unloading
and transporting complete in all respect to
designated places and up to any lead or as
directed by the Engineer and specification
(Contractor is fully responsible for the safety and
stability of existing structure during removing/
dismantling works)

a) Sill Rm 75

Unit Rate in words …………………………………..

b) Coping Rm 165

Unit Rate in words …………………………………..

c) Block Rm 165

Unit Rate in words …………………………………..

d) Moulding Rm 165

Unit Rate in words …………………………………..

02-9C Removal and reinstallation of existing Fixtures


such as door/ window/ ventilator/ screen/
curtain wall etc with supporting system (as
describe/ shown in drawing) at any level, safely
removing, handling, safe storage/ stacking,
shifting including repairing if required,
reinstallation/ refixing and refixing accessories
etc; and disposal of debris/ unused/ demolished/
removed materials, including loading, unloading
and transporting complete in all respect to
designated places and up to any lead or as
directed by the Engineer and specification
(Contractor is fully responsible for the safety and
stability of existing structure during removing/
dismantling works) Sqm 480

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-4 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

02-10C Removal and reinstalling/ refixing of existing False


Ceiling Type C03 and fixtures (as describe/
shown in drawing) at any level, safely removing,
handling, safe storage/ stacking, shifting including
repairing if required, fixing and fixing accessories
etc complete in all respect as shown on the
drawings. (Contractor is fully responsible for the
safety and stability of existing structure during
removing/ dismantling works) Sqm 6,705

Unit Rate in words …………………………………..

02-11C Removal and reinstallation of existing glazed


partition and other existing operations
Fixtures/ furniture such as check-in/ immigration/
other counters, scanners, signage & etc (as
describe/ shown in drawing) at any level, safely
removing, handling, safe storage/ stacking,
shifting including repairing if required, to remain till
substantial completion of project area/ as advised
by the Engineer (Contractor is fully responsible for
the safety during removing works) Job 1

Unit Rate in words …………………………………..

EARTH WORKS
Ref. Sec.No. 1100

02-12C Excavation in all kinds of sub-surface material up


to following depth including dewatering and
disposal of surplus/ rejected all the required
excavated material to designated places and up to
any lead, complete in all respect as shown on the
drawing and specification and as directed by the
Engineer.

a) From 0 to 2 meter Cum 34,120

Unit Rate in words …………………………………..

b) From 2 to 4 meter Cum 19,005

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-5 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

02-13C Fill and backfill with selected material including


watering, compaction & etc, complete in all respect
as shown on the drawing and specification.

a) Obtained from required excavation. Cum 17,714

Unit Rate in words …………………………………..

b) Obtained from outside sources. Cum 13,110

Unit Rate in words …………………………………..

02-14C Selected fill material including watering,


compaction & etc, complete in all respect as
shown on the drawing and specification. Cum 16,926

Unit Rate in words …………………………………..

STONE SOLING
Ref. Sec.No. 1330

02-15C Crushed stone soling of any thickness including


blinding material and compaction etc. complete in
all respect as directed by the Engineer and as
shown on the drawing and specification. Cum 25

Unit Rate in words …………………………………..

TERMITE CONTROL TREATMENT


Ref. Sec.No. 1600

02-16C Termite Control Treatment complete in all respect


as shown on the drawing and specification. Sqm 17,095

Unit Rate in words …………………………………..

REINFORCEMENT
Ref. Sec.No. 2200

02-17C Hot rolled deformed billet steel bars conforming to


ASTM A615, Grade 60 with specified yield
strength not less than 414 MPa (60,000 Psi) etc
complete in all respect as shown on the drawing
and specification. tonne 5,900

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-6 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

02-18C Dowels anchorage with epoxy chemical adhesive


Fisher Adhesive FIS-EM Plus or HILTI HIT-RE 500
or approved equivalent including drilling of holes in
existing structures, fixing and fixing acessories
etc., complete in all respects as per
manufacturer's recommendations and as shown
on the drawings and specifications.

i) #8 dia No 640

Unit Rate in words …………………………………..

ii) #6 dia No 740

Unit Rate in words …………………………………..

iii) #5 dia No 70

Unit Rate in words …………………………………..

iv) #4 dia No 4,600

Unit Rate in words …………………………………..

PLAIN AND REINFORCED CONCRETE


Ref. Sec.No. 2100, 2300

02-19C Class 'E' plain concrete using specified cement


complete in all respect as shown on the drawings
and specifications. Cum 2,917

Unit Rate in words …………………………………..

02-20C Class 'D' plain concrete in situ using specified


cement complete in all respect as shown on the
drawings and specifications. Cum 1,743

Unit Rate in words …………………………………..

02-21C Class 'C' concrete using specified cement in plinth


protection including bitumen seal with rubberized
material etc; complete in all respect as shown on
the drawings and specifications. Cum 125

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-7 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

02-22C Class 'B' reinforced concrete using specified


cement in following sub-structures including
providing and applying approved cementitious
bonding agent between existing and new concrete
surfaces etc complete in all respect as shown on
the drawing & specification.

a) Raft/ Footing/ Foundations Cum 12,463

Unit Rate in words …………………………………..

b) Wall Cum 113

Unit Rate in words …………………………………..

c) Plinth beams/ walls Cum 1,193

Unit Rate in words …………………………………..

e) Grade Slab
including expansion joint (Polysulphide sealant,
Bitumen impregnated soft board, Backer Rod)
etc.complete in all respect as shown on the
drawing and specification. Cum 3,265

Unit Rate in words …………………………………..

e) Trenches Cum 51

Unit Rate in words …………………………………..

02-23C Class 'B' reinforced concrete using specified


cement in following superstructures including
providing and applying approved cementitious
bonding agent between existing and new concrete
surfaces etc complete in all respect as shown on
the drawing & specification.

a) Beams & lintels Cum 3,033

Unit Rate in words …………………………………..

b) Slab & projections Cum 2,575

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-8 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

c) Waffle Slab Sqm 28,347

Unit Rate in words …………………………………..

d) Ribbed slab including ribs Cum 365

Unit Rate in words …………………………………..

e) Curve slab including ribs Cum 125

Unit Rate in words …………………………………..

f) Staircase Cum 62

Unit Rate in words …………………………………..

g) Walls Cum 55

Unit Rate in words …………………………………..

h) Parapet/Purdi Cum 708

Unit Rate in words …………………………………..

i) Decorative Arches as per design Cum 55

Unit Rate in words …………………………………..

02-24C Class 'A' reinforced concrete using specified


cement in sub-structure columns etc complete in
all respect as shown on the drawing &
specification. Cum 458

Unit Rate in words …………………………………..

02-25C Class 'A' reinforced concrete using specified


cement in superstructure columns etc complete in
all respect as shown on the drawing &
specification. Cum 2,622

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-9 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

02-26C RETROFITTING
Jacketing around existing column in Class 'A'
concrete including application of SBR (MASTER
EMACO SBR2 or approved equivalant) etc.
complete in all respects as per manufacturer's
recommendations and as shown on the drawing &
specification. Cum 80

Unit Rate in words …………………………………..

02-27C Precast fairfaced Class 'B' reinforced concrete


using ordinary Portland cement in moulding, block,
window sills, water spouts, planks and coping (as
describe/ shown on the drawing) etc. as per
design laid in specified cement sand mortar
including fixing etc complete in all respect as
shown on the drawing & specification. Cum 175

Unit Rate in words …………………………………..

02-28C Class 'B' reinforced concrete slab using specified


cement including providing and applying approved
cementitious bonding agent between existing and
new concrete surfaces etc complete in all respect
as shown on the drawing & specification.

a) Slab Repour/ Recast Sqm 550

Unit Rate in words …………………………………..

b) Waffle 600mm thick slab Repour/ Recast Sqm 750

Unit Rate in words …………………………………..

SADDLE TYPE

02-29C Precast fair faced Class 'B' concrete using


specified cement in following structures, laid/ fixed
in specified cement sand mortar including fixing
and fixing accessories etc; complete in all respect
as shown on the drawing & specification.

a) Type-02: Saddle/ Threshold


with 9x50mm aluminum strip Cum 5

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-10 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

b) Type-07: Saddle/ Threshold


with 30x30 galvanized steel angle, metal flashing,
steel dowels, weather stripping & water proofing
membrane. Cum 2

Unit Rate in words …………………………………..

STRUCTURAL STEEL WORKS


Ref. Sec.No. 3000

02-30C Providing, fabrication and installation of structural


steel comprising MS framing, HSS, pipes, angles,
plates, channel, nuts, bolts, metal flashing etc.
including embedding, welding, painting, fixing and
fixing accessories etc.; complete in all respects as
shown on the drawing & specification.
tonne 15

Unit Rate in words …………………………………..

MISCELLANEOUS STEEL WORKS


Ref. Sec.No. 3100

02-31C Providing, fabrication and installation of MS


Monkey ladder/ MS stair with cage/ without cage,
platform, chemical anchor bolt including
embedding, welding, painting, fixing and fixing
accessories etc; complete in all respect as shown
on the drawing & specification. Kg 1000

Unit Rate in words …………………………………..

02-32C Providing, fabrication and installation of PU


painted MS ramp railing (as describe & shown on
the drawing) including embedding and embedding
parts etc; complete in all respect as shown on the
drawing and specification. Rm 430

Unit Rate in words …………………………………..

02-33C Providing, fabrication and installation of galvanized


MS grating cover including fixing and fixing
accessories etc; complete in all respects as shown
on the drawing and specification. Sqm 4

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-11 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

02-34C Providing, fabrication and installation of 6mm thick


MS chequred plate, including fixing and fixing
accessories etc; complete in all respects as shown
on the drawing and specifications. Sqm 180

Unit Rate in words …………………………………………………………………………

02-35C Providing, fabrication and installation of MS


powder coated Trolley Guard / Bumper Rail
including powder coated MS moulded face sheet
plate, MS plate, expansion bolts, fixing
accessories etc; complete in all respects as shown
on the drawing and specifications.

i) Floor mounted Rm. 1,980

Unit Rate in words …………………………………..

ii) Wall mounted Rm. 1,320

Unit Rate in words …………………………………..

02-36C Providing, fabrication and installation of galvanized


angle iron corner guard at column's edge including
expansion bolts, strips of yellow & black paint,
fixing accessories etc; complete in all respects as
shown on the drawing and specifications. Rm. 1,290

Unit Rate in words …………………………………..

02-37C Cover Sheet: UV resistant PVC insulated cover in


MS framing including fixing and fixing accessories
etc, complete in all respect as shown on the
drawing, as per specifications and as per
manufacturer's recommendations. Sqm 5

Unit Rate in words …………………………………..

02-38C Roof Hatch: Steel cover & liner as per MFTR


Standard with insulation, rubber gasket, spring
latch with handles, automatic hold open arm, pad
lock, lifting mechanism, steel curbs including fixing
and fixing accessories etc, complete in all respect
as shown on the drawing, as per specifications
and as per manufacturer's recommendations. No 1

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-12 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

02-39C Shaft Covering: PVC roof covering including


fixing and fixing accessories etc, complete in all
respect as shown on the drawing, as per
specifications and as directed by the Engineer.
(excluding the cost of structural steel) Sqm 10

Unit Rate in words …………………………………..

02-40C Window Type: Fully sand trap louvered with 16


guage MS blades with 2mm thick MS frame in
epoxy paint finish with compatible hardware set
(as per schedule) including fixing and fixing
accessories etc of the following design types;
complete in all respect as shown on the drawing
and specification.

a) Type-xLS1 9

Unit Rate in words …………………………………..

b) Type-xLS2 78

Unit Rate in words …………………………………..

c) Type-xLS3
23
Unit Rate in words …………………………………..

d) Type-xLS4 12

Unit Rate in words …………………………………..

02-41C Staircase Type 5 (Stair N8, N9, N10)


Providing, fabrication and installation of floor
mounted PU painted MS railing with galvanized
steel handrail, PVC coated cap, MS bracket
including embedding, embedding parts, fixing and
fixing accessories etc; complete in all respect as
shown on the drawing and specification. Rm 75

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-13 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

02-42C Staircase Type 5 (Stair N8, N9, N10)


Providing, fabrication and installation of wall
mounted PU painted MS pipe rail with MS wall
bracket including embedding, embedding parts,
fixing and fixing accessories etc; complete in all
respect as shown on the drawing and Rm 75

Unit Rate in words …………………………………..

02-43C Staircase Type 6 (Stair N7)


Providing, fabrication and installation of floor
mounted epoxy painted MS railing with MS pipe
(upper rail, baluster & mid rail) including
embedding, embedding parts, fixing and fixing
accessories etc; complete in all respect as shown
on the drawing and specification. Rm 14

Unit Rate in words …………………………………..

02-44C Staircase Type 6 (Stair N7)


Providing, fabrication and installation of wall
mounted epoxy painted MS pipe rail with MS wall
bracket including embedding, embedding parts,
fixing and fixing accessories etc; complete in all
respect as shown on the drawing and Rm 14

Unit Rate in words …………………………………..

02-45C Door Type: 44mm thick Hollow Metal door 1.5mm


(16gauge) thick seamless MS facing sheets,
epoxy painted, filled with mineral fiber wool and
compatible hardware set (as per schedule)
including fixing and fixing accessories etc. of the
following design types; complete in all respect as
shown on the drawing & specification.

a) Type-SD1
fire rated Sqm 25

Unit Rate in words …………………………………..

b) Type-SD2
including vision panel in 12mm thick (6+6)
laminated glass & aluminum door grill (powder
coated), fire rated Sqm 30

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-14 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

c) Type-SD3
including 12mm thick (6+6) laminated glass (Fan
light & kick plate, fire rated Sqm 3

Unit Rate in words …………………………………..

d) Type-SD4
including aluminum door grill (powder coated)
fire rated Sqm 8

Unit Rate in words …………………………………..

e) Type-SD5
including aluminum door grill (powder coated)
fire rated Sqm 135

Unit Rate in words …………………………………..

f) Type-SD6
fire rated Sqm 20

Unit Rate in words …………………………………..

g) Type-SD9
fire rated Sqm 15

Unit Rate in words …………………………………..

h) Type-SD10
fire rated Sqm 18

Unit Rate in words …………………………………..

i) Type-SD11
including vision panel in 12mm thick (6+6)
laminated glass, fire rated Sqm 5

Unit Rate in words …………………………………..

j) Type-SD12
fire rated Sqm 5

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-15 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

02-46C Door Type: Fully sand trap MS louvered door with


1.5mm (16 gauge) MS blades louvers in 2mm
thick MS frame in epoxy paint finish with
compatible hardware set (as per schedule)
including fixing and fixing accessories etc. of the
following design types; complete in all respect as
shown on the drawing & specification.

a) Type-SD7
fire rated Sqm 10

Unit Rate in words …………………………………..

b) Type-SD8
fire rated Sqm 55

Unit Rate in words …………………………………..

02-47C Door Type SD13: Motorized operated weather


seal insulated galvanized steel, epoxy painted fire
rated rolling shutter (provide chain hoist for
emergency operation/manual option) with
compatible hardware set (as per schedule)
including fixing and fixing accessories etc. of the
following design types; complete in all respect as
shown on the drawing & specification. Sqm 5

Unit Rate in words …………………………………..

02-48C Providing, fabrication and installation of metal


threshold of specified size including grout, base,
fixing and fixing accessories etc. of the following
types; complete in all respect as shown on the
drawing & specification.

a) Type-01: Metal Saddle/ Threshold


with drip edge & weather stripping Sqm 15

Unit Rate in words …………………………………..

b) Type-04: Metal Saddle/ Threshold Sqm 8

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-16 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

02-49C Providing, fabrication and installation of continuous


galvanized steel angle threshold of specified size
including base, fixing and fixing accessories etc. of
the following types; complete in all respect as
shown on the drawing & specification.

a) Type-08: Saddle/ Threshold


continuous galvanized steel angle Sqm 5

Unit Rate in words …………………………………..

b) Type-09: Saddle/ Threshold


continuous galvanized steel angle Sqm 1

Unit Rate in words …………………………………..

STAINLESS STEEL MATERIAL & FINISHES


Ref. Sec.No. 3010

02-50C Stainless steel trolley guard as per design & detail


including fixing and fixing accessories etc
complete in all respect as shown on the drawing
and specification. Rm 1,570

Unit Rate in words …………………………………..

02-51C Wall type W12: Providing, fabrication and


installation of stainless steel cladding over
specified surfaces including embedding,
embedding parts, fixing and fixing accessories etc;
complete in all respect as shown on the drawing
and specification. Sqm 350

Unit Rate in words …………………………………..

02-52C Skirting type SK07: 200mm high stainless steel


skirting in approved size including all fixing
accessories etc.; complete in all respects as
shown on the drawing & specification. Sqm 6

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-17 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

02-53C Staircase Type 4 (Stair N5, N6)


Providing, fabrication and installation of floor
mounted chrome finished stainless steel pipe
railing with top rail, mid rail, balusters including
embedding, embedding parts, fixing and fixing
accessories etc; complete in all respect as shown
on the drawing and specification. Rm 25

Unit Rate in words …………………………………..

02-54C Staircase Type 2 (Stair N1, N4)


Staircase Type 4 (Stair N5, N6)
Providing, fabrication and installation of chrome
finished stainless steel pipe rail with stainless steel
wall bracket including embedding, embedding
parts, fixing and fixing accessories etc; complete in
all respect as shown on the drawing and
specification. Rm 85

Unit Rate in words …………………………………..

02-55C Providing, fabrication and installation of stainless


steel barrier of following lengths with 60mm dia
stainless steel tube & cap including embedding,
embedding parts, fixing and fixing accessories etc;
complete in all respect as shown on the drawing
and specification:

a) 715mm No. 25

Unit Rate in words …………………………………..

b) 1000mm No. 25

Unit Rate in words …………………………………..

c) 1050mm No. 25

Unit Rate in words …………………………………..

d) 1150mm No. 25

Unit Rate in words …………………………………..

e) 1350mm No. 25

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-18 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

f) 1750mm No. 80

Unit Rate in words …………………………………..

BRICK MASONRY WORKS


Ref.Spec. No. 4200

02-56C 113mm thick reinforced brick masonry wall set in


cement sand mortar including damp proof course,
stiffener columns, beams, steel reinforcement,
weep holes, S-shape anchors, fillet, pointing, steel
plate, SS anchor, expansion bolt, fiberglass fire
stopping filler & sealant wherever required etc.
complete in all respects as shown on the drawing
& specification. Cum 725

Unit Rate in words …………………………………..

02-57C 228mm thick reinforced brick masonry wall set in


cement sand mortar including damp proof course,
stiffener columns, beams, steel reinforcement,
water barrier, weep holes, S-shape anchors, fillet,
pointing, steel plate, SS anchor, expansion bolt,
fiberglass fire stopping filler & sealant wherever
required etc. complete in all respects as shown on
the drawing & specification. Cum 2,585

Unit Rate in words …………………………………..

02-58C Brick Cladding/ Brick facing (to be match with


existing brick facing work) set in cement sand
mortar including steel dowels, 6mm dia stainless
steel wall ties, weep holes, vapour barrier coating,
breathing holes, fixing accessories etc. complete
in all respects as shown on the drawing &
specification. Sqm 11380

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-19 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

CARPENTARY & JOINERY


Ref.Sec.No. 4600,6700

02-59C Door Type: 35mm thick wooden single leaf, single


swing, hollow core, both sides plastic laminated
with teakwood lipping finished, all around wooden
flush door in lacquered finish with hardware set
(as per schedule), including fixing and fixing
accessories etc; of the following design types;
complete in all respect as shown on the drawing
and specification.

a) Type-D2
fire rated Sqm 65

Unit Rate in words …………………………………..

b) Type-D16
including aluminum door grill (powder coated)
& kick plate, fire rated Sqm 5

Unit Rate in words …………………………………..

02-60C Door Type: 45mm thick single leaf, single swing,


solid core door filled with rough wood, both sides
plastic laminated with teakwood lipping finished, all
around wooden flush door in lacquered finish with
hardware set (as per schedule), including fixing
and fixing accessories etc; complete in all respect
as shown on the drawing and specification.

a) Type-D3
including aluminum door grill (powder coated)
& kick plate, fire rated Sqm 60

Unit Rate in words …………………………………..

b) Type-D4
including aluminum door grill (powder coated)
& kick plate, fire rated Sqm 15

Unit Rate in words …………………………………..

c) Type-D5
including vision panel (where required)
& kick plate, fire rated Sqm 30

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-20 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

d) Type-D6
including aluminum door grill (powder coated)
& kick plate, fire rated Sqm 100

Unit Rate in words …………………………………..

e) Type-D7
including 12mm thick (6+6) laminated glass
Fan light, aluminum door grill (powder coated)
& kick plate, fire rated Sqm 52

Unit Rate in words …………………………………..

f) Type-D9
including vision panel 12mm thick (6+6) laminated
glass, aluminum door grill (powder coated) & kick
plate, fire rated Sqm 53

Unit Rate in words …………………………………..

g) Type-D10
including vision panel 12mm thick (6+6) laminated
glass, aluminum door grill (powder coated) & kick
plate, fire rated Sqm 42

Unit Rate in words …………………………………..

h) Type-D11
including 12mm thick (6+6) laminated glass
Fan light, fire rated Sqm 3

Unit Rate in words …………………………………..

i) Type-D12
including 12mm thick (6+6) laminated glass
Fan light, aluminum door grill (powder coated)
& kick plate, fire rated Sqm 45

Unit Rate in words …………………………………..

j) Type-D13
including 12mm thick (6+6) laminated glass
Fan light, aluminum door grill (powder coated)
& kick plate, fire rated Sqm 3

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-21 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

k) Type-D15
including 12mm thick (6+6) laminated glass
Fan light, fire rated Sqm 10

Unit Rate in words …………………………………..

02-61C Door Type: 45mm thick single leaf, single swing,


mineral core door both side plastic laminated with
teakwood lipping finished, all around wooden flush
door in lacquered finish with hardware set (as per
schedule), including fixing and fixing accessories
etc; of the following design types; complete in all
respect as shown on the drawing and
specification.

a) Type-D8
including 12mm thick (6+6) laminated glass
Fan light, aluminum door grill (powder coated)
& kick plate, fire rated Sqm 90

Unit Rate in words …………………………………..

b) Type-D14
including aluminum door grill (powder coated)
& kick plate, fire rated Sqm 5

Unit Rate in words …………………………………..

02-62C Door Type D17: 45mm thick single leaf, single


swing, solid core door (fire rated) filled with rough
wood, both side plastic laminated with teakwood
lipping all around, wooden panel door including
wooden louver panel in lacquered finish, kick plate
with hardware set (as per schedule), including
fixing and fixing accessories etc; of the following
design types; complete in all respect as shown on
the drawing and specification. Sqm 40

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-22 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

02-63C Wooden Cabinets (Floor Mounted) in Kitchen/


Pantry: Providing and fixing kitchen wooden
cabinets of approved design comprising wooden
framing and laminated sheet shutter and provision
of light fixture (where required) with compatible
hardware set (as per schedule) including 18mm
thick marble top with bull nose edge, concrete
slabs, plaster, deodar wood lipping, terrazzo floor
finish and specified finishes on wooden surfaces/
panels and fittings/ all accessories etc; complete
in all respect as shown on the drawing and
specification and as directed by the Engineer.
Rm 70

Unit Rate in words …………………………………..

02-64C Wooden Cabinets (Wall Mounted) in Kitchen/


Pantry: Providing and fixing kitchen wooden
cabinets of approved design comprising wooden
framing and laminated sheet and provision of light
fixture (where required) with compatible hardware
set (as per schedule) including deodar wood
frame, deodar wood lipping and specified finishes
on wooden surfaces/ panels and fittings/ all
accessories etc; complete in all respect as shown
on the drawing and specification and as directed
by the Engineer. Rm 70

Unit Rate in words …………………………………..

02-65C Wooden pelmet of first class teak wood as per


design in white oil paint finish etc. complete in all
respects, as approved by the Engineer and as
shown on the drawing and specification. Rm 85

Unit Rate in words …………………………………..

02-66C Providing, fabrication and installation of floor


mounted hardwood handrail with teakwood top
hand rail in lacquer finish, hard wood caping,
middle panel are in 15mm thick tempered glass,
wooden balustrades, steel channel painted black
(matt finish), rubber packing including embedding,
embedding parts, fixing and fixing accessories etc;
complete in all respect as shown on the drawing
and specification. Rm 250

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-23 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

02-67C Wall type W08: 75mm thick Partition Wall for


offices comprising of wooden framing, cladding
with 12mm thick high density fiber board, both
sides plastic laminated with machine press and
teak wood lipping all around, 150mm high skirting
& 75x75mm cladding corner studs of teak wood as
per detail complete with doors and hardwares etc;
complete in all respect as shown on the drawing &
specification. Sqm 750

Unit Rate in words …………………………………..

02-68C Wall Type W11 & Door Type D1: Cubical Wall &
Door in 12mm thick CDF-Compact density fiber
board with (density 1000Kg/m3) both sides
melamine laminated coating, scratch resistance,
splash water resistance and flame retardancy (fire
resistant) for cubical complete with compatible
hardware set of (SS 304 grade) etc; complete in all
respect as shown on the drawing & specification
and as directed by the Engineer. Sqm 1,230

Unit Rate in words …………………………………..

02-69C Wall type W15: Wooden cladding of 20mm thick


MDF board plastic laminated sheet machine
pressed with teak wood veneer / lipping all around
in lacquered finish etc; complete in all respect as
shown on the drawing & specification. Sqm 385

Unit Rate in words …………………………………..

02-70C Providing and fixing of wooden Bumper Rail with


teakwood in lacquered finish as per design
including fixing accessories etc; complete in all
respects as shown on the drawing and
specifications. Rm 110

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-24 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

02-71C Staircase Type 1 (Stair N2)


Staircase Type 2 (Stair N4)
Staircase Type 3 (Stair N3)
Providing, fabrication and installation of floor
mounted hardwood handrail with teakwood top
hand rail in lacquer finish, middle panel are in
15mm thick tempered glass, stainless steel tube
balusters, aluminum channel, rubber packing
including embedding, embedding parts, fixing and
fixing accessories etc; complete in all respect as
shown on the drawing and specification. Rm 136

Unit Rate in words …………………………………..

02-72C Staircase Type 1 (Stair N2)


Providing, fabrication and installation of floor
mounted hardwood handrail with teakwood top
hand rail in lacquer finish, middle panel are in
teakwood panels (lacquered polish), stainless
steel bar balusters & cap, plywood backing
including embedding, embedding parts, fixing and
fixing accessories etc; complete in all respect as
shown on the drawing and specification. Rm 25

Unit Rate in words …………………………………..

02-73C Staircase Type 1 (Stair N2)


Providing, fabrication and installation of wall
mounted hardwood handrail with teakwood hand
rail in lacquer finish, stainless steel wall bracket,
including embedding, embedding parts, fixing and
fixing accessories etc; complete in all respect as
shown on the drawing and specification. Rm 20

Unit Rate in words …………………………………..

02-74C Wooden decorative gola in teakwood with


lacquered finish in appropriate size & detail as per
design etc; complete in all respect as shown on
the drawing and specification. Rm 100

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-25 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

ALUMINIUM WORKS
Ref. Sec.No. 6220, 6250

02-75C Door Type: 12mm thick (6+6mm) laminated


tinted/ clear glass, sliding/ double pivoted door on
powder coated heavy duty aluminum frame with
compatible hardware set (as per schedule)
including fixing and fixing accessories etc. of the
following design types; complete in all respect as
shown on the drawing and specification:

a) Type-GD1
lockable from inside Sqm 65

Unit Rate in words …………………………………..

b) Type-GD2
lockable from inside
including 200mm wide push plate inside, door
handle outside & door closer Sqm 5

Unit Rate in words …………………………………..

c) Type-GD3
lockable from inside
including 200mm wide push plate inside, door
handle outside & door closer Sqm 10

Unit Rate in words …………………………………..

d) Type-GD4
lockable from inside
including 200mm wide push plate inside, door
handle outside & door closer Sqm 53

Unit Rate in words …………………………………..

e) Type-GD5
lockable from inside
including 200mm wide push plate inside, door
handle outside & door closer Sqm 20

Unit Rate in words …………………………………..

f) Type-GD7
lockable from inside
including 200mm wide push plate inside, door
handle outside & door closer Sqm 14

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-26 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

g) Type-GD8
lockable from inside
including 200mm wide push plate inside, door
handle outside & door closer Sqm 85

Unit Rate in words …………………………………..

h) Type-GD9
lockable from inside
including 200mm wide push plate inside, door
handle outside & door closer Sqm 82

Unit Rate in words …………………………………..

i) Type-GD10
lockable from inside
including 200mm wide push plate inside, door
handle outside & door closer Sqm 3

Unit Rate in words …………………………………..

j) Type-GD11
lockable from inside
including 200mm wide push plate inside, door
handle outside & door closer Sqm 22

Unit Rate in words …………………………………..

k) Type-GD12
lockable from inside
including 200mm wide push plate inside, door
handle outside & door closer Sqm 19

Unit Rate in words …………………………………..

02-76C Door Type: 30mm double glazed insulated curtain


wall door in 12mm thick (6+6mm) inner clear
laminated glass + 12mm air gap + 6mm anti sun
glass (tinted) pivoted door on powder coated
heavy duty aluminum frame with compatible
hardware set (as per schedule) including fixing
and fixing accessories etc. of the following design
types; complete in all respect as shown on the
drawing and specification:

a) Type-GD6
including 200mm wide push plate inside, door
handle outside & door closer Sqm 13

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-27 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

b) Type-GD13
including 200mm wide push plate inside, door
handle outside & door closer Sqm 5

Unit Rate in words …………………………………..

02-77C Door Type: Fully louver door, double leaf, single


swing on powder coated heavy duty aluminum
frame, lockable from outside with flush bolt, door
handle out side & compatible hardware set (as per
schedule) including fixing and fixing accessories
etc. of the following design types; complete in all
respect as shown on the drawing and
specification:

a) Type-ALD1
fire rated Sqm 6

Unit Rate in words …………………………………..

b) Type-ALD2
fire rated Sqm 8

Unit Rate in words …………………………………..

c) Type-ALD3
fire rated Sqm 9

Unit Rate in words …………………………………..

02-78C Window Type: 12mm thick (6+6mm) laminated


tinted/ clear glass on powder coated heavy duty
aluminum frame set in epoxy painted MS support
structure with compatible hardware set (as per
schedule) including fixing and fixing accessories
etc. of the following design types; complete in all
respect as shown on the drawing and
specification:

a) Type-xALS1
including teakwood lattice screen in polish finish Sqm 81

Unit Rate in words …………………………………..

b) Type-xALS2 Sqm 44

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-28 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

c) Type-xALS3 Sqm 14

Unit Rate in words …………………………………..

d) Type-xALS4
including teakwood lattice screen in polish finish Sqm 175

Unit Rate in words …………………………………..

e) Type-xALS5 Sqm 22

Unit Rate in words …………………………………..

f) Type-xALS6
including teakwood lattice screen in polish finish Sqm 22

Unit Rate in words …………………………………..

g) Type-xALS7
including teakwood lattice screen in polish finish Sqm 100

Unit Rate in words …………………………………..

h) Type-xALS8 Sqm 88

Unit Rate in words …………………………………..

i) Type-xALS9 Sqm 20

Unit Rate in words …………………………………..

j) Typex-ALS10 Sqm 86

Unit Rate in words …………………………………..

k) Type-xALS11 Sqm 15

Unit Rate in words …………………………………..

l) Type-xALS12
including teakwood lattice screen in polish finish Sqm 87

Unit Rate in words …………………………………..

m) Type-xALS13
including teakwood lattice screen in polish finish Sqm 66

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-29 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

n) Type-xALS14 Sqm 116

Unit Rate in words …………………………………..

o) Type-xALS15 Sqm 83

Unit Rate in words …………………………………..

p) Type-xALS16 Sqm 76

Unit Rate in words …………………………………..

q) Type-xALS17 Sqm 187

Unit Rate in words …………………………………..

r) Type-xALS18
including teakwood lattice screen in polish finish Sqm 26

Unit Rate in words …………………………………..

s) Type-xALS19
including teakwood lattice screen in polish finish Sqm 50

Unit Rate in words …………………………………..

t) Type-xALS20
including teakwood lattice screen in polish finish Sqm 12

Unit Rate in words …………………………………..

u) Type-xALS21
including teakwood lattice screen in polish finish Sqm 91

Unit Rate in words …………………………………..

v) Type-xALS22
including teakwood lattice screen in polish finish Sqm 17

Unit Rate in words …………………………………..

w) Type-xALS23 Sqm 33

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-30 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

x) Type-xALS24 Sqm 16

Unit Rate in words …………………………………..

y) Type-xALS25
including teakwood lattice screen in polish finish Sqm 55

Unit Rate in words …………………………………..

z) Type-xALS26 Sqm 40

Unit Rate in words …………………………………..

a1) Type-xALS27 Sqm 8

Unit Rate in words …………………………………..

b1) Type-xALS28 Sqm 53

Unit Rate in words …………………………………..

c1) Type-xALS29 Sqm 30

Unit Rate in words …………………………………..

d1) Type-xALS30 Sqm 7

Unit Rate in words …………………………………..

e1) Type-xALS31
including teakwood lattice screen in polish finish Sqm 26

Unit Rate in words …………………………………..

f1) Type-xALS32
including teakwood lattice screen in polish finish Sqm 38

Unit Rate in words …………………………………..

g1) Type-xALS33
including teakwood lattice screen in polish finish Sqm 50

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-31 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

h1) Type-xALS34 Sqm 10

Unit Rate in words …………………………………..

i1) Type-xALS35
including teakwood lattice screen in polish finish Sqm 48

Unit Rate in words …………………………………..

j1) Type-xALS36
including PVC coated/ aluminum rolling shutter
screen as per manufacturer's recommendation &
counter glass optionally cut/slice as per
commercial requirement Sqm 200

Unit Rate in words …………………………………..

k1) Type-xALS37
including PVC coated/ aluminum rolling shutter
screen as per manufacturer's recommendation &
counter glass optionally cut/slice as per
commercial requirement Sqm 6

Unit Rate in words …………………………………..

l1) Type-xALS38
including teakwood lattice screen in polish finish Sqm 170

Unit Rate in words …………………………………..

m1) Type-xALS39 Sqm 9

Unit Rate in words …………………………………..

n1) Type-xALS40
including teakwood lattice screen in polish finish Sqm 98

Unit Rate in words …………………………………..

o1) Type-xALS41
including teakwood lattice screen in polish finish Sqm 48

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-32 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

p1) Type-xALS42
including PVC coated/ aluminum rolling shutter
screen as per manufacturer's recommendation Sqm 20

Unit Rate in words …………………………………..

q1) Type-xALS43
including PVC coated/ aluminum rolling shutter
screen as per manufacturer's recommendation Sqm 22

Unit Rate in words …………………………………..

r1) Type-xALS44
including teakwood lattice screen in polish finish Sqm 28

Unit Rate in words …………………………………..

s1) Type-xALS45 Sqm 73

Unit Rate in words …………………………………..

t1) Type-xALS46
including teakwood lattice screen in polish finish Sqm 64

Unit Rate in words …………………………………..

u1) Type-xALS47
including teakwood lattice screen in polish finish Sqm 13

Unit Rate in words …………………………………..

v1) Type-xALS48 Sqm 31

Unit Rate in words …………………………………..

w1) Type-xALS49 Sqm 38

Unit Rate in words …………………………………..

x1) Type-xALS50 Sqm 140

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-33 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

y1) Type-xALS51 Sqm 10

Unit Rate in words …………………………………..

z1) Type-xALS52
including teakwood lattice screen in polish finish Sqm 175

Unit Rate in words …………………………………..

a2) Type-xALS53 Sqm 40

Unit Rate in words …………………………………..

b2) Type-xALS54 Sqm 45

Unit Rate in words …………………………………..

c2) Type-xALS55 Sqm 33

Unit Rate in words …………………………………..

c2) Type-xALS56 Sqm 20

Unit Rate in words …………………………………..

d2) Type-xALS57 Sqm 6

Unit Rate in words …………………………………..

e2) Type-xALS58 Sqm 25

Unit Rate in words …………………………………..

f2) Type-xALS59 Sqm 146

Unit Rate in words …………………………………..

g2) Type-xALS60 Sqm 82

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-34 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

h2) Type-xALS61 Sqm 42

Unit Rate in words …………………………………..

i2) Type-xALS62 Sqm 31

Unit Rate in words …………………………………..

j2) Type-xALS63 Sqm 14

Unit Rate in words …………………………………..

k2) Type-xALS64 Sqm 17

Unit Rate in words …………………………………..

02-79C Window Type xALW1: 30mm thick double glazed


insulated sliding window with 12mm thick (6+6mm)
inner clear laminated glass +12mm air gap, +6mm
anti sun glass tinted on powder coated heavy duty
aluminum framing & support system (as required
by design/calculations with compatible hardware
set (as per schedule) including fixing and fixing
accessories etc. complete in all respect as shown
on the drawing and specification.
Sqm 8

Unit Rate in words …………………………………..

02-80C Window Type: 30mm thick double glazed


insulated curtain wall with 12mm thick (6+6mm)
inner clear laminated glass +12mm air gap, +6mm
anti sun glass tinted on powder coated heavy duty
aluminum framing & support system as required
by design/calculations with compatible hardware
set (as per schedule) including fixing and fixing
accessories etc. of the following design types;
complete in all respect as shown on the drawing
and specification.

a) Type-xCW2 Sqm 34

Unit Rate in words …………………………………..

b) Type-xCW3 Sqm 29

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-35 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

c) Type-xCW4 Sqm 62

Unit Rate in words …………………………………..

d) Type-xCW5 Sqm 73

Unit Rate in words …………………………………..

e) Type-xCW6 Sqm 57

Unit Rate in words …………………………………..

f) Type-xCW7
with smoke outlet Sqm 191

Unit Rate in words …………………………………..

g) Type-xCW8
with smoke outlet Sqm 64

Unit Rate in words …………………………………..

h) Type-xCW9
with smoke outlet Sqm 12

Unit Rate in words …………………………………..

i) Type-xCW10 Sqm 4

Unit Rate in words …………………………………..

j) Type-xCW11 Sqm 4

Unit Rate in words …………………………………..

k) Type-xCW12 Sqm 2

Unit Rate in words …………………………………..

l) Type-xCW13 Sqm 4

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-36 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

m) Type-xCW14 Sqm 28

Unit Rate in words …………………………………..

n) Type-xCW15 Sqm 30

Unit Rate in words …………………………………..

o) Type-xCW16 Sqm 45

Unit Rate in words …………………………………..

p) Type-xCW17 Sqm 25

Unit Rate in words …………………………………..

02-81C Window Type xALG1: 12mm thick (6+6mm) clear


laminated glass on powder coated heavy duty
aluminum frame with compatible hardware set (as
per schedule) including 10mm thick MS square
bar grill, fixing and fixing accessories etc. of the
following design types; complete in all respect as
shown on the drawing and specification.
Sqm 3

Unit Rate in words …………………………………..

02-82C Window Type: 30mm thick double glazed


insulated window with 12mm thick (6+6mm) inner
clear laminated glass +12mm air gap, +6mm anti
sun glass tinted on powder coated heavy duty
aluminum framing & support system as required
by design/calculations with compatible hardware
set (as per schedule) including fixing and fixing
accessories etc. of the following design types;
complete in all respect as shown on the drawing
and specification.

a) Type-xALF1 Sqm 9

Unit Rate in words …………………………………..

b) Type-xALF2 Sqm 5

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-37 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

02-83C Wall type W10: Powder coated heavy duty


aluminum frame with glazing/screen/partition
including all accessories etc complete in all
respect as shown on the drawing and
specification. Sqm 250

Unit Rate in words …………………………………..

ALUMINUM COMPOSITE PANELS


Ref. Sec.No. 6230

02-84C Aluminum Composite Panels Cladding with


mounting system including anchorage, shims,
fasteners, gaskets, sealants, fixing and fixing
accessories etc. complete in all respects as per
manufacturer's recommendations and as shown
on the drawing and specification. Sqm 100

Unit Rate in words …………………………………..

02-85C Composite Aluminum Jali Panels in approved


colour/ texture/ finish with mounting system as per
design including fixing and fixing accessories etc.
complete in all respects as per manufacturer's
recommendations and as shown on the drawing
and specification. Sqm 10

Unit Rate in words …………………………………..

POLYCARBONATE SHEET
Ref. Sec.No. 6240

02-86C 8mm thick Poly-Carbonate EGG crate sheet


covering as per design including fixing and fixing
accessories etc. complete in all respects as per
manufacturer's recommendations and as shown
on the drawing and specification. (Excluding steel
structure) Sqm 370

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-38 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

WATER PROOFING AND BUILT-UP ROOFING


Ref. Sec.No. 6411

02-87C Two coats of hot bitumen grade 10/20 applied @


1 Kg./sq.m. per coat to all structural concrete
surfaces in contact with earth etc complete in all
respect as shown on the drawings. Sqm 29,550

Unit Rate in words …………………………………..

02-88C Water proofing and built-up roofing of the following


types over roof slab etc; complete in all respect as
shown on the drawing and specification:

a) Type-R1 Sqm 12,035

Unit Rate in words …………………………………..

b) Type-R2 Sqm 4,015

Unit Rate in words …………………………………..

CEMENT PLASTER
Ref. Sec.No. 6521

02-89C 12mm thick cement sand plaster to specified


interior surfaces etc complete in all respect as
shown on the drawings. Sqm 75,000

Unit Rate in words …………………………………..

02-90C 20mm thick cement sand plaster to specified


exterior surfaces etc complete in all respect as
shown on the drawings. Sqm 7,500

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-39 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

FLOOR AND WALL FINISHES


Ref. Sec.No. 6600

02-91C Floor type F02: 600x600x8mm thick fully vitrified


glazed porcelain tile flooring in approved
color/shade and texture conforming to ISO 13006
Bla requirements etc, laid in combination of
rectilinear/ diagonal pattern filled with matching
grout, provide thermal expansion 8mm thick PVC
divider strip in 6mm gap at a distance of 6000mm
from c/c in both directions, set in specified cement
sand mortar including 50mm thick Class 'C'
concrete screed, cement mortar with approved
adhesive admixture, 20mm thick 1:3 dry cement
mortar binding course and dry cement spread &
splash of water etc.; complete in all respects as
shown on the drawing & specification. Sqm 5,990

Unit Rate in words …………………………………..

02-92C Floor type F03: 300x300x8mm fully vitrified semi


glazed porcelain tile flooring in approved
color/shade and texture conforming to ISO 13006
Bla requirements, laid in specified pattern filled
with water tight matching grout; set in specified
cement sand mortar including water barrier course
of approved liquid proofing (application as per
manufacturer's recommendation), 45mm thick
Class 'C' concrete screed, cement mortar with
approved adhesive admixture, 20mm thick 1:3 dry
cement mortar binding course, dry cement spread
& splash of water etc.; complete in all respects as
shown on the drawing & specification. Sqm 1,638

Unit Rate in words …………………………………..

02-93C Floor type F04: 450x450x10mm heavy duty acid


resistant ceramic tile flooring in approved
color/shade and texture, laid in specified pattern
filled with acid resistant grout; set in specified
cement sand mortar including thermal expansion
joint, 50mm thick Class 'C' concrete screed,
cement mortar with approved adhesive admixture,
20mm thick 1:3 dry cement mortar binding course
and dry cement spread & splash of water etc.;
complete in all respects as shown on the drawing
& specification. Sqm 653

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-40 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

02-94C Floor type F05: Wall to wall broadloom carpet


flooring in approved color/ shade & texture, laid on
finished floor forming row (suff) for prayers
including carpet tacking device etc.; complete in all
respects as shown on the drawing & specification.
Sqm 141

Unit Rate in words …………………………………..

02-95C Floor type F06: 600x190x12mm interlocking


laminated wooden strips flooring in approved color
shade, texture in specified pattern; including 6mm
foam pad, water barrier course of approved liquid
proofing (application as per manufacturer's
recommendations), Class 'C' concrete screed,
1mm thick plastic barrier etc.; complete in all
respects as shown on the drawing & specification.
Sqm 53

Unit Rate in words …………………………………..

02-96C Floor type F07: 80mm thick heavy duty smooth


cemented screed floor comprising top surface
floor 2mm thick self leveling, solvent free, epoxy
overlay topping of approved quality laid as per
specification & manufacturer's recommendations
etc.; including cement mortar with approved
adhesive admixture,Class 'C' concrete screed with
10mm dia 200x200 wire mesh, cement mortar with
approved adhesive, joints etc; complete in all
respect as shown on the drawing & specification.
Sqm 3,015

Unit Rate in words …………………………………………………………………………

02-97C Floor type F08: 80mm thick Class 'C' cement


concrete screed (Full Body) with hardener
compound laid in panels not more than
2400x2400mm in steel troweled finish and
separated by glass divider strip etc; complete in all
respect as shown on the drawing & specification.
Sqm 1,240

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-41 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

02-98C Floor type F09: 80mm thick Class 'C' cement


concrete screed (Full Body) laid in panels not
more than 2400x2400mm in steel troweled finish
and separated by glass divider strip etc.; complete
in all respects as shown on the drawing &
specification. Sqm 62

Unit Rate in words …………………………………..

02-99C Floor type F10: 2mm thick PVC flooring with


rubberized underlay & 4mm thick pvc lining strip,
laid in specified pattern etc.; including cement
mortar with approved adhesive admixture, Class
'C' concrete screed etc.; complete in all respects
as shown on the drawing & specification. Sqm 246

Unit Rate in words …………………………………..

02-100C Floor type F11: 2mm thick anti-static heavy duty


PVC tile flooring with rubberized underlay laid in
specified pattern gaps filled with grout as per
manufacturer's recommendations including
cement mortar with approved adhesive admixture,
Class 'C' concrete screed etc.; complete in all
respects as shown on the drawing & specification.
Sqm 280

Unit Rate in words …………………………………..

02-101C Floor type F12: 600x600x10mm Heavy duty


carpet tile flooring in approved color shade, texture
and design with rubberized under lay over
cemented floor, gaps filled with grout as per
manufacturer's recommendations including Class
'C' concrete screed, cement mortar with approved
adhesive admixture, 20mm thick 1:3 dry cement
mortar binding course and dry cement spread &
splash of water and carpet tacking device etc.;
complete in all respects as shown on the drawing
& specification. Sqm 82

Unit Rate in words …………………………………..

02-102C 100mm thick Class 'D' cement concrete sub-floor/


bed etc.; complete in all respects as shown on the
drawing & specification. Sqm 17,227

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-42 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

02-103C 100mm thick Class 'C' cement concrete sub-


floor/ bed etc.; complete in all respects as shown
on the drawing & specification. Sqm 653

Unit Rate in words …………………………………..

02-104C Skirting type SK02: 8mm thick porcelain tile


skirting same as floor tiles in approved size,
color/shade and texture, confirming to ISO 13006
Bla requirements set in specified cement sand
mortar including rough base plaster etc.; complete
in all respects as shown on the drawing &
specification. Sqm 600

Unit Rate in words …………………………………..

02-105C Skirting type SK03: 10mm thick acid proof


ceramic tile skirting in approved size, color/shade
and texture set in specified cement sand mortar
including rough base plaster etc.; complete in all
respects as shown on the drawing & specification. Sqm 65

Unit Rate in words …………………………………..

02-106C Skirting type SK04: 20mm thick teakwood


skirting in lacquered polished finish in approved
size, color/shade and texture etc.; complete in all
respects as shown on the drawing & specification. Sqm 600

Unit Rate in words …………………………………..

02-107C Skirting type SK05: 13mm thick cemented


skirting in approved size/ panels, color/ shade and
texture including rough base plaster etc.; complete
in all respects as shown on the drawing & Sqm 305

Unit Rate in words …………………………………..

02-108C Skirting type SK06: 100mm high PVC tile skirting


in approved size/ panels, color/ shade and texture
including wooden base etc.; complete in all
respects as shown on the drawing & specification. Sqm 30

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-43 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

02-109C Skirting type SK08: Epoxy skirting including


epoxy coating, 13mm thick cemented skirting in
approved size/ panels, color/ shade and texture &
base plaster etc.; complete in all respects as
shown on the drawing & specification. Sqm 300

Unit Rate in words …………………………………..

02-110C Staircase Type 5 (Stair N8, N9, N10) &


Staircase Type 6 (Stair N7)
50mm thick fairfaced precast pigmented concrete
steps including c.c mortar in tread & riser etc.;
complete in all respects as shown on the drawing
and specification. Sqm 118

Unit Rate in words …………………………………..

02-111C Wall type W03: 300x300x8mm fully vitrified


glazed porcelain tile on wall in approved color/
shade and texture, confirming to ISO 13006 Bla
requirements laid in specified pattern filled with
impervious grout, set in specified cement sand
mortar including base plaster etc; complete in all
respect as shown on the drawing & specification. Sqm 2,500

Unit Rate in words …………………………………..

02-112C Wall type W04: 300x600x8mm fully vitrified


glazed porcelain tile on wall in approved color/
shade and texture, confirming to ISO 13006 Bla
requirements laid in specified pattern filled with
impervious grout, set in specified cement sand
mortar including base plaster etc; complete in all
respect as shown on the drawing & specification. Sqm 3,275

Unit Rate in words …………………………………..

02-113C Wall type W05: 150x600x8mm fully vitrified


glazed porcelain tile on wall in approved color/
shade and texture, confirming to ISO 13006 Bla
requirements laid in specified pattern filled with
impervious grout, set in specified cement sand
mortar including base plaster etc; complete in all
respect as shown on the drawing & specification. Sqm 2,100

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-44 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

02-114C Wall type W06: Combination of pattern consisting


of :
Main Wall: 300x300x8mm thick fully vitrified
glazed porcelain tiles on wall in approved
color/shade and texture conforming to ISO 13006
Bla requirements etc, laid in specified pattern
filled with water tight grout;
Wall Border: 150x150x8mm thick fully vitrified
glazed porcelain tiles on wall in approved
color/shade and texture conforming to ISO 13006
Bla requirements etc, laid in specified pattern
filled with water tight grout;
set in specified cement sand mortar including base
plaster etc; complete in all respect as shown on
the drawing & specification. Sqm 400

Unit Rate in words …………………………………..

02-115C Wall type W13: 450x450mm acid resistant heavy


duty ceramic tile on wall in approved color/ shade
and texture laid in specified pattern filled with acid
resistant grout, set in specified cement sand
mortar including base plaster etc; complete in all
respect as shown on the drawing & specification.
Sqm 250

Unit Rate in words …………………………………..

02-116C Wall type W14: Precast pigmented Terrazzo


panel over specified surfaces on wall in approved
size, color/ shade and texture laid in specified
pattern including stainless steel anchor & counter
sunk expansion bolts, base plaster & fixing
accessories etc; complete in all respect as shown
on the drawing & specification. Sqm 1,250

Unit Rate in words …………………………………..

02-117C Ramp Finishes: Anti slip broom texture finish cc


floor on ramp with grooves etc; complete in all
respect as shown on the drawing & specification. Sqm 265

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-45 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

02-118C Precast pigmented Terrazzo moulding panel over


specified surfaces in approved size, color/ shade
and texture laid in specified pattern including base
plaster & fixing accessories etc; complete in all
respect as shown on the drawing & specification. Rm 175

Unit Rate in words …………………………………..

02-119C Glazed ceramic tiles on wall in approved color/


shade and texture laid in specified pattern filled
with matching grout, set in specified cement sand
mortar including base plaster etc; complete in all
respect as shown on the drawing & specification. Sqm 350

Unit Rate in words …………………………………..

MARBLE WORKS
Ref. Sec.No. 6531

02-120C 20mm thick prepolished marble sill of specified


size, colour and quality laid in approved pattern
filled with grouting compound, set in specified
cement sand mortar including cement concrete
screed etc. complete in all respects as shown on
the drawing & specifications. Sqm 20

Unit Rate in words …………………………………..

02-121C Marble moulding over specified surfaces in


approved size, color/ shade and texture, laid in
specified pattern filled with matching grout, set in
specified cement sand mortar including base
plaster etc; complete in all respect as shown on
the drawing & specification.

a) Moulding of size 65x50mm Rm 575

Unit Rate in words …………………………………..

b) Moulding of size 200x100mm Rm 385

Unit Rate in words …………………………………..

c) Moulding of size 50x50mm Rm 225

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-46 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

d) Moulding of size 100x80mm Rm 350

Unit Rate in words …………………………………..

e) Moulding 30mm thick Rm 25

Unit Rate in words …………………………………..

f) Moulding of size 100x110mm Rm 20

Unit Rate in words …………………………………..

02-122C Marble trim over specified surfaces in approved


size, color/ shade and texture laid in specified
pattern including base plaster etc; complete in all
respect as shown on the drawing & specification. Rm 625

Unit Rate in words …………………………………..

02-123C Wall type W02: 30mm thick marble tile cladding


chemically polished in approved color/ shade and
texture, laid in specified pattern filled with matching
grout, set in specified cement sand mortar
including base plaster and metal clamping system
to wall etc.; complete in all respects as shown on
the drawing & specification. Sqm 4,355

Unit Rate in words …………………………………..

02-124C 15mm thick marble tile cladding chemically


polished fixed with marble panel in approved color/
shade and texture, laid in specified pattern filled
with matching grout, set in specified cement sand
mortar including base plaster and metal clamping
system to wall etc.; complete in all respects as
shown on the drawing & specification.
Sqm 50

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-47 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

02-125C Staircase Type 2 (Stair N1)


30mm thick stair balustrade marble caping,
chemically polished in approved size, color/shade
and texture, set in specified cement sand mortar
including 15x15mm chamfering, 20x5mm groove
& cement concrete screed etc.; complete in all
respects as shown on the drawing & specification.
Sqm 60

Unit Rate in words …………………………………..

02-126C Prepolished marble/ stone threshold of specified


size, color and quality including bullnozing (where
required), c.c base, fixing and fixing accessories
etc. of the following types; complete in all respect
as shown on the drawing and specification.

a) Type-03: Marble Saddle/ Threshold


with 9x50mm aluminum strip Sqm 10

Unit Rate in words …………………………………..

b) Type-05: Stone Saddle/ Threshold


with 50x10mm SSTL divider Sqm 35

Unit Rate in words …………………………………..

c) Type-06: Marble Saddle/ Threshold


with waterproofing membrane Sqm 25

Unit Rate in words …………………………………..

d) Type-10: Marble Saddle/ Threshold


with 9x50mm aluminum strip Sqm 15

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-48 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

GRANITE WORKS
Ref. Sec.No. 6532

02-127C Floor type F01: 20mm thick granite tile flooring,


chemical polished in approved color/ shade and
texture, laid in rectilinear and diagonal pattern
arrangement in one or more basic color, with linear
band/ borders in different color pieces cut to
different shapes, 6mm brass/ stainless steel or
8mm thick PVC divider strip including construction
joints as detailed, filled with grouting compound,
set in specified cement sand mortar including
40mm thick Class 'C' concrete screed, 200x200
wire mesh, cement mortar with approved adhesive
admixture, 20mm thick 1:3 dry cement mortar
binding course and dry cement spread & splash of
water etc.; complete in all respects as shown on
the drawing & specification.
Sqm 23,110

Unit Rate in words …………………………………..

02-128C Skirting type SK01: 10mm thick granite skirting,


chemical polished in approved size, color/shade
and texture, set in specified cement sand mortar
including 20mm thick c.c base mortar etc.;
complete in all respects as shown on the drawing
& specification. Sqm 2,315

Unit Rate in words …………………………………..

02-129C Wall type W01: 30mm thick granite tile cladding


chemically polished in approved color/ shade and
texture, laid in specified pattern filled with matching
grout, fixed with specified cement sand mortar and
metal clamping system to wall including base
plaster etc.; complete in all respects as shown on
the drawing & specification.
Sqm 5,435

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-49 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

02-130C 20mm thick granite tile cladding/ fascia chemically


polished in approved color/ shade and texture,
laid in specified pattern filled with matching grout,
fixed with specified cement sand mortar and metal
clamping system to wall including base plaster
etc.; complete in all respects as shown on the
drawing & specification.
Sqm 50

Unit Rate in words …………………………………..

02-131C Prepolished Granite vanity top to specified


surfaces comprising 30mm thick granite top slab,
20mm thick apron and back splash of approved
size, color and quality including fixing and fixing
accessories etc; complete in all respect as shown
on the drawing and specification and as directed
by the Engineer. Rm 155

Unit Rate in words …………………………………..

02-132C Staircase Type 1 (Stair N2)


Staircase Type 2 (Stair N1, N4)
Staircase Type 3 (Stair N3)
Staircase Type 4 (Stair N5, N6)
20mm thick granite skirting, chemical polished in
approved size, color/shade and texture, set in
specified cement sand mortar including rough
base plaster etc.; complete in all respects as
shown on the drawing & specification. Sqm 50

Unit Rate in words …………………………………..

02-133C Staircase Type 1 (Stair N2)


Staircase Type 2 (Stair N1, N4)
Staircase Type 3 (Stair N3)
Staircase Type 4 (Stair N5, N6)
20mm thick prepolished granite on treads, risers
and landing of specified size, colour and quality
laid in approved pattern filled with grouting
compound, set in specified cement sand mortar
including cement concrete screed etc. complete in
all respects as shown on the drawing &
specifications. Sqm 417

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-50 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

02-134C Staircase Type 1 (Stair N2)


Staircase Type 2 (Stair N4)
Staircase Type 3 (Stair N3)
20mm thick prepolished granite sill of specified
size, colour and quality laid in approved pattern
filled with grouting compound, set in specified
cement sand mortar including cement concrete
screed etc. complete in all respects as shown on
the drawing & specifications. Sqm 50

Unit Rate in words …………………………………..

TEXTURED / GRAFFITO WALL COATING


Ref. Sec.No. 6701

02-135C Wall type W07: Texture coating over cc plaster/


cement fiber board over specified surfaces etc;
complete in all respect as shown on the drawing &
specification. Sqm 8,150

Unit Rate in words …………………………………..

FALSE CEILING
Ref. Sec.No. 6560

02-136C False Ceiling Type C01: Perforated linear


aluminum strip ceiling placed at 55/155/255mm
wide c/c, but jointed backed enamel painted
suspended by 6mm dia. rigid threaded rods &
compatible suspension system with provision of
light fixtures, HVAC grills & other fixtures with
sound insulation on top etc; complete in all respect
as shown on the drawing and specification.
Sqm 9,100

Unit Rate in words …………………………………..

02-137C False Ceiling Type C02: 300mm wide perforated


linear aluminum strip ceiling @ 300mm wide c/c,
butt jointed, backed enamel painted suspended by
6mm dia. rigid threaded rods & compatible
suspension system with provision of light fixtures,
HVAC grills & other fixtures with sound insulation
on top etc; complete in all respect as shown on the
drawing and specification. Sqm 5,660

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-51 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

02-138C False Ceiling Type C03: Aluminum Baffle ceiling


including acoustic membrane, mineral wool
insulation, baffle perforation, extruded aluminum
intersection joints, clamps, plastic cover cap, clip
twist, hanger, hanger rod and all fixing accessories
etc.; complete in all respect as shown on the
drawing and specification. Sqm 2,890

Unit Rate in words …………………………………..

02-139C False Ceiling Type C04: 100mm wide linear non-


perforated aluminum strip ceiling @ 100mm c/c,
butt jointed, backed enamel painted suspended by
6mm dia. rigid threaded rods & compatible
suspension system with provision of light fixtures,
HVAC grills & other fixtures with sound insulation
on top etc; complete in all respect as shown on the
drawing and specification. Sqm 1,506

Unit Rate in words …………………………………..

02-140C False Ceiling Type C05: 600x600mm flat


aluminum tiles ceiling (1-hour fire-rated), with
closed groove joints, backed enamel painted
suspended by 6mm dia. rigid threaded rods &
compatible suspension system with provision of
light fixtures, HVAC grills & other fixtures with
sound insulation on top etc; complete in all respect
as shown on the drawing and specification.
Sqm 4,108

Unit Rate in words …………………………………..

02-141C False Ceiling Type C06: 200mm wide perforated


aluminum strip ceiling @ 200mm c/c, butt jointed,
backed enamel painted suspended by 6mm dia.
rigid threaded rods & compatible suspension
system with provision of light fixtures, HVAC grills
& other fixtures with sound insulation on top and
300x600mm aluminum tiles laid as border at
corridor wall etc; complete in all respect as shown
on the drawing and specification. Sqm 1,255

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-52 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

02-142C False Ceiling Type C07: 200mm wide non-


perforated aluminum strip ceiling @ 200mm c/c,
butt jointed, backed enamel painted suspended by
6mm dia. rigid threaded rods & compatible
suspension system with provision of light fixtures,
HVAC grills & other fixtures with sound insulation
on top and 300x600mm aluminum tiles laid as
border at corridor wall etc; complete in all respect
as shown on the drawing and specification. Sqm 520

Unit Rate in words …………………………………..

02-143C False Ceiling Type C09: Plastic emulsion painted


cement board ceiling as per design, band/border
bulkhead with polished wooden/metal edge trim
with compatible suspension support system and
provision of light fixtures & other fixtures etc;
complete in all respect as shown on the drawing
and specification. Sqm 4,625

Unit Rate in words …………………………………..

02-144C False Ceiling Type C11: Combination


Border: Painted cement board band/border with
polished wooden edge trim
Ceiling Deck: 50x150mm polished wooden rafter
with provision of LED lights (decorative) &
600x600x12mm thick gypsum board tile ceiling
(DFB manufacturer or equivalent), texture paint
finish on concealed T-grid profile & metal
suspension system including access panel, trims,
edge trims, shadow trims, expansion joints (where
required) etc; complete in all respect as shown on
the drawing and specification. Sqm 795

Unit Rate in words …………………………………..

02-145C False Ceiling Type C12: Suspended ceiling


having decorative geometric pattern in hardwood
polished, with 15mm thick gypsum board ceiling
panel (DFB manufacturer or equivalent),in paint/
texture paint finish on to concealed rigid metal
suspension system including access panel, trims,
edge trims, shadow trims, expansion joints (where
required) etc; complete in all respect as shown on
the drawing and specification. Sqm 50

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-53 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

02-146C False Ceiling Type C13: 4mm aluminum


composite panel (FR) ceiling/bulkhead on to
framing with compatible suspension system etc;
complete in all respect as shown on the drawing
and specification. Sqm 90

Unit Rate in words …………………………………..

GYPSUM BOARD
Ref. Sec.No. 6605

02-147C Providing and installation of decorative panel in


moulded gypsum board, paint (texture coating
match with existing parapet) of specified size on
GI frame including fixing and fixing accessories
etc. complete in all respect as shown on the
drawing & specification.
Sqm 850

Unit Rate in words …………………………………..

PAINTING
Ref. Sec.No. 6700

02-148C Plastic emulsion paint to specified surfaces


including wall sealer primer etc complete in all
respect as shown on the drawings. Sqm 68,705

Unit Rate in words …………………………………..

02-149C Weather resistant paint to specified exterior


surfaces etc complete in all respect as shown on
the drawings. Sqm 13,570

Unit Rate in words …………………………………..

02-150C Water repellent coating to specified exterior


surfaces etc. complete in all respect as shown on
the drawings. Sqm 1,255

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-54 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

SIGNOLOGY
NON ILLUMINATED SIGNS
Ref. Sec.No. 4960

02-151C Provide and installed typical door plates sign with


appropriate message as per design and drawing
including fixing and fixing accessories etc. of the
following design types; complete in all respect as
shown on the drawing and specification.

a) Type-T1 No 8

Unit Rate in words …………………………………..

b) Type-T2 No 11

Unit Rate in words …………………………………..

c) Type-T3 No 11

Unit Rate in words …………………………………..

d) Type-T4 No 10

Unit Rate in words …………………………………..

e) Type-T5 No 11

Unit Rate in words …………………………………..

f) Type-T6 No 10

Unit Rate in words …………………………………..

g) Type-T7 No 8

Unit Rate in words …………………………………..

h) Type-T8 No 9

Unit Rate in words …………………………………..

i) Type-T9 No 6

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-55 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

j) Type-T10 No 12

Unit Rate in words …………………………………..

k) Type-T1 No 9

Unit Rate in words …………………………………..

l) Type-T12 No 6

Unit Rate in words …………………………………..

m) Type-E No 4

Unit Rate in words …………………………………..

ILLUMINATED SIGNS
Ref. Sec.No. 4970

02-152C Provide and installed Illuminated signs as per


design and drawing with appropriate message
including fixing and fixing accessories etc. of the
following design types; complete in all respect as
shown on the drawings and specification. Sqm 385

Unit Rate in words …………………………………..

FURNITURE & COUNTERS


Ref. Sec.No. 4290

02-153C Following types of the furniture as per design and


as approved by the Engineer etc. complete in all
respects as shown on the drawings and
specifications:

a) Sitting arrangement with side tables.

I) Sofa Set with Centre Table

i) Single seater No. 74

Unit Rate in words …………………………………..

ii) Two seater No. 118

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-56 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

iii) Centre tables with sofa set No. 50

Unit Rate in words …………………………………..

II) Air Port Waiting Chairs with Side Tables

i) single seater with side Tables No. 5

Unit Rate in words …………………………………..

ii) Two seater with side Tables No. 21

Unit Rate in words …………………………………..

iii) Three seater with side Tables No. 20

Unit Rate in words …………………………………..

iv) Four seater with side Tables No. 149

Unit Rate in words …………………………………..

v) Five seater with side Tables No. 30

Unit Rate in words …………………………………..

vi) Six seater with side Tables No. 47

Unit Rate in words …………………………………..

vii) Two seater without side Tables No. 31

Unit Rate in words …………………………………..

viii) Three seater without side Tables No. 37

Unit Rate in words …………………………………..

ix) Four seater without side Tables No. 21

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-57 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

x) Seven seater with side Tables No. 17

Unit Rate in words …………………………………..

b) Stainless Steel Planter Boxes of following sizes:

(i) 450mm dia & 400-500mm high No. 96

Unit Rate in words …………………………………..

(ii) 600mm dia & 400-500mm high No. 164

Unit Rate in words …………………………………..

(iii) 1200mm dia & 600-900mm high No. 41

Unit Rate in words …………………………………..

c) Heavy duty Stainless Waste Disposal Bins with


sorting/ segregation arrangement and clean out
bucket. No. 50

Unit Rate in words …………………………………..

d) Heavy duty Stainless Steel Ash tray No. 57

Unit Rate in words …………………………………..

e) Counters with high adjustable chairs of


following types:

i) Check-in Counters No. 80

Unit Rate in words …………………………………..

ii) Passport Control Counter No. 35

Unit Rate in words …………………………………..

(iii) Immigration Counter No. 40

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-58 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

iv) Custom Counter No. 10

Unit Rate in words …………………………………..

v) Mishandled Baggage Counter No. 10

Unit Rate in words …………………………………..

vi) Information/ Facilitation Desk Counter No. 20

Unit Rate in words …………………………………..

vii) Operation Desk Counter No. 15

Unit Rate in words …………………………………..

viii) Gate Counter No. 10

Unit Rate in words …………………………………..

ix) CAA Facilitation Counter No. 5

Unit Rate in words …………………………………..

x) Search Booth Counter No. 10

Unit Rate in words …………………………………..

f) 4 seater Dining Table No. 75

Unit Rate in words …………………………………..

g) Mobile Phone Charging KIOSK No. 7

Unit Rate in words …………………………………..

h) Wall Mounted Telephone Hoods No. 7

Unit Rate in words …………………………………..

i) Stationary Recliner Chairs No. 25

Unit Rate in words …………………………………..

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-59 August-2022
BILL OF QUANTITIES

CODE NO.02 - PASSENGER TERMINAL BUILDING


Rate Amount
Item No. Description Unit Qty
(Rs.) (Rs.)

j) Internet KIOSK No. 1

Unit Rate in words …………………………………..

k) Table lamp No. 45

Unit Rate in words …………………………………..

KEY CUTTING / DUPLICATING MACHINE

02-154C Supply, installation, testing, commissioning,


training of Employer's Staff and maintenance
during defect liability period of brand new imported
Key Cutting / Duplicating Machine of Western
Europe origin, complete in all respect as per
following specifications and requirements:

- Electronic Type Key Cutting / Duplicating


Machine with Microprocessor Control
- User Interface LCD (industrial color touch screen
type)
- For processing of edge and double edge cut keys

- Automatic Key Decoding and Cutting


- Illuminated Cutting Area
- Power Supply 220V 50Hz
- Provide multiple Jaws, Clamps, Cutters and other
accessories required to process the supplied key
types
- Provide key Blanks including 30 blanks for each
key type
- Provide Spare Cutters, decoder tracer,
consumables and other manufacturer's
recommended spare parts for two (2) years
operation
- Machine Model NINJA, manufactured by M/s
KEYLINE S.p.A, Italy or approved equivalent No. 1

Unit Rate in words …………………………………..

Total Cost of Code 02 (Civil Works) Carried


Over to Summary of Bid Price - C

Expansion of Terminal Building & Allied


Facilities at AIIAP, Lahore 02C-60 August-2022