You are on page 1of 31

Mahindra

World City
Chennai
Case Study : LAKEWOODS

Architecture Design IV
INTRODUCTION
Mahindra Lifespaces is one of the leading real estate
development companies in India.

We have projects across the country and provide


thoughtfully designed living spaces.

We espouse responsible, green design and


development, and are driven by our mission of
Sustainable Urbanization

Architect
Ar.SHEILA SRI PRAKASH
Founder and Chief Architect
SITE LEVEL
Site Details
LOCATION
Located on NH 16 (formerly NH 5) on the Chennai -Kolkata Highway,
MAHINDRA WORLD CITY, CHENNAI Administrative Block, Central
Avenue, Mahindra World City, Chengelpet Taluk, Kancheepuram,
TamilNadu - 603 004, India

Longitude = 79°59'0.05"E Latitude = 12°41'2.38"N

HISTORY
Mahindra World City is located outside Chennai city and was inaugurated on 21 September
2002 by the then Chief Minister of Tamil Nadu J. Jayalalitha. Built on the model of
sustainable urbanization Mahindra World City grew from a bed of business, infrastructure
and sustainable practices before evolving into a completely integrated city within a decade
of its inauguration
CLIMATE ANALYSIS
 The month with the highest relative humidity is
November (80.21 %)

 The month with the lowest relative humidity


is June (61.10 %)
 The least amount of rainfall occurs in February
Most precipitation falls in October, with an average of  The month with the highest number of rainy days is
205 mm October (19.90 days)

 The average temperatures vary during the


year by 7.0 °C | 12.7 °F

 The month with the lowest number of rainy days is


February (2.27 days)
 Chengalpattu are in the middle and the summers are that
easy to define

The best time to visit are January, February, March,


December
NEAREST
LANDMARK
Mahindra Zip Rooms
World City Mahindra
Developers World City

Ford Motors

4 KM 5 KM 10 KM
MAJOR ACCESS TO
SITE
Public Transports :
Bus Stations :
Mahindra world city free Bus stop (3.7 KM )
Veerapuram (3.2 KM )
Thirutheri (4.3 KM )

Train Stations :
Paranur Railway Station (2.7 KM )
Singaperumal koil (5.3 KM )
Chengalpattu (8.8 KM )

PORT : AIRPORT :
Chennai Port ( 38 KM ) Chennai City ( 36 KM )
Ennore Port ( 25 KM ) Chennai Airport ( 55 KM )
Kattupalli Port ( 23 KM )
TOPOGRAPHY

The Site has 26m


Topography Elevated
Mahindra World City Chennai
Zones

Business Residential SOCIAL


Zones Zones Zones
Capgemini Aqualily The Canopy
Rntbci Sylvan county MWC Club
Timken Engg & Iris Court Mahindra World
Research Nova School
Lear Corporation Downtown Hostel
NCr Corporation Jeevan Hospital
Kryolan Cosmetics On-Site Railway
Spirax Sarco Station
Wipro
AMENITIES
IN
LAKEWOODS
SWIMMING GYMNASIUM BADMINTON KIDS' PLAY
POOL COURT AREA

CLUB HOUSE 2 ELEVATORS JOGGING ELEVATED


PER TOWER TRACK LOUNGE

MULTIPURPOS INDOOR COURTYARD GAS BANK


E HALL GAMES ROOM PROVISION

CCTV SIT-OUT AREA


UTILITIES
Water supply :

100% of the landscaping water needs are met through Treated


water, additionally treated water supply

Is also provided to industries, commercial spaces as well for their


requirements

To reduce the water consumption, Xeriscaping is carried out,


which is planting of drought resistant variety of trees which
consume considerably lesser quantity of water.

To further reduce use of water, nature method of embedding clay


pots with small hole near trees is being adopted.

The pattern of landscaping reducing the extent of turfing and


planting more trees are adopted.Further tree varieties which
produce maximum quantity of oxygen are planted at site.
WASTE DISPOSAL
A 16 metric ton capacity Solid waste management plant has been established
at Mahindra World City Chennai

System for operation and maintenance of municipal waste management


covering adequately the process

Collection, transportation, treatment and disposal within Mahindra World City


From industrial, residential areas, commercial areas, open spaces etc

Presently generates about 2 MT per day of waste which is projected to grow


up to 16 MT per day

Out of the total waste generated ~ 40-45% constitutes biodegradable organic


matter and 30-40% recyclable material
ELECTRICITY
Estimated annual Energy savings:
232750 MWH

Estimated annual reduction in CO2 emissions:


181545 tones.

Installation of Solar PV :

The roof top at has 210 kWp and that of Lakewood's has 800 kWp Solar PV
installed and operational and 250 KWP is in execution, Ranka paper has
installed 100 KMP solar PV installed

Estimated annual Energy savings :

1625 MWH

Retrofitting of lighting fixtures at Evolve (Lakewood's at MWCC) : NOTE :

Reduction in electricity consumption at evolve building, through LED retrofit KWH = Kilowatt Hour
MWH = Megawatt Hour
Estimated annual Energy savings: KWP = Kilowatt Peak

99,450 kWh
Pioneers to commission a Off grid solar power plant in the Tamil Nadu state
Installed a 75 KW off-grid solar power plant at The Canopy – Commercial
centre

The solar system is designed to operate without any battery bank

The system starts its operation automatically in the morning as soon as the
solar modules receive the minimum sunlight required to power up the
inverters

Installed over an area of 800 Sq.m on the rooftop and consists of 315 Multi
Crystalline Solar Photovoltaic Modules each of 240W

Designed to generate 116000 units generated annually through the Solar


Power Plant, and offset 60 tones of CO2 annually
BIO DIVERSITY
An all new Bio-CNG plant was set up at Mahindra World City spread over an
area of 1,000 square meters

The Bio-CNG plant will create a carbon neutral ecosystem Bio-CNG plant
converts 100% of the eight tons of food and kitchen waste generated daily in
the city into 1000m3 of raw biogas

This raw bio gas can be enriched to yield 400kg/day of purified CNG grade
fuel which is equivalent to a 200kW power plant

As a by-product, four tons of organic fertilizer is produced each day The green
energy (Bio-CNG) is effectively used to replace CNG as an automotive fuel for
CNG buses and tractors

NOTE :
LPG for cooking purposes, as well as to power street lights at Mahindra World
City, Chennai The organic fertilizer is used by farmers to enhance soil fertility
Furthermore, the power generated is used for buses for free shuttle service CNG = Compressed Natural Gas
and tractors for cultivation LPG = Liquefied Petroleum Gas
BULILDING
PLANNING
LEVEL
Planning Study
SITE PLAN
OF

MAHINDRA
WORLD CITY
CHENNAI
SITE PLAN
OF
Land Area: 9.33 acres
LAKEWOODS
Total No. of Apartment: 747 Units
Total No. of Block: 9 Block
Towers: 14 -Storied Towers
Apartment Size: 3BHK 1013.86 Sq.ft | 2BHK
751.22 Sq.ft
FLOOR PLANS
2BHK
UNIT TYPE 2BHK

AREA SQ.FT

CARPET 751.22

DECK 37.89

UTILITY 24.54

COMMON AREA 265.33


FLOOR PLANS
3BHK
UNIT TYPE 3BHK

AREA SQ.FT

CARPET 1013.86

DECK 84.82

UTILITY 24.43

COMMON AREA 354.89


B’

FLOOR PLANS
2BHK
A A’ TYPICAL FLOOR
PLAN
TOWER A
B
Horizontal and
Vertical zoning
of spaces
Horizontal Zoning Used
By Passage Way @ 1.8m
Wide
Vertical Zoning Used By Staircases,
Lifts And Services Room
TYPOLOGY
OF SPACES

GROUND:

1. Entry/Exit 6. Lawn 11. Multipurpose Hall

2. Security Cabin 7. Open Badminton Court 12. Indoor Games Room

3. Garden 8. Gym 13. Elevated Lounge

4. Ramp 9. Jogging Track

5. Kid’s Play Area 10. Swimming Pool


MATERIAL
STUDY
MATERIAL’s
DOORS
ELECTRICAL
Main door – Pre Hung/Laminated
Switches – Flush door/equivalent
Anchor/equivalent
STRUCTURE Deck/utility – Pre Hung/Laminated
Telephone/Data points – Flush door /UPVC/equivalent
Aluminum Form
Living room
work Bedroom door, toilet door – Pre
RCC structure Hung/Laminated Flush
Phase – 3-Phase
TV points – Living and all door/equivalent
bedrooms
Hardware –
Kich/Dorset/Godrej/Yale/equivalent
EXTERNAL FINISH SECURITY
SYSTEMS
External wall – Texture
paint with CCTV at entry GEYSER
exterior weather shield, low gates, ground
VOC floor Toilets – Provision in
paint lobbies and wiring & plumbing
common areas
Terrace finish – like club
waterproofing + clay lounge and kids
tile with solar reflective play area
paint
C.P. FITTINGS

POWER LIFTS Toilets, common toilet


BACKUP – Jaquar/equivalent
SS finish in Lift car and
Reception lobby door
Power backup for WALL FINISHES
only; MS powder
units – 0.75 KW per
coated finish in all
unit Living, bedroom,
typical landing doors
Kitchen, deck/utility –
Power backup for Putty with acrylic
common area – emulsion paint with
100% low VOC
WINDOWS

Windows –
RAILINGS
Sliding/openable
CEILING FINISHES
Roof Terraces –
Ventilator –
Living, Bedroom, Kitchen, Parapet wall.
UPVC/aluminium/PVC
Deck/Utility – Putty with
Staircase – MS up to
acrylic premium Finish –
1050mm above floor
emulsion paint with low UPVC/aluminium
level.
VOC
Glass type – Single
glazing
KITCHEN AMENITIES

Sink – Single bowl with drain.

LIFT LOBBY: ALL Board – sincore/Nirali/Equivalent


FLOORS
Water Purifier – Provision in wiring &
Flooring, corridor – Plumbing
600x600mm Vitrified tile.
Lift Jambs – Granite Sink Cock – Jaquar/equivalent

Washing machine point in utility –


Provision in wiring & Plumbing
FLOORING
ENTRANCE
LOBBY: ALL Living, dining room,
FLOORS passage, bedroom, AC IN LIVING,
DINING AND
Flooring – Granite Kitchen – 600x600mm BEDROOMS
flooring vitrified tile
AC sleeve and
Lift Jambs – Granite Deck, toilets – provision in electrical
600x600mm vitrified wiring at unit .
Corridor – tile
600x600mm vitrified
tile. Utility – 300×300
Ceramic tile
THANKS
Does anyone have any questions?

Presented
By
Gopi.P

CREDITS: This presentation template was created by


Slidesgo, including icons by Flaticon, infographics &
images by Freepik

You might also like