You are on page 1of 2

PROPOSED PLANT ROOM

SCHEDULE NO. 1 - PLANT ROOM

Item Description Qty Unit Rate (Ksh) Amount (Ksh)


Supply, install, test and commission the following
;-

LIGHTING POINTS
1.01 Lighting points wired in 1.5 mm2 SC CU cables
drawn in concealed 20mm diameter HG P.V.C
conduits for:-
a) one way switching 3 No.

SWITCHES
1.02 10Amps, switch plate as CLIPSAL or approved
equivalent as
a) one gang one way 1 No.

LIGHTING FITTINGS
1.03 Lighting fittings complete with bulbs or tubes as
follows:-
a) 1200mm Single SmartBright LED Batten
fitting complete with 18 watts Essential LED tube 2 No.
(TYPE A) as PHILIPS or approved equivalent

b) 9 Watts, cast aluminium bulkhead fitting for 9


Watts LED lamp with glass bowl as PHILIPS or 1 No.
approved equivalent. (TYPE BH)

SOCKET OUTLETS AND OTHER POWER


POINTS

1.04 13 Amps. Socket outlet points wired ring


comprising of 3x2.5 mm sq. single core PVCI
2 No.
copper cables drawn in concealed 25mm HG PVC
conduits including all accessories.

1.05 13 Amps. Moulded plate switched socket outlet


with neon indicator as BG or approved equivalent

a) twin. 2 No.

1.06 Manifold power point comprising wiring in


3x2.5mm2 PVC-SC-CU cables in concealed PVC 3 No.
conduits

1.07
20 Amps double pole switches with neon indicator
as CLIPSAL or approved equivalent for manifold 3 No.

SUB TOTAL C/F TO THE NEXT PAGE

1
PROPOSED PLANT ROOM

SCHEDULE NO. 1 CONT'D - PLANT ROOM

Item Description
Qty Unit Rate (Ksh) Amount (Ksh)
Supply, install, test and commission the following
;-
Sub Total B/F From PREVIOUS PAGE

CONSUMER UNIT
1.08 6 ways SP&N, flush mounted Consumer unit
complete with 100A integral isolator as HAGER or
1 No.
approved equivalent complete with all accessories
but excluding MCBs.
1.09 MCB’s for item above
(a) 10A, SP 1 No.
(b) 20A, SP 3 No.
(c) Blanking plates 2 No.

SUB-MAIN POWER DISTRIBUTION

1.10 6 sq mm 2-core PVC/SWA/PVC cables drawn in


ducts from DB to cable looping box in plant room 10 LM

1.11 3x6mm2 Single Core armoured Copper cables


drawn in PVC Conduits from cable looping box to 5 LM
Consumer unit in plant room

EARTHING.
1.12 Earthing of the building, comprising of the
following:-
a) 15 mm x 1800 mm earth rod as FURSE cat. No.
RB 105. 1 No.
b) 15 mm dia. Driving stud as FURSE cat.No.
ST100. 1 No.
c) Concrete inspection pit as FURSE cat.
No.PT005. (or a well made 320mm x 320mmx
210 mm depth pit.) 1 No.
e) 25x3mm copper tape 10 LM

SUB TOTAL C/F TO MAIN SUMMARY PAGE