You are on page 1of 3

MODULE TITLE: PROJECT MANAGEMENT AND REAL ESTATE 31ST BATCH(10TH SEMESTER)

MODULE CODE: IAR 4125 REZWANA CHOWDHURY


ID:173021013

DREAM PROJECT-DESIGNING BISTRO’S AT DIFFERENT HISTORICAL PLACES OF BANGLADESH


DESIGNING A BISTRO MIGHT LOOK A SIMPLE WISH BUT NOT IN THIS CASE. THERE ARE MANY HISTORICAL PLACES IN OUR COUNTRY AND PEOPLE
LOVE TO VISIT THESE PLACES. I WANT TO WORK ON PRESERVATION AND CONSERVATION OF THOSE PLACES AND BUILT A BISTRO AT EVERY
HISTORICAL PLACE WHICH REPRESENT THE HISTORY OF THOSE PLACE ITSELF. TO FULFILL THIS PROJECT NEED TO SUBMIT A PROPOSAL TO
GOVERNMENT.

PROJECT INITIATION
KNOWING ABOUT HISTORY IS IMPORTANT FOR OUR FUTURE GENERATION. I BELIEVE WITH THIS PROJECT PEOPLE WOULD GOT TO LEARN ABOUT IT
AS WELL AS WE WOULD BE ABLE TO PRESERVE OUR PAST. BESIDE THIS THE TOURIST WOULD BE ABLE TO ENJOY A GREAT MEAL.
THERE ARE DIFFERENT RESTAURANTS IN HISTORICAL PLACES WORLDWIDE. EXAMPLE- AMERICANA COCKTAILS IN A BARREL, LOS ANGELES,
CALIFORNIA; SOUTHERN CUISINE IN A 200 YEARS OLD SHOE STORE, GREENVILLE, SOUTH CAROLINA; WINE PAIRED WITH VINEYARD VIEWS ON AN
ANTIQUE TRAIN, NAPA VALLEY, CALIFORNIA; ART MEETS FARM TO TABLE IN AN OLD ENGINE SUPPLY BUILDING, COLUMBIA, SOUTH CAROLINA;
CRAFT BEER IN AN OLD FUNERAL HOME, MANSFIELD, OHIO; CONTEMPORARY FRENCH FOOD IN CHARLIE CHAPLIN’S STUDIO, LOS ANGELES,
CALIFORNIA; RESTAURANT IN A 100 YEARS OLD POLICE STATION, SAN DIEGO ETC. SO IT MIGHT BE DIFFICULT BUT NOT IMPOSSIBLE TO FULLFILL THIS
DREAM PROJECT.
TO EXECUTE THIS PROJECT NEED TO CREATE A PROPER TEAM UNDER ARCHITECTURAL AND DESIGNING FIRM. FOR THIS PROJECT WE NEED TO BUILD
A TEAM WITH ARCHITECT, ARCHAEOLOGIST, INTERIOR DESIGNER, CIVIL ENGINEER, CONTRACTOR AND OTHER MANAGEMENT TEAM MEMBERS AND
SUPPORT STUFFS. AT FIRST OUR TARGET PLACES WOULD BE IN THE CAPITAL AND NEAR CAPITAL. AND AFTER SUCCESS WE WOULD DROVE ACROSS
THE COUNTRY. SO THIS FIRM SHOULD BE LOCATED AT THE CAPITAL AND NEED TO BUILD TEMPORARY SITE OFFICE WHICH WOULD BE LOCATED AT THE
SITE.
THEN NEED TO REVIEW ALL THE INITATION PHASES AND A CONTINUOUS MONITORING IS IMPORTANT.
PROJECT PLANNING
NEED TO CREATE A PROCESS MAP AND OUTLINEING THE PROJECT SCHEDULE AND BUDGET TO MAKE SUCCESSFUL THE PROJECT.
THE TARGET CUSTOMER FOR THIS PROJECT WOULD BE THE MIDDLE CLASS AND UPPER CLASS PEOPLE WHO LOVE TO TRAVEL. THE PEOPLE WHO HAS
A GREAT INTEREST ON HISTORY AND CULTURE. AND THE BUDGET WOULD BE ACCORDING TO THAT.
ANALYSING ALL THE MATERIALS AND AVAILABLE RESOURCES ARE IMPORTANT FOR THIS PROJECT. NEED A GOOD RESEARCH ON THE HISTORICAL
BUILDING AND THE PURPOSE OF THE BUILDING, STUDY OF BUILDING MATERIALS AND STUDING THE HISTORY BEHIND IT AND THE STUDY OF
CULTURE IS VERY IMPORTANT TO EXECUTE THE PROJECT. INVOLVEMENT OF EVERY TEAM MEMBER IS VERY IMPORTANT.
RISK MANAGEMENT IS NECESSARY. THERE COULD BE DIFFERENT RISK TO FULLFILL THIS PROJECT. LIKE NOT FINDING THE ACTUAL MATERIAL FOR THE
PROJECT. IN THAT CASE WE HAVE TO CREATE SIMILLAR MATERIAL WHICH WOULD GO WITH THE PROJECT AND ALSO WOULD NOT LOWER THE
VALUE.
WORKING WITH OLD HISTORIC BUILDING IS ALSO A SENSITIVE ISSUE. SO HANDLING THIS PROJECT WOULD NOT BE EASY GOING. ONLY
DETERMINATION AND HARDWORKING CAN MAKE THIS PROJECT SUCCESSFUL.

EXECUTION
TO EXECUTE THIS PROJECT DISTRIBUTING ALL THE INFORMATIONS AMONG THE TEAM IS IMPORTANT. THERE IS ONE IMPORTANT STRATEGY TO
FULFILL THIS PROJECT IS THAT EVERYONE IN THE TEAM WORK WITH A COMMON GOAL.
FIRST OF ALL THE ARCHAEOLOGIST WOULD STUDY THE MATERIALS AND OTHER HISTORICAL DETAILS TO THE ARCHITECT. THEN THE
ARCHITECTWOULD WORK WITH THE ARCHITECTURAL ASPECTS OF THE DEVELOPMENT OF THE DESIGN, PRODUCTION OF THE CONSTRUCTION
DOCUMENTS (PLANS), AND SPECIFICATIONS AND THE CIVIL ENGINEED WOULD WORK WITH STRUCTURAL SITE OF THE HISTORICAL BUILDING. THE,
THE CONTRACTORS RESPONSIBILITIES MAY INCLUDE APPLYING FOR BUILDING PERMITS, ADVISING THE PERSON THEY ARE HIRED BY, SECURING THE
PROPERTY, PROVIDING TEMPORARY UTILITIES ON SITE, MANAGING PERSONNEL ON SITE, PROVIDING SITE SURVEYING AND ENGINEERING,
DISPOSING OR RECYCLING OF CONSTRUCTION WASTE, MONITORING SCHEDULES, THE INTERIOR ARCHITECT WOULD WORK WITH INTERIOR SPACES
AS WELL AS THE FURNISHING FOR THAT THEY HAVE TO STUDY ABOUT THE HISTORICAL PLACES AND THE MATERIALS HAD BEEN USED IN THE PAST.
OTHER STAFF ALSO NEED TO KNOW WHAT THEY HAVE TO DO AND THE INSTRUCTIONS WOULD BE GIVEN BY THE MANAGEMENT TEAM.
WITHOUT THEIR INVOLEMENT THIS PROJECT WOULD NEVER BE FULFILLED SO IT HAS TO BE EVERYONES DREAM PROJECT WHOEVER WORKING ON
THE TEAM. NEED TO CREATE A GANTT CHART TO SEE THE SCHEDULE.
MONITORING AND CONTROLLING
MONITORING ALL THE TEAM MEMBERS IS IMPORTANT. ALL MEMBERS NEED TO FOLLOW THE SCHEDULE AND WORK ACCORDING TO THAT. SO IT IS
VERY IMPORTANT TO SUCCESSFUL THE PROJECT IN TIME. IN EVERY TEAM THERE WOULD BE A HEAD OF THE TEAM WHO WOULD MONITOR THE
TEAM INDIVIDUALLY AND ALSO CHECK ALL THE PROJECT STATUS AND DOCUMENTS IN TIME. INTERIOR ARCHITECT WOULD VISIT THE SITE
FREQUENTLY TO MONITOR ALL THE WORK. A TRUSTABLE CONTRACTOR IS VERY MUCH IMPORTANT FOR THIS PROJECT.

CLOSING
AT THE END AFTER THE PAPER WORK WOULD BE DONE NEED TO COMPARE THE PROJECT WITH THE BEGINNING LEVEL PLANNING. ENSURING THE
PROPER CLOSURE OF ALL PROJECT WORK IS NECESSARY. RECEIVING CUSTOMER(GOVERNMENT) APPROVAL IS IMPORTANT. AND AFTER THAT
LEARNING FROM THE PROJECT WOULD BE THE NEW BEGINNING.

You might also like