You are on page 1of 11

PROJECT STATUS

UPDATED : 03 SEPTEMBER 2020

REF NO BUILDING / AREA/ ZONE DESIGN STATUS CONSTRUCTION STATUS REMARKS

B PROJECT - INFRASTRUCTURE (KAWASAN RESORT)

B 1 INFRASTRUCTURE - CONSTRUCTION DESIGN KONSTRUKSI

B 1 1 PERIMETER WALL 90%

B 1 2 ENTRANCE GATE SCHEMATIC PDW 50%

B 1 3 ACCESS ROAD - DRAINAGE SCHEMATIC PDW 50%

B 1 4 ACCESS ROAD - MEP SCHEMATIC PDW 50%

B 1 5 ACCESS ROAD - SOFTSCAPE SCHEMATIC PDW 50%

B 1 6 ACCESS ROAD - HARDSCAPE + ARTWORK SCHEMATIC PDW 50%

B 1 7 ACCESS ROAD - CUTFILL/FERTILIZER/SOILDEV SCHEMATIC PDW 50%

B 1 8 ROAD LIGHTING SCHEMATIC PDW 50%

B 1 9 BACKBONE - SECURITY POST & SYSTEM SCHEMATIC PDW 50%

B 1 10 BACKBONE - IT & COMMUNICATION SCHEMATIC PDW 50%

B 1 11 POND / DANAU / WATER STORAGE 50%

B 1 12 DEEP WELL / WATER SOURCE 50%

B 1 13 FIRE FIGHTING 0%

B 1 14 SIGNAGE KAWASAN 0%

B 1 15 SITEWORKS AND SITE SERVICES 0%

B 1 16 RELOCATION CEMETERY 100%

B 1 17 OTHERS

C PROJECT - HOTEL AREA

C 1 HOTEL DESIGN KONSTRUKSI

C 1 1 2 HOTEL (@52M2) - ARCHITECTURE 0% STR: 72% (s/d akhir Juli 2020)

14% (s/d akhir Juli 2020); LIFT sudah order 1pc


C 1 1 3 MEP Serv ice Lift, DP 10% dr total 8 units; Genset DP
10%; STP DP 10%; Chiller DP: 10%

C 1 2 1 LOBBY, RECEPTION AND BAR CONCEPT WOW 100% akan dilanjutkan oleh PDW

C 1 2 2 ADD, FUNCTION, RETAIL, BRIDAL ROOM CONCEPT WOW 100% akan dilanjutkan oleh PDW

C 1 2 3 BALLROOM CONCEPT WOW 100% akan dilanjutkan oleh PDW

C 1 2 4 BALLROOM BOH CONCEPT WOW 100% akan dilanjutkan oleh PDW

C 1 2 5 BALLROOM PREFUNCTION CONCEPT WOW 100% akan dilanjutkan oleh PDW

C 1 2 6 FUNCTION ROOM CONCEPT WOW 100% akan dilanjutkan oleh PDW

C 1 2 7 CONFERENCE ROOM CONCEPT WOW 100% akan dilanjutkan oleh PDW

C 1 3 1 HOTEL CONCEPT WOW 100% akan dilanjutkan oleh PDW

C 1 3 2 CORRIDOR CONCEPT WOW 100% akan dilanjutkan oleh PDW

C 1 3 3 RESORT LOBBY + RESTO, ADMIN, DROP OFF CONCEPT WOW 100% akan dilanjutkan oleh PDW

C 1 3 4 BALLROOMS CONCEPT WOW 100% akan dilanjutkan oleh PDW

C 1 4 1 GUESTROOM 0%

C 1 4 2 BOH (KITCHEN UTENSIL, OFFICE EQUIPMENT) 0%

C 1 4 3 FOOD SERVICE EQUIPMENT 0%

C 1 4 4 LAUNDRY EQUIPMENT 0%

C 1 4 5 COMPUTER HARDWARE AND SOFTWARE 0%

C 1 4 6 IT AND COMMUNICATION NETWORK 0%

C 1 4 7 AUDIO VISUAL EQUIPMENT 0%

C 1 4 8 UNIFORMS INCLUDED DESIGN O%

C 1 4 9 SIGNAGE O%

C 1 4 10 ENGINEERING AND HOUSEKEEPING 0%

C 1 4 11 ELECTRONIC DOOR LOCK 0%

C 1 4 12 BUGGIES 0%

C 1 5 1 POWER GENERATION PLANT AND FUEL STORAGE TBC TBC

C 1 5 2 GENSET BUILDING AND PLN SUBSTATION TBC TBC

C 1 5 3 SEWAGE TREATMENT PLAN TBC TBC

C 1 5 4 WATER RECYCLING PLANT TBC TBC

C 1 5 5 MOCK UP 1 AT SANGAJI OFFICE 100% 100%

C 1 5 6 MOCK UP 2 ON SITE TBC TBC

C 2 BEACH VILLA
C 2 1 1 BEACH VILLAS (@ 124M2) ARCH: 75%; ID: CONCEPT WOW 100% akan dilanjutkan oleh PDW

C 2 2 1 BEACH VILLAS (@ 124M2) ID: CONCEPT WOW 100%

C 2 3 1 BEACH VILLAS (@ 124M2) 0%

C 3 WATER VILLA
C 3 1 1 WATER VILLAS (@ 122M2) ARCH: 75%; ID: CONCEPT WOW 100%

C 3 1 2 WATER VILLAS (@ 403M2) ARCH: 75%; ID: CONCEPT WOW 100%

C 3 2 1 WATER VILLAS (@ 122M2) ID: CONCEPT WOW 100%

C 3 2 2 WATER VILLAS (@ 403M2) ID: CONCEPT WOW 100%

C 3 3 1 WATER VILLAS (@ 122M2) 0%

C 3 3 2 WATER VILLAS (@ 403M2) 0%


PROJECT STATUS
UPDATED : 03 SEPTEMBER 2020

REF NO BUILDING / AREA/ ZONE DESIGN STATUS CONSTRUCTION STATUS REMARKS

C 4 KIDS CLUB DESIGN KONSTRUKSI

C 4 1 CONSTRUCTION ARCH: 75%

C 4 2 FURNITURE, FITTINGS AND EQUIPMENT (FFE) ID: CONCEPT HADIPRANA: 50%

C 5 SPA + GYM DESIGN KONSTRUKSI

C 5 1 CONSTRUCTION ARCH: 75%


SPA CONCEPT BY LIFESTYE: 50%; ID CONCEPT
C 5 2 FURNITURE, FITTINGS AND EQUIPMENT (FFE) WOW: 100%
C 5 3 SPA EQUIPMENT 0%

C 5 4 GYM EQUIPMENT 0%

C 6 CHAPEL DESIGN KONSTRUKSI

C 6 1 CONSTRUCTION ARCH: 75%; ID: CONCEPT WOW 100%

C 6 2 FURNITURE, FITTINGS AND EQUIPMENT (FFE) 0%

C 7 SPECIALITY RESTAURANT DESIGN KONSTRUKSI

C 7 1 CONSTRUCTION ARCH: 75%; ID: CONCEPT WOW 100%

C 7 2 FURNITURE, FITTINGS AND EQUIPMENT (FFE) 0%

C 8 INFRASTRUCTURE DESIGN KONSTRUKSI

C 8 1 EARTHWORKS - CLEAN AREA SURROUND HOTEL TBC CHECK WITH YP

C 8 2 HARDSCAPE & SOFTSCAPE TBC DESIGN BY PDW

C 8 3 LAGOON 100% 100%

C 8 4 PARKING TBC CHECK WITH YP

C 8 5 BARRIER/ BREAKWATER 100% 100%

C 8 6 CONNECTING BRIDGE TBC

C 8 7 WALKWAY JETTY (WATER VILLA WALKWAY) TBC

C 8 8 PLATE DEUWKER 100%

C 8 8 SUPPLY OF KAYU ULIN KALIMANTAN 50%

C 9 UTILITIES AND OTHERS DESIGN KONSTRUKSI

C 9 1 WATER TREATMENT TBC

C 9 2 UTILITIES CONNECTION CHARGES TBC

C 9 3 RESORT POOLS 45% BORE PILE 80% DONE

C 9 4 LAGOON WATERSPORT TBC

C 10 CONTINGENCY COST
C 10 1 CONTINGENCY FEE (2.5%)

D PROJECT - RECREATION CONSTRUCTION

D 1 ZONA - FESTIVAL VILLAGE


D 1 1 PLANNING & DESIGN DEVELOPMENT DESIGN KONSTRUKSI

MASTERPLAN PDW: 100%; LANDSCAPE TLD &


D 1 1 1 DESIGN CONCEPT SCHEMATIC PDW: 50%; DD PDW: 10%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 1 1 2 DESIGN DEVELOPMENT SCHEMATIC PDW: 50%; DD PDW: 10%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 1 1 3 STRUCTURAL DRAWING SCHEMATIC PDW: 50%; DD PDW: 10%
D 1 1 4 ID / FF&E 0%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 1 1 5 MEP /HVAC SCHEMATIC PDW: 50%; DD PDW: 10%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 1 1 6 LANDSCAPE CONCEPT & DESIGN SCHEMATIC PDW: 50%; DD PDW: 10%
D 1 1 7 OTHERS
D 1 2 CONSTRUCTION PHASE DESIGN KONSTRUKSI

D 1 2 1 PRELIMINARY CUT&FILL: 75%

D 1 2 2 STRUCTURAL 0%

D 1 2 3 ARCHITECTURAL 0%

D 1 2 4 ID / FF&E / FINISHING 0%

D 1 2 5 MEP - PLUMBING 0%

D 1 2 6 MEP - ELECTRICAL 0%

D 1 2 7 MEP - SPECIAL LIGHTING / FIXTURES / ARMATURE 0%

D 1 2 8 MEP - SOUND SYSTEM 0%

D 1 2 9 MEP - HVAC 0%

D 1 2 10 MEP - OTHERS 0%

D 1 2 11 LANDSCAPE - SOFTSCAPE 0%

D 1 2 12 LANDSCAPE - HARDSCAPE 0%

D 1 2 13 LANDSCAPE - CUTFILL/FERTILIZER/SOILDEV 0%

D 1 2 14 PARKING LOT 0%

D 1 2 15 STAGE 0%

D 1 2 16 OTHERS 0%

D 1 2 17 OTHERS 0%

D 1 3 HOE / ROE DESIGN KONSTRUKSI

D 1 3 1 TOILETRIES 0%

D 1 3 2 SIGNAGE 0%

D 1 3 3 UNIFORM 0%

D 1 3 4 PURCHASE OF FAMILY BIKE 0%

D 1 3 5 PURCHASE OF ELECTRIC SCOOTER 0%

D 1 3 6 PURCHASE OF BIKE 0%

D 1 3 7
D 1 3 8
D 1 3 9
D 1 3 10 OTHERS
PROJECT STATUS
UPDATED : 03 SEPTEMBER 2020

REF NO BUILDING / AREA/ ZONE DESIGN STATUS CONSTRUCTION STATUS REMARKS

D 1 4 OTHER
D 1 4 1 BUDGET BALANCE

D 2 ZONA - SWIM W/ DOLPHIN


D 2 1 PLANNING & DESIGN DEVELOPMENT DESIGN KONSTRUKSI

MASTERPLAN PDW: 100%; LANDSCAPE TLD &


D 2 1 1 DESIGN CONCEPT SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 2 1 2 DESIGN DEVELOPMENT SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 2 1 3 STRUCTURAL DRAWING SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 2 1 4 ID / FF&E SCHEMATIC PDW: 50%
D 2 1 5 MEP /HVAC 0%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 2 1 6 LANDSCAPE CONCEPT & DESIGN SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 2 1 7 OTHERS SCHEMATIC PDW: 50%

D 2 2 CONSTRUCTION PHASE DESIGN KONSTRUKSI

D 2 2 1 PRELIMINARY 0%

D 2 2 2 STRUCTURAL 0%

D 2 2 3 ARCHITECTURAL 0%

D 2 2 4 ID / FF&E / FINISHING 0%

D 2 2 5 MEP - PLUMBING 0%

D 2 2 6 MEP - ELECTRICAL 0%

D 2 2 7 MEP - SPECIAL LIGHTING / FIXTURES / ARMATURE 0%

D 2 2 8 MEP - HVAC 0%

D 2 2 9 MEP - OTHERS 0%

D 2 2 10 LANDSCAPE - SOFTSCAPE 0%

D 2 2 11 LANDSCAPE - HARDSCAPE 0%

D 2 2 12 LANDSCAPE - CUTFILL/FERTILIZER/SOILDEV 0%

D 2 2 13 PENGADAAN DOLPHINS 0%

D 2 2 14 OTHERS 0%

D 2 3 HOE / ROE DESIGN KONSTRUKSI

D 2 3 1 TOILETRIES 0%

D 2 3 2 SIGNAGE 0%

D 2 3 3 UNIFORM 0%

D 2 3 4 TOOLS & EQUIPMENT 0%

D 2 3 5 OTHERS 0%

D 2 4 OTHER DESIGN KONSTRUKSI

D 2 4 1 BUDGET BALANCE

D 3 ZONA - SUBMARINE
D 3 1 PURCHASE OF UNIT DESIGN KONSTRUKSI

D 3 1 1 SUBMARINE REVIT WORKS: 40%

D 3 1 2 DELIVERY COST
D 3 1 3 TAX (PPN/PPNBM/BEA IMPORT/ETC)
D 3 1 4 PERMIT/CERTIFICATION/ ETC
D 3 1 5 TRAINING PROGRAM SETELAH PENERIMAAN SUBMARINE

D 3 2 OPERATIONAL SUPPORT DESIGN KONSTRUKSI

D 3 2 1 JETTY / FLOATING VESSEL / BARGE


D 3 2 2 PASSENGER BOAT (HOTEL - DIVE SITE) SOURCING UNTUK PENAWARAN

D 3 2 3 ASSISTING BOAT (ON SURFACE COMMUNICATION) SOURCING UNTUK PENAWARAN

D 3 2 4 BOAT ENGINE SOURCING UNTUK PENAWARAN

D 3 2 5 SUPPORTING BUILDING (MAINTENANCE / DRY DOCK) SURVEY LOKASI


MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 3 2 6 WAITING LOUNGE / LUNCH CAFETARIA SCHEMATIC PDW: 50%; DD PDW: 10%
D 3 2 7 FUEL TANK TBC

D 3 2 8 SAFETY EQUIPMENTS TBC

D 3 2 9 PILOT / TEHNICIAN / OPS STAFF TARGET PILOT ON SITE: JAN/ FEB 21

D 3 2 10 SURVEY TBC

D 3 2 11 SUPPORTING EQUIPMENTS MENUNGGU LIST DARI SELLER

D 3 2 12 SPARE PARTS MENUNGGU LIST DARI SELLER

D 3 2 13 MEP - PLUMBING TBC

D 3 2 14 MEP - ELECTRICAL TBC

D 3 2 15 MEP - SPECIAL LIGHTING / FIXTURES / ARMATURE TBC

D 3 2 16 MEP - HVAC TBC

D 3 2 17 MEP - OTHERS TBC


PROJECT STATUS
UPDATED : 03 SEPTEMBER 2020

REF NO BUILDING / AREA/ ZONE DESIGN STATUS CONSTRUCTION STATUS REMARKS

D 3 2 18
D 3 2 19 OTHERS
D 3 3 HOE / ROE
D 3 3 1 TOILETRIES 0%

D 3 3 2 SIGNAGE 0%

D 3 3 3 UNIFORM 0%

D 3 3 4 INSURANCE 0%

D 3 3 5 OTHERS
D 3 3 6 OTHERS
D 3 4 OTHER
D 3 4 1 BUDGET BALANCE

D 4 ZONA - DIVE CENTER & WATERSPORT


D 4 1 PLANNING & DESIGN DEVELOPMENT DESIGN KONSTRUKSI

MASTERPLAN PDW: 100%; LANDSCAPE TLD &


D 4 1 1 DESIGN CONCEPT SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 4 1 2 DESIGN DEVELOPMENT SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 4 1 3 STRUCTURAL DRAWING SCHEMATIC PDW: 50%
D 4 1 4 ID / FF&E 0%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 4 1 5 MEP /HVAC SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 4 1 6 LANDSCAPE CONCEPT & DESIGN SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 4 1 7 OTHERS SCHEMATIC PDW: 50%

D 4 2 CONSTRUCTION PHASE DESIGN KONSTRUKSI

D 4 2 1 PRELIMINARY 0%

D 4 2 2 STRUCTURAL - JETTY 0%

D 4 2 3 STRUCTURAL - BUILDING 0%

D 4 2 4 STRUCTURAL - MANGROVE WALK 0%

D 4 2 5 ARCHITECTURAL - BUILDING 0%

D 4 2 6 ARCHITECTURAL - MANGROVE WALK 0%

D 4 2 7 ID / FF&E / FINISHING 0%

D 4 2 8 MEP - PLUMBING 0%

D 4 2 9 MEP - ELECTRICAL 0%

D 4 2 10 MEP - SPECIAL LIGHTING / FIXTURES / ARMATURE 0%

D 4 2 11 MEP - HVAC 0%

D 4 2 12 MEP - OTHERS 0%

D 4 2 13 LANDSCAPE - SOFTSCAPE 0%

D 4 2 14 LANDSCAPE - HARDSCAPE 0%

D 4 2 15 LANDSCAPE - CUTFILL/FERTILIZER/SOILDEV 0%

D 4 2 16
D 4 2 17 OTHERS
D 4 3 HOE / ROE DESIGN KONSTRUKSI

D 4 3 1 TOILETRIES 0%

D 4 3 2 SIGNAGE 0%

D 4 3 3 UNIFORM 0%

D 4 3 4 FUEL TANK 0%

D 4 3 5 BUGGIES 0%

D 4 3 6 DIVE COMPRESSOR 1 0%

D 4 3 7 DIVE COMPRESSOR 2 0%

D 4 3 8 DIVING TANK 0%

D 4 3 9 DIVING GEAR - GUEST / RENTAL 0%

D 4 3 10 DIVING GEAR - GUIDE 0%

D 4 3 11 SNORKLING GEAR 0%

D 4 3 12 DIVE COMPUTER 0%

D 4 3 13 DIVE FINS 0%

D 4 3 14 CORAL BOOTS 0%

D 4 3 15 SNORKLING GEAR 0%

D 4 3 16 DIVE SHOP MERCHANDISE 0%

D 4 3 17 DIVING BOAT 0%

D 4 3 18 BOAT ENGINE 0%

D 4 3 19
D 4 3 20
D 4 3 21
D 4 3 22
D 4 3 23
D 4 3 24
D 4 3 25 OTHERS
D 4 4 OTHER
D 4 4 1 BUDGET BALANCE
PROJECT STATUS
UPDATED : 03 SEPTEMBER 2020

REF NO BUILDING / AREA/ ZONE DESIGN STATUS CONSTRUCTION STATUS REMARKS

D 5 ZONA - WATERFRONT
D 5 1 PLANNING & DESIGN DEVELOPMENT DESIGN KONSTRUKSI

MASTERPLAN PDW: 100%; LANDSCAPE TLD &


D 5 1 1 DESIGN CONCEPT SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 5 1 2 DESIGN DEVELOPMENT SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 5 1 3 STRUCTURAL DRAWING SCHEMATIC PDW: 50%
D 5 1 4 ID / FF&E 0%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 5 1 5 MEP /HVAC SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 5 1 6 LANDSCAPE CONCEPT & DESIGN SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 5 1 7 OTHERS SCHEMATIC PDW: 50%
D 5 2 CONSTRUCTION PHASE DESIGN KONSTRUKSI

D 5 2 1 PRELIMINARY 0%

D 5 2 2 STRUCTURAL 0%

D 5 2 3 ARCHITECTURAL 0%

D 5 2 4 ID / FF&E / FINISHING 0%

D 5 2 5 FF&E 0%

D 5 2 6 MEP - PLUMBING 0%

D 5 2 7 MEP - ELECTRICAL 0%

D 5 2 8 MEP - SPECIAL LIGHTING / FIXTURES / ARMATURE 0%

D 5 2 9 MEP - HVAC 0%

D 5 2 10 MEP - OTHERS 0%

D 5 2 11 LANDSCAPE - SOFTSCAPE 0%

D 5 2 12 LANDSCAPE - HARDSCAPE 0%

D 5 2 13 LANDSCAPE - CUTFILL/FERTILIZER/SOILDEV 0%

D 5 2 14 OTHERS
D 5 2 15 OTHERS
D 5 3 HOE / ROE DESIGN KONSTRUKSI

D 5 3 1 TOILETRIES 0%

D 5 3 2 SIGNAGE 0%

D 5 3 3 UNIFORM 0%

D 5 3 4 PURCHASE OF BUMPER BOAT 0%

D 5 3 5 PURCHASE OF ZORBE / WATER BALOON 0%

D 5 3 6 PURCHASE OF PADDLING BOAT 0%

D 5 3 7 GAMES OF PIRATE SHIP + CAFÉ 0%

D 5 3 8
D 5 3 9 OTHERS
D 5 4 OTHER
D 5 4 1 BUDGET BALANCE

D 6 ZONA - WATERBODY
D 6 1 PLANNING & DESIGN DEVELOPMENT DESIGN KONSTRUKSI

MASTERPLAN PDW: 100%; LANDSCAPE TLD &


D 6 1 1 DESIGN CONCEPT SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 6 1 2 DESIGN DEVELOPMENT SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 6 1 3 STRUCTURAL DRAWING SCHEMATIC PDW: 50%
D 6 1 4 ID / FF&E 0%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 6 1 5 MEP /HVAC SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 6 1 6 LANDSCAPE CONCEPT & DESIGN SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 6 1 7 OTHERS SCHEMATIC PDW: 50%

D 6 2 CONSTRUCTION PHASE DESIGN KONSTRUKSI

D 6 2 1 PRELIMINARY 0%

D 6 2 2 STRUCTURAL 0%

D 6 2 3 ARCHITECTURAL 0%

D 6 2 4 ID / FF&E / FINISHING 0%

D 6 2 5 FF&E 0%

D 6 2 6 MEP - PLUMBING 0%

D 6 2 7 MEP - ELECTRICAL 0%

D 6 2 8 MEP - SPECIAL LIGHTING / FIXTURES / ARMATURE 0%

D 6 2 9 MEP - HVAC 0%

D 6 2 10 MEP - OTHERS 0%

D 6 2 11
D 6 2 12 LANDSCAPE - SOFTSCAPE 0%

D 6 2 13 LANDSCAPE - HARDSCAPE 0%

D 6 2 14 LANDSCAPE - CUTFILL/FERTILIZER/SOILDEV 0%

D 6 2 15
D 6 2 16 OTHERS
D 6 3 HOE / ROE DESIGN KONSTRUKSI

D 6 3 1 TOILETRIES 0%

D 6 3 2 SIGNAGE 0%

D 6 3 3 UNIFORM 0%

D 6 3 4 PURCHASE OF FOUNTAIN EQUIPMENT 0%

D 6 3 5 OTHERS 0%

D 6 4 OTHER
PROJECT STATUS
UPDATED : 03 SEPTEMBER 2020

REF NO BUILDING / AREA/ ZONE DESIGN STATUS CONSTRUCTION STATUS REMARKS

D 6 4 1 BUDGET BALANCE

D 7 ZONA - FOREST MAZE


D 7 1 PLANNING & DESIGN DEVELOPMENT DESIGN KONSTRUKSI

MASTERPLAN PDW: 100%; LANDSCAPE TLD &


D 7 1 1 DESIGN CONCEPT SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 7 1 2 DESIGN DEVELOPMENT SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 7 1 3 STRUCTURAL DRAWING SCHEMATIC PDW: 50%
D 7 1 4 ID / FF&E 0%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 7 1 5 MEP /HVAC SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 7 1 6 LANDSCAPE CONCEPT & DESIGN SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 7 1 7 OTHERS SCHEMATIC PDW: 50%

D 7 2 CONSTRUCTION PHASE DESIGN KONSTRUKSI

D 7 2 1 PRELIMINARY 0%

D 7 2 2 STRUCTURAL 0%

D 7 2 3 ARCHITECTURAL 0%

D 7 2 4 ID / FF&E / FINISHING 0%

D 7 2 5 FF&E 0%

D 7 2 6 MEP - PLUMBING 0%

D 7 2 7 MEP - ELECTRICAL 0%

D 7 2 8 MEP - SPECIAL LIGHTING / FIXTURES / ARMATURE 0%

D 7 2 9 MEP - HVAC 0%

D 7 2 10 MEP - OTHERS 0%

D 7 2 11 LANDSCAPE - SOFTSCAPE 0%

D 7 2 12 LANDSCAPE - HARDSCAPE 0%

D 7 2 13 LANDSCAPE - CUTFILL/FERTILIZER/SOILDEV 0%

D 7 2 14 OTHERS
D 7 2 15 OTHERS
D 7 3 HOE / ROE DESIGN KONSTRUKSI

D 7 3 1 TOILETRIES 0%

D 7 3 2 SIGNAGE 0%

D 7 3 3 UNIFORM 0%

D 7 3 4 OTHERS
D 7 4 OTHER
D 7 4 1 BUDGET BALANCE

D 8 ZONA - FOREST ADVENTURE


D 8 1 PLANNING & DESIGN DEVELOPMENT DESIGN KONSTRUKSI

MASTERPLAN PDW: 100%; LANDSCAPE TLD &


D 8 1 1 DESIGN CONCEPT SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 8 1 2 DESIGN DEVELOPMENT SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 8 1 3 STRUCTURAL DRAWING SCHEMATIC PDW: 50%
D 8 1 4 ID / FF&E 0%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 8 1 5 MEP /HVAC SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 8 1 6 LANDSCAPE CONCEPT & DESIGN SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 8 1 7 OTHERS SCHEMATIC PDW: 50%

D 8 2 CONSTRUCTION PHASE DESIGN KONSTRUKSI

D 8 2 1 PRELIMINARY 0%

D 8 2 2 STRUCTURAL 0%

D 8 2 3 ARCHITECTURAL 0%

D 8 2 4 ID / FF&E / FINISHING 0%

D 8 2 5 FF&E 0%

D 8 2 6 MEP - PLUMBING 0%

D 8 2 7 MEP - ELECTRICAL 0%

D 8 2 8 MEP - SPECIAL LIGHTING / FIXTURES / ARMATURE 0%

D 8 2 9 MEP - HVAC 0%

D 8 2 10 MEP - OTHERS 0%

D 8 2 11 LANDSCAPE - SOFTSCAPE 0%

D 8 2 12 LANDSCAPE - HARDSCAPE 0%

D 8 2 13 LANDSCAPE - CUTFILL/FERTILIZER/SOILDEV 0%

D 8 2 14 TRACK DEVELOPMENT 0%

D 8 2 15 SOUND SYSTEM 0%

D 8 2 16 OTHERS
D 8 3 HOE / ROE DESIGN KONSTRUKSI

D 8 3 1 TOILETRIES 0%

D 8 3 2 SIGNAGE 0%

D 8 3 3 UNIFORM 0%

D 8 3 4 PURCHASE OF ATV 0%

D 8 3 5 PURCHASE OF MOUNTAIN BIKE 0%

D 8 3 6 PURCHASE OF MOTO CROSS 0%

D 8 3 7 OTHERS
D 8 3 8 OTHERS
D 8 3 9 OTHERS
D 8 3 10 OTHERS
PROJECT STATUS
UPDATED : 03 SEPTEMBER 2020

REF NO BUILDING / AREA/ ZONE DESIGN STATUS CONSTRUCTION STATUS REMARKS

D 8 4 OTHER
D 8 4 1 BUDGET BALANCE

D 9 ZONA - FLOWER PARK


D 9 1 PLANNING & DESIGN DEVELOPMENT DESIGN KONSTRUKSI

MASTERPLAN PDW: 100%; LANDSCAPE TLD &


D 9 1 1 DESIGN CONCEPT SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 9 1 2 DESIGN DEVELOPMENT SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 9 1 3 STRUCTURAL DRAWING SCHEMATIC PDW: 50%
D 9 1 4 ID / FF&E 0%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 9 1 5 MEP /HVAC SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 9 1 6 LANDSCAPE CONCEPT & DESIGN SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 9 1 7 OTHERS SCHEMATIC PDW: 50%

D 9 2 CONSTRUCTION PHASE DESIGN KONSTRUKSI

D 9 2 1 PRELIMINARY 0%

D 9 2 2 STRUCTURAL 0%

D 9 2 3 ARCHITECTURAL 0%

D 9 2 4 ID / FF&E / FINISHING 0%

D 9 2 5 MEP - PLUMBING 0%

D 9 2 6 MEP - ELECTRICAL 0%

D 9 2 7 MEP - SPECIAL LIGHTING / FIXTURES / ARMATURE 0%

D 9 2 8 MEP - HVAC 0%

D 9 2 9 MEP - OTHERS 0%

D 9 2 10 LANDSCAPE - SOFTSCAPE 0%

D 9 2 11 LANDSCAPE - HARDSCAPE 0%

D 9 2 12 LANDSCAPE - CUTFILL/FERTILIZER/SOILDEV 0%

D 9 2 13 OTHERS
D 9 2 14 OTHERS
D 9 3 HOE / ROE DESIGN KONSTRUKSI

D 9 3 1 TOILETRIES 0%

D 9 3 2 SIGNAGE 0%

D 9 3 3 UNIFORM 0%

D 9 3 4 OTHERS
D 9 3 5 OTHERS
D 9 4 OTHER
D 9 4 1 BUDGET BALANCE

D 10 ZONA - FRUIT FARM


D 10 1 PLANNING & DESIGN DEVELOPMENT DESIGN KONSTRUKSI

MASTERPLAN PDW: 100%; LANDSCAPE TLD &


D 10 1 1 DESIGN CONCEPT SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 10 1 2 DESIGN DEVELOPMENT SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 10 1 3 STRUCTURAL DRAWING SCHEMATIC PDW: 50%
D 10 1 4 ID / FF&E 0%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 10 1 5 MEP /HVAC SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 10 1 6 LANDSCAPE CONCEPT & DESIGN SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 10 1 7 OTHERS SCHEMATIC PDW: 50%
D 10 2 CONSTRUCTION PHASE DESIGN KONSTRUKSI

D 10 2 1 PRELIMINARY 0%

D 10 2 2 STRUCTURAL 0%

D 10 2 3 ARCHITECTURAL 0%

D 10 2 4 ID / FF&E / FINISHING 0%

D 10 2 5 MEP - PLUMBING 0%

D 10 2 6 MEP - ELECTRICAL 0%

D 10 2 7 MEP - SPECIAL LIGHTING / FIXTURES / ARMATURE 0%

D 10 2 8 MEP - HVAC 0%

D 10 2 9 MEP - OTHERS 0%

D 10 2 10 LANDSCAPE - SOFTSCAPE 0%

D 10 2 11 LANDSCAPE - HARDSCAPE 0%

D 10 2 12 LANDSCAPE - CUTFILL/FERTILIZER/SOILDEV 0%

D 10 2 13 OTHERS
D 10 2 14 OTHERS
D 10 3 HOE / ROE DESIGN KONSTRUKSI

D 10 3 1 TOILETRIES 0%

D 10 3 2 SIGNAGE 0%

D 10 3 3 UNIFORM 0%

D 10 3 4 OTHERS
D 10 3 5 OTHERS
D 10 4 OTHER
D 10 4 1 BUDGET BALANCE

D 11 ZONA - PADDY FIELD


D 11 1 PLANNING & DESIGN DEVELOPMENT DESIGN KONSTRUKSI

D 11 1 1 DESIGN CONCEPT TBC


PROJECT STATUS
UPDATED : 03 SEPTEMBER 2020

REF NO BUILDING / AREA/ ZONE DESIGN STATUS CONSTRUCTION STATUS REMARKS

D 11 1 2 DESIGN DEVELOPMENT TBC

D 11 1 3 STRUCTURAL DRAWING TBC

D 11 1 4 ID / FF&E / FINISHING TBC

D 11 1 5 MEP /HVAC TBC

D 11 1 6 LANDSCAPE CONCEPT & DESIGN TBC

D 11 1 7 OTHERS TBC

D 11 2 CONSTRUCTION PHASE DESIGN KONSTRUKSI

D 11 2 1 PRELIMINARY 0%

D 11 2 2 STRUCTURAL 0%

D 11 2 3 ARCHITECTURAL 0%

D 11 2 4 ID / FF&E / FINISHING 0%

D 11 2 5 MEP - PLUMBING 0%

D 11 2 6 MEP - ELECTRICAL 0%

D 11 2 7 MEP - SPECIAL LIGHTING / FIXTURES / ARMATURE 0%

D 11 2 8 MEP - HVAC 0%

D 11 2 9 MEP - OTHERS 0%

D 11 2 10 LANDSCAPE - SOFTSCAPE 0%

D 11 2 11 LANDSCAPE - HARDSCAPE 0%

D 11 2 12 LANDSCAPE - CUTFILL/FERTILIZER/SOILDEV 0%

D 11 2 13 OTHERS
D 11 2 14 OTHERS
D 11 3 HOE / ROE DESIGN KONSTRUKSI

D 11 3 1 TOILETRIES 0%

D 11 3 2 SIGNAGE 0%

D 11 3 3 UNIFORM 0%

D 11 3 4 OTHERS
D 11 4 OTHER
D 11 4 1 BUDGET BALANCE

D 12 ZONA - TOURIST CENTER


D 12 1 PLANNING & DESIGN DEVELOPMENT DESIGN KONSTRUKSI

MASTERPLAN PDW: 100%; LANDSCAPE TLD &


D 12 1 1 DESIGN CONCEPT SCHEMATIC PDW: 50%; DD PDW: 10%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 12 1 2 DESIGN DEVELOPMENT SCHEMATIC PDW: 50%; DD PDW: 10%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 12 1 3 STRUCTURAL DRAWING SCHEMATIC PDW: 50%; DD PDW: 10%
D 12 1 4 ID / FF&E / FINISHING 0%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 12 1 5 MEP /HVAC SCHEMATIC PDW: 50%; DD PDW: 10%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 12 1 6 LANDSCAPE CONCEPT & DESIGN SCHEMATIC PDW: 50%; DD PDW: 10%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 12 1 7 OTHERS SCHEMATIC PDW: 50%; DD PDW: 10%
D 12 2 CONSTRUCTION PHASE DESIGN KONSTRUKSI

D 12 2 1 PRELIMINARY 0%

D 12 2 2 STRUCTURAL 0%

D 12 2 3 ARCHITECTURAL 0%

D 12 2 4 ID / FF&E / FINISHING 0%

D 12 2 5 MEP - PLUMBING 0%

D 12 2 6 MEP - ELECTRICAL 0%

D 12 2 7 MEP - SPECIAL LIGHTING / FIXTURES / ARMATURE 0%

D 12 2 8 MEP - HVAC 0%

D 12 2 9 MEP - OTHERS 0%

D 12 2 10 LANDSCAPE - SOFTSCAPE 0%

D 12 2 11 LANDSCAPE - HARDSCAPE 0%

D 12 2 12 LANDSCAPE - CUTFILL/FERTILIZER/SOILDEV 0%

D 12 2 13 OTHERS
D 12 2 14 OTHERS
D 12 3 HOE / ROE DESIGN KONSTRUKSI

D 12 3 1 TOILETRIES 0%

D 12 3 2 SIGNAGE 0%

D 12 3 3 UNIFORM 0%

D 12 3 4 OTHERS
D 12 4 OTHER
D 12 4 1 BUDGET BALANCE
PROJECT STATUS
UPDATED : 03 SEPTEMBER 2020

REF NO BUILDING / AREA/ ZONE DESIGN STATUS CONSTRUCTION STATUS REMARKS

D 13 ZONA - OUTBOND & CAMPING


D 13 1 PLANNING & DESIGN DEVELOPMENT DESIGN KONSTRUKSI

MASTERPLAN PDW: 100%; LANDSCAPE TLD &


D 13 1 1 DESIGN CONCEPT SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 13 1 2 DESIGN DEVELOPMENT SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 13 1 3 STRUCTURAL DRAWING SCHEMATIC PDW: 50%
D 13 1 4 ID / FF&E / FINISHING 0%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 13 1 5 MEP /HVAC SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 13 1 6 LANDSCAPE CONCEPT & DESIGN SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 13 1 7 OTHERS SCHEMATIC PDW: 50%
D 13 2 CONSTRUCTION PHASE DESIGN KONSTRUKSI

D 13 2 1 PRELIMINARY 0%

D 13 2 2 STRUCTURAL 0%

D 13 2 3 ARCHITECTURAL 0%

D 13 2 4 ID / FF&E / FINISHING 0%

D 13 2 5 MEP - PLUMBING 0%

D 13 2 6 MEP - ELECTRICAL 0%

D 13 2 7 MEP - SPECIAL LIGHTING / FIXTURES / ARMATURE 0%

D 13 2 8 MEP - HVAC 0%

D 13 2 9 MEP - OTHERS 0%

D 13 2 10 LANDSCAPE - SOFTSCAPE 0%

D 13 2 11 LANDSCAPE - HARDSCAPE 0%

D 13 2 12 LANDSCAPE - CUTFILL/FERTILIZER/SOILDEV 0%

D 13 2 13 ZIPLINE / FLYING FOX 0%

D 13 2 14 HIGH ROPES 0%

D 13 2 15 OTHER GAMES 0%

D 13 2 16 TENTS / EQUIPMENTS 0%

D 13 2 17 OTHERS
D 13 3 HOE / ROE DESIGN KONSTRUKSI

D 13 3 1 TOILETRIES 0%

D 13 3 2 SIGNAGE 0%

D 13 3 3 UNIFORM 0%

D 13 3 4 PURCHASE OF ZORBE / BUMPER BALOON


D 13 3 5 OTHERS
D 13 3 6 OTHERS
D 13 3 7 OTHERS
D 13 3 8 OTHERS
D 13 4 OTHER
D 13 4 1 BUDGET BALANCE

D 14 ZONA - DANCING & PROJECTION FOUNTAIN


D 14 1 PLANNING & DESIGN DEVELOPMENT DESIGN KONSTRUKSI

MASTERPLAN PDW: 100%; LANDSCAPE TLD &


D 14 1 1 DESIGN CONCEPT SCHEMATIC PDW: 50%
TBC
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 14 1 2 DESIGN DEVELOPMENT SCHEMATIC PDW: 50%
TBC
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 14 1 3 STRUCTURAL DRAWING SCHEMATIC PDW: 50%
TBC

D 14 1 4 ID / FF&E / FINISHING 0% TBC


MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 14 1 5 MEP /HVAC SCHEMATIC PDW: 50%
TBC
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 14 1 6 LANDSCAPE CONCEPT & DESIGN SCHEMATIC PDW: 50%
TBC
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 14 1 7 OTHERS SCHEMATIC PDW: 50%
TBC

D 14 2 CONSTRUCTION PHASE DESIGN KONSTRUKSI

D 14 2 1 PRELIMINARY 0%

D 14 2 2 STRUCTURAL 0%

D 14 2 3 ARCHITECTURAL 0%

D 14 2 4 ID / FF&E / FINISHING 0%

D 14 2 5 MEP - PLUMBING 0%

D 14 2 6 MEP - ELECTRICAL 0%

D 14 2 7 MEP - SPECIAL LIGHTING / FIXTURES / ARMATURE 0%

D 14 2 8 MEP - HVAC 0%

D 14 2 9 MEP - OTHERS 0%

D 14 2 10 LANDSCAPE - SOFTSCAPE 0%

D 14 2 11 LANDSCAPE - HARDSCAPE 0%

D 14 2 12 LANDSCAPE - CUTFILL/FERTILIZER/SOILDEV 0%

D 14 2 13 DANCING FOUNTAIN EQUIPMENT 0%

D 14 2 14 OTHERS
D 14 3 HOE / ROE DESIGN KONSTRUKSI

D 14 3 1 TOILETRIES 0%

D 14 3 2 SIGNAGE 0%

D 14 3 3 UNIFORM 0%

D 14 3 4 OTHERS
D 14 4 OTHER
D 14 4 1 BUDGET BALANCE
PROJECT STATUS
UPDATED : 03 SEPTEMBER 2020

REF NO BUILDING / AREA/ ZONE DESIGN STATUS CONSTRUCTION STATUS REMARKS

D 15 ZONA - PETTING ZOO


D 15 1 PLANNING & DESIGN DEVELOPMENT DESIGN KONSTRUKSI

MASTERPLAN PDW: 100%; LANDSCAPE TLD &


D 15 1 1 DESIGN CONCEPT SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 15 1 2 DESIGN DEVELOPMENT SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 15 1 3 STRUCTURAL DRAWING SCHEMATIC PDW: 50%
D 15 1 4 ID / FF&E / FINISHING 0%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 15 1 5 MEP /HVAC SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 15 1 6 LANDSCAPE CONCEPT & DESIGN SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 15 1 7 OTHERS SCHEMATIC PDW: 50%
D 15 2 CONSTRUCTION PHASE DESIGN KONSTRUKSI

D 15 2 1 PRELIMINARY 0%

D 15 2 2 STRUCTURAL 0%

D 15 2 3 ARCHITECTURAL 0%

D 15 2 4 ID / FF&E / FINISHING 0%

D 15 2 5 MEP - PLUMBING 0%

D 15 2 6 MEP - ELECTRICAL 0%

D 15 2 7 MEP - SPECIAL LIGHTING / FIXTURES / ARMATURE 0%

D 15 2 8 MEP - HVAC 0%

D 15 2 9 MEP - OTHERS 0%

D 15 2 10 LANDSCAPE - SOFTSCAPE 0%

D 15 2 11 LANDSCAPE - HARDSCAPE 0%

D 15 2 12 LANDSCAPE - CUTFILL/FERTILIZER/SOILDEV 0%

D 15 2 13 ARENA OF WALLABY 0%

D 15 2 14 ARENA OF ALPACA 0%

D 15 2 15 ARENA OF FENNEC FOX 0%

D 15 2 16 ARENA OF GREEN PEACOCK 0%

D 15 2 17 ARENA OF CHITAL 0%

D 15 2 18 ARENA OF RABBITS 0%

D 15 2 19 ARENA OF FISHES 0%

D 15 2 20 ARENA OF EXOTIC BIRDS / DOME 0%

D 15 2 21 ARENA OF MONKEYS 0%

D 15 2 22 OTHERS
D 15 3 HOE / ROE DESIGN KONSTRUKSI

D 15 3 1 TOILETRIES 0%

D 15 3 2 SIGNAGE 0%

D 15 3 3 UNIFORM 0%

D 15 3 4 PURCHASE OF WALLABY 0%

D 15 3 5 PURCHASE OF ALPACA 0%

D 15 3 6 PURCHASE OF FENNEC FOX 0%

D 15 3 7 PURCHASE OF GREEN PEACOCK 0%

D 15 3 8 PURCHASE OF CHITAL 0%

D 15 3 9 PURCHASE OF RABBITS 0%

D 15 3 10 PURCHASE OF FISHES 0%

D 15 3 11 PURCHASE OF EXOTIC BIRDS 0%

D 15 3 12 PURCHASE OF MONKEYS 0%

D 15 3 13 TEMPORARY ANIMALS TREATMENT 0%

D 15 3 14 SHIPMENT OF ANIMALS TO SITE 0%

D 15 3 15 OTHERS
D 15 4 OTHER
D 15 4 1 BUDGET BALANCE

D 16 ZONA - SKY BIKE


D 16 1 PLANNING & DESIGN DEVELOPMENT DESIGN KONSTRUKSI

MASTERPLAN PDW: 100%; LANDSCAPE TLD &


D 16 1 1 DESIGN CONCEPT SCHEMATIC PDW: 75%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 16 1 2 DESIGN DEVELOPMENT SCHEMATIC PDW: 75%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 16 1 3 STRUCTURAL DRAWING SCHEMATIC PDW: 75%
D 16 1 4 ID / FF&E N/A
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 16 1 5 MEP /HVAC SCHEMATIC PDW: 75%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 16 1 6 LANDSCAPE CONCEPT & DESIGN SCHEMATIC PDW: 75%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 16 1 7 PURCHASE OF UNIT SCHEMATIC PDW: 75%
D 16 1 8 OTHERS
D 16 2 CONSTRUCTION PHASE DESIGN KONSTRUKSI

D 16 2 1 PRELIMINARY 0%

D 16 2 2 STRUCTURAL 0%

D 16 2 3 ARCHITECTURAL 0%

D 16 2 4 SKYBIKE PLATFORM 0%

D 16 2 5 POLE FOOTING WORK 0%

D 16 2 6 MEP - PLUMBING 0%

D 16 2 7 MEP - ELECTRICAL 0%

D 16 2 8 MEP - SPECIAL LIGHTING / FIXTURES / ARMATURE 0%

D 16 2 9 MEP - HVAC 0%
PROJECT STATUS
UPDATED : 03 SEPTEMBER 2020

REF NO BUILDING / AREA/ ZONE DESIGN STATUS CONSTRUCTION STATUS REMARKS

D 16 2 10 MEP - OTHERS 0%

D 16 2 11 LANDSCAPE - SOFTSCAPE 0%

D 16 2 12 LANDSCAPE - HARDSCAPE 0%

D 16 2 13 LANDSCAPE - CUTFILL/FERTILIZER/SOILDEV 0%

D 16 2 14 ID / FF&E / FINISHING 0%

D 16 2 15 OTHERS
D 16 3 HOE / ROE DESIGN KONSTRUKSI

D 16 3 1 TOILETRIES 0%

D 16 3 2 SIGNAGE 0%

D 16 3 3 UNIFORM 0%

D 16 3 4 OTHERS
D 16 4 OTHER
D 16 4 1 BUDGET BALANCE

D 17 ZONA - RESORT ENTRANCE


D 17 1 PLANNING & DESIGN DEVELOPMENT DESIGN KONSTRUKSI

MASTERPLAN PDW: 100%; LANDSCAPE TLD &


D 17 1 1 DESIGN CONCEPT SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 17 1 2 DESIGN DEVELOPMENT SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 17 1 3 STRUCTURAL DRAWING SCHEMATIC PDW: 50%
D 17 1 4 ID / FF&E / FINISHING N/A
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 17 1 5 MEP /HVAC SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 17 1 6 LANDSCAPE CONCEPT & DESIGN SCHEMATIC PDW: 50%
MASTERPLAN PDW: 100%; LANDSCAPE TLD &
D 17 1 7 OTHERS SCHEMATIC PDW: 50%
D 17 2 CONSTRUCTION PHASE DESIGN KONSTRUKSI

D 17 2 1 PRELIMINARY 0%

D 17 2 2 STRUCTURAL 0%

D 17 2 3 ARCHITECTURAL 0%

D 17 2 4 ID / FF&E / FINISHING 0%

D 17 2 5 MEP - PLUMBING 0%

D 17 2 6 MEP - ELECTRICAL 0%

D 17 2 7 MEP - SPECIAL LIGHTING / FIXTURES / ARMATURE 0%

D 17 2 8 MEP - HVAC 0%

D 17 2 9 MEP - OTHERS 0%

D 17 2 10 LANDSCAPE - SOFTSCAPE 0%

D 17 2 11 LANDSCAPE - HARDSCAPE 0%

D 17 2 12 LANDSCAPE - CUTFILL/FERTILIZER/SOILDEV 0%

D 17 2 13 OFFICE / CHANGING ROOM / PARKING 0%

D 17 2 14 ENTRANCE LOGO / SIGNAGE 0%

D 17 2 15
D 17 2 16
D 17 2 17
D 17 2 18
D 17 2 19
D 17 2 20
D 17 2 21 OTHERS
D 17 3 HOE / ROE DESIGN KONSTRUKSI

D 17 3 1 TOILETRIES 0%

D 17 3 2 SIGNAGE 0%

D 17 3 3 UNIFORM 0%

D 17 3 4 OTHERS

You might also like