System : BOILER SYSTEM Remark :


Equipment Name : STEAM DRUM
Equipment KKS

MPI Number
FMEA Date (Orig) : 19 Mei 2020 (Rev00)

Mode Kerusakan Dampak Kerusakan Penyebab kerusakan (FDT) Failure Defense Task / Frekuensi
Equipment Sub Equipment No. FDT PIC
(Failure Mode) (Failure Effect) (Failure Cause) TINDAKAN SAAT INI Recommendation FDT
- VISUAL CEK
SATURASI OKSIGEN SELAMA - VISUAL CEK OH MECH
- NDT (BORECSOPE, PT)
PITTING KOROSI, OKSIDASI CRACK, BOCOR PROSES SHUT DOWN / - THERMOGRAPHY 1W 2,3 ENJ
- KONTROL PARAMETER
COOLING PROCESS - PATROL CEK DAILY OPERASI
OPERASI
- VISUAL CEK
- THERMOGRAPHY - VISUAL CEK
EKSPANSI PANAS TINGGI OH MECH
- PATROL CEK - NDT (BORECSOPE, PT)
BODY THERMAL FATIGUE PECAH, BOCOR AKIBAT TERLALU SERING 1W 2,3,10 ENJ
MEMASTIKAN DIFERENSIAL - KONTROL PARAMETER
SIKLUS FORCED COOLING DAILY OPERASI
TEMPERATUR ANTAR UPPER- OPERASI
LOWER METAL DRUM < 50C
- VISUAL CEK
- STRESS PADA SAMBUNGAN - VISUAL CEK OH
- NDT (BORECSOPE, PT)
METAL WELD CRACK, PECAH, BOCOR LAS - THERMOGRAPHY 1W 2,3,10 OPERASI
- KONTROL PARAMETER
- CACAT FABRIKASI - PATROL CEK DAILY
OPERASI
- PATROL CEK
TIDAK DAPAT DILAKUKAN OPERASI
LEVEL INDIKATOR BOCOR KERUSAKAN PACKING SEAT - VISUAL CEK - PENGGANTIAN PACKING OH 5,9
LEVELING MECH
- MENUTUP VALVE

STEAM DRUM - MONITORING & PENGATURAN :- VISUAL CEK


KOROSI, DEFECT MECHANICAL - KERUSAKAN &/ CRACK INNER - KONTAMINAN AIR
INNER PART INJEKSI KIMIA - CLEANING OH 1,2,7 MECH
DAMAGE PART - LIFE TIME
- VISUAL CEK - PERBAIKAN / PENGGANTIAN

- PATROL CEK OPERASI


KOROSI TERJADI KEBOCORAN KOROSI - PERBAIKAN MANHOLE OH 4,9
- THERMOGRAPHY MECH
MANHOLE
- PATROL CEK OPERASI
KERUSAKAN PACKING TERJADI KEBOCORAN KERUSAKAN PACKING - PENGGANTIAN GLAND SEAL OH 4,9
- THERMOGRAPHY MECH

- KOROSI AKIBAT AIR HUJAN - PATROL CEK - 'PERBAIKAN INSULASI 1W MECH


KERUSAKAN INSULASI MECHANICAL DAMAGE 8,9
- SAFETY - THERMOGRAPHY - PENGGANTIAN INSULASI OH ENJ

- KOTORAN / KERAK
DOWNCOMER - VISUAL CEK
MENYUMBAT - PATROL CEK
- FLOW WATER TIDAK LANCAR - NDT (BORECSOPE, PT) MECH
- KOTORAN BEKAS PERBAIKAN - KONTROL PARAMETER
LOWER HEADER TERSUMBAT - KERUSAKAN TUBE - CLEANING OH 6,7,8,9 ENJ
(WELDING / GRINDING / OPERASI (STEAM FLOW,
WATERWALL - KONTROL PARAMETER OPERASI
PENGGANTIAN PART) WATER LEVEL)
OPERASI
MENYUMBAT

Sidoarjo, 28 Mei 2020


Disusun, Diperiksa Disetujui,

Fanny Eka Candra Yogo Wijayanto Hilman Aziz Tamimi


CA Mekanik Asman Enjiniring Performace Manajer Enjiniring Performance
PT PEMBANGKITAN JAWA BALI SEVICES No. Dokumen : FM-KP-4.1.5.02
SIAP INTEGRATED MANAGEMENT SYSTEM Revisi : 01
Tanggal Terbit : 15-03-2017
Failure Modes and Effects Analysis (FMEA) dan Task Execution
Halaman : 1 dari 1
Equipment Name : : Steam Drum
Equipment KKS : : (Sesuai Data Unit)
No. Pencegahan/
Frekuensi PIC Job Instruction Material Tools Man x Hours Post Maintenance Test
FDT Penyelesaian

1 PERBAIKAN & OH MECH - VISUAL CEK - SPARE PART - SENTER 2x8 INNER PART TIDAK ADA
PENGGANTIAN INNER - CLEANING - KAWAT LAS - MAJUN KERUSAKAN
PART - PENGGANTIAN PART RUSAK - SIKAT BAJA
- KUNCI PAS
- OBENG
- MESIN LAS

2 PEMERIKSAAN BODY OH MECH - VISUAL CEK - DYE PENETRANT SET - SENTER 2x8 MEMASTIKAN TIDAK CRACK
ENJ - NDT (PT, BORESCOPE, MT) - MAJUN PADA BODY & SAMBUNGAN LAS,
- SIKAT BAJA TIDAK ADA CACAT DEFECT
- TOOL BORESCOPE
- TOOL MT

3 PERBAIKAN BODY OH MECH - PENGELASAN BODY - KAWAT LAS - MESIN LAS 2x2 MEMASTIKAN TIDAK CRACK
- SIKAT BAJA PADA BODY & SAMBUNGAN LAS,
- MAJUN TIDAK ADA CACAT DEFECT

4 PERBAIKAN MANHOLE OH MECH - PERBAIKAN MANHOLE - KAWAT LAS - SIKAT KAWAT 2x4 TIDAK ADA KEBOCORAN DARI
- PENGGANTIAN GASKET - BATU GERINDA - MESIN LAS MANHOLE/TERTUTUP RAPAT
- SPARE GASKET - MESIN GERINDA
- KUNCI PAS

5 PENGGANTIAN PACKING OH, MECH PENGGANTIAN PACKING SEAT - SPARE PACKING SEAT - KUNCI PAS 2x2 LEVEL INDICATOR TIDAKADA
SEAT LEVEL INDICATOR SESUAI - OBENG KEBOCORAN & DAPAT TERBACA
KEBUTUHAN - TANG DENGAN NORMAL

6 PEMBERSIHAN PIPA OH MECH - VISUAL CEK - BATU GERINDA - MESIN GERINDA 2x8 PADA PIPA & HEADER TIDAK
DOWNCOMER & LOWER - PEMOTONGAN PIPA - KAWAT LAS POTONG TERJADI KEBUNTUAN
HEADER - CLEANING - MESIN LAS
- SENTER
- MAJUN

7 PEMERIKSAAN INNER OH MECH - VISUAL CEK - BATU GERINDA - TOOL BORESCOPE 2x4 MEMASTIKAN TIDAK ADA
PART, PIPA DOWNCOMER, ENJ - PEMOTONGAN PIPA (JIKA - KAWAT LAS - MESIN GERINDA KERUSAKAN SUMBATAN
LOWER HEADER DIBUTUHKAN) POTONG KOTORAN / BENDA ASING, TIDAK
- CLEANING - MESIN LAS ADA KERUSAKAN INNER PART &
- SENTER INNER DIAMETER PIPA
- MAJUN
No. Pencegahan/
Frekuensi PIC Job Instruction Material Tools Man x Hours Post Maintenance Test
FDT Penyelesaian
8 PERBAIKAN INSULASI OH, MECH PERBAIKAN / PENGGANTIAN - GLASSWOOL - RIVET 4x2 TIDAK ADA KERUSAKAN
SESUAI INSULASI - PLAT INSULASI - PALU INSULASI
KEBUTUHAN - BAUT RIVET
- KAWAT BAJA
- PAKU BAJA

9 THERMOGRAPHY 1W ENJ MONITORING TEMPERATUR BODY & NA TOOL 1x1 MONITORING KEBOCORAN
INSULASI THERMOGRAPHY BODY, INSULASI & PIPA
PT PEMBANGKITAN JAWA BALI SEVICES No. Dokumen :
SIAP INTEGRATED MANAGEMENT SYSTEM Revisi :
Tanggal Terbit :
Failure Modes and Effects Analysis (FMEA) dan Task Execution
Halaman :
Acara : Workshop FMEA Steam Drum
Hari / Tanggal : Selasa/ 19 Mei 2020
Waktu (WIB) : 14.30 WIB - Selesai