Articles The purpose of generating this Method Statement is to
define the procedure step by step to implement the
EBter y0ur email correct practices for Installation of Diesel Generator
address & Click Join: Set through the guide line contained herein so as to
ensure that the job execution complies with the
requirements and serves the intended function to
satisfactory level.

TOOLS / EQUIPMENT :

Recent
Publications
SumpPump Of Statement
Installation Method
ÊIOOÉ Ë0I1tF0I Plan
https://safeworkmethodofstatement.com/method-statement-for-installation-of-diesel-generator-set/ 1/
9/13/21, 7:42 AM Method Statement For Installation of Diesel Generator Set
DMFing Pr0ject
Testing and
Csmmissioning
Site C0nstructisn
ÏrüÏÏlC Ë0I1tË0l
PrOCedlJre f0r Light
Veäicle 0perati08
Construction Site
Safety Committee
Meeting Procedure —
HSE Management
Method Statement Crane of suitable capacity & arrangement in line ydth
f0r Maj0r and Minor the Manufacturer's recommendations
Concrète Repair & and as required at site.
Filliny of Pinäoles • Forklift of suitable capacity
and Cracks • Chain Pulley Block
• Portable hand tools.
• Portable Drilling Machine/ Grinding Machine & Angle
Cutter.
• Spirit Level
• Crimping Tool

HANDLING & STORAGE OF DG SET:

On receipt of the Diesel Generator Set and accessories at


site, necessary precautions shall be taken for unloading,
shifting & storage, as follows:-
M Civil Metä0d • Material shall be stored in a covered / dry space at all
Statements (70) the time
• All materials received at site shall be inspected and
M Electrical M9tL0d ensured that the materials are as per approved
Statements (43] material submittal.
a Fire Fiyätiny • Any discrepancies, damage etc., found will be notified
Systems (14) and reported for further action.
• Site Engineer (Electrical) has to ensure that all
M HVAC Method Equipment used at site are free from any damage or
Statements (39) deformity of any kind. Any minor damages observed
shall be repaired suitably and in case if the repairs
Occvpatianal could not be done properly, the Equipment are to be
Health art Safety removed from site.
(16)
0iI & Gas SHIFTING THE UNITS FROM STORAGE YARD TO THE
Systems (8)
GENERATOR ROOM LOCATION
M Plumbing Metä0d
Statements (29) • After the activities under the general installation
procedures are completed the unit shall be loaded
M TecLnical Guides from the storage pIace,on the suitable traiIer,by the
(27) suitable loader Forklift or crane,to shift the respective
generator room location.
• The units shall be offloaded near the generator room
(Substation 1) north side,and shall be shifted on the
respective foundations by the suitable
loader(ForkIift)over the ramp ,which is being installed
to take units from outside to inside.
M Testify a • Proper care to secure units,whiIe above shifting
Csmmissi0fliflg (58) loading/unloading as well as placing shall be carried
out with at most care and precautions as required for
https://safeworkmethodofstatement.com/method-statement-for-installation-of-diesel-generator-set/ 2/
9/13/21, 7:42 AM Method Statement For Installation of Diesel Generator Set
out with at most care and precautions as required for
the sale operation.

Popular Tags
AV System CCTV ceramic
floor tiles Clean Agent
System
CommissionÎng
COMMISSIONING
PROCEDURE Electric
dater Heaters
excavation safe work
excavation york Fire
FigLtirg System Fire
Suppression System
Use management
procedure HVAC Method
Statement Installation
Installation Method
Statement installation INSTALLATION PROCEDURE FOR DIESEL GENERATOR
Procedure Lightning
Protection System • To carryout installation activities for diesel generator
Meth0d 0f below mentioned procedures are recommended to
follow-up step by step in sequential manner.
Statement • Pre delivery inspection shall be performed by the
meth0d system manufacturer's local dealer at dealer's facility
to ensure no damage is occurred in transit to all DG
statement •
Set components.
Prior to start installation, Site Engineer (Electrical)
Metfiod Statement For should ensure that approved shop drawinps related to
Testing & Commissioning the installation area are referred and that required
Prec0mmissi08Îng materials are available at site as per approved material
Precsmmissioning & submittals.
Csmmissioning Sale • Site Engineer (Electrical) has to ensure that all the
Method of Statement materials are received at site as per approved material
Safe M9tb0# submittal and verify the ratings.
Statement safe work • The name plate will be checked against equipment
data sheet to confirm conformity with the approval.
for exca t › sale • Material Inspection Request should be raised for
work method 0f material verification upon delivery at site.
• Ensure all civil works are completed for the area
st»tement Sale including floor paint to carryout the installation, and
¥/0rk Meth0d clearance is obtained from respective authorities to
Statement Sanitar› proceed further installation of DG set.
dares SMDB's • Installation procedures are to be followed as per
Specifications swimming
manufacturers recommendations.
• Installation works shall be carried out only with
pool civil Works swimming
pool method statement
respect to approved shop drawings of latest revision.
• Diesel Generator Set will be off loaded to the place
SWMS I nearest to the installation and protected properly from
dust & environment, etc.
C0mmissi0ning • Prior to installation, the foundation will be checked for
Testing & cleanliness and level.
Csmmissioning • Site Engineer has to ensure the orientation of DG set
Meth0ă Statement as per approved shop drawing Exhaust duct & fuel oil
Testing dfi pipe installation shall comply with the relevant clauses
Commissioning plug of specifications and as per manufacturer
Instd dtl0fl /gt/Od recommendation.
ToWer Crane FcundatloB • EF)Sure that the inSt0llation of Di "Sel Generator Set are
Upper Floor Call Frames carried out in accordance with manufacturer‘s and
a thoriț ‘s installation recommendations req irement
https://safeworkmethodofstatement.com/method-statement-for-installation-of-diesel-generator-set/ 3/
9/13/21, 7:42 AM Method Statement For Installation of Diesel Generator Set
UPS System UPSTesting authority's installation recommendations, requirement
Procedure Variable of applicable standards and in accordance with
Frequency Drives VESDA recognized industrial practices and specified in project
s stem working at height specification to ensure that installation complies with
Work Safe requirements.
• Alternator neutral terminal & Body shall be connected
with external earth as per approved shop drawing.
• Alternator control panel shall be connected as per
Meta approved shop
manufacturer recommendations
drawing and

• Cable connections between alternator, control panel


and Emergency Main Distribution Board shall be done
1 Entries feed as per approved shop drawing.
• From Emergency Main Distribution Board to other sub
1 C0mments feed emergency panels, Power Distribution work shall be
1 WordPress.org done as per approved shop drawing
• Installation of muffler, fuel supply system, exhaust
ducts, circuit breaker installation connections to BMS
and control wires shall be carried out as per approved
specifications.
• Pre & Post installation start up and commissioning at
site using available site load shall be performed in
coordination with the manufacturer's local dealer in
the presence of consultant representative as
appropriate.
• Detailed procedure shall be submitted for Testing
precommisioning and commissioning checks
for consultant‘s approval prior to commissioning of
genset. Applicable operating instruction, service
manuals, recommended spares shall be submitted in
O&M manual.
• Required power and control termination shall be
carried out as per approved drawings.
• DG Set Earthing shall be done as per authority
Regulation, specification and approved drawings.
• After inspection of DG Set proper care will be taken to
protect the unit from dust by suitable covering, and
shall further be released for the Testing work.

ATTACHMENTS
• Risk Assessment
• Inspection and test plan
• Quality control procedure
• Check Sheets

Share this method statement:


https://safeworkmethodofstatement.com/method-statement-for-installation-of-diesel-generator-set/ 4/
Facebook |@ Linkedln WhatsApp

Like this:

Like
Be the first to like this.

M et1 ccl Metlsocl Met a act

All Rights Reserved. Safew0rk MetL06 0f Statement. Serving C0nstructi0fl IndvstFy Since 10 years.

You might also like