PANEL ERECTION PROCEDURE


· PRECAST PANEL LOADED ON A FRAME TRAILER. STAGE-1
CRANE
TILTING
HOOK

4 LEG CHAIN 3M

SNATCH BLOCK
DOUBLE PULLY
(12 TON)

FREE SLING (10 TON)


10 METERS
6660
700 2000 1280 2000 680
PANEL

TON-9.00

TUNBER

PANEL ERECTION PROCEDURE


· CONNECT THE CRANE TO THE PRECAST PANEL STAGE-2
6660
700 2000 1280 2000 680

TON-9.00

CRANE - 1

PANEL ERECTION PROCEDURE GROUND

· LIFT PRECAST PANEL FROM THE TRAILER. STAGE-3


6660
700 2000 1280 2000 680

TON-9.00

TEMPORARY FIXING

PANEL ERECTION PROCEDURE


· INSTALL PRECAST PANEL TO STAGE-4
PRECAST FOUNDATION
6660
700 2000 1280 2000 680

TON-9.00

TEMPORARY FIXING

GROUND

ELEVATION STAGE-5