PROJECT: SOLAR POWER COMFORT ROOM AND SHOWER FACILITIES IN BAYWALK (2 LOTS) MANILA

BAY, MANILA CITY


lot 1 (near padre faura/embassy)
PERT / CPM PROJECT DURATION = 120 CALENDAR DAYS
electrical works solar panel
22 23
25CD 25CD
plumbing pipe fixtures
plastering
septic tank catch basin chb wall 10
5 9
2CD 4CD 4CD 6CD 6CD
stainless steel grab bar
soil poisoning
damp proofing railings tubular steel framing roof framing roofing sheet
foundation fill
11
4 8 12
4CD 6CD 6CD
2CD 25CD
8CD wpc flutted wood grain
fiber cement board wall
cladding 14 panel
4CD 6CD
structures excavation(soft soil) reinf stee grade 40 (min structural concrete class A (min
Mob. granite tiles Demob.
struc.) struc.)
25
6 7 13 24
1 2
2CD
12CD 25CD 20CD 25CD
2CD
clearing/grub. painting works
demo. works emabankment (sel. borr) ceiling works concrete wall
3
10CD 224CD 15
d2(0.90x2.10m) solid 4CD 6CD
d1(1.00x2.10m) solid core core panel door d3(1.80x2.10m) solid d4(1.00x2.10m) solid
panel door core panel door core panel door w/ licl
16 17
4CD 6CD 10CD plate
aluminum awning transom glass mirror/furniture/access
windows 18
cubicle partion
19ories
50CD 45CD 10CD
vertical pocket garden paving blocks led acrylic signage
20 21
25CD 25CD 25CD

Construction and Safety Health

120CD

PROJECT DURATION = 120 CALENDAR DAYS


Submitted by:

PETT BUILDERS
Contractor

73
Scaffolding for Riprapping
Construction
Structure Excavation of Field
(adobe)
Office/ Bodega
RCHandling
Double Manhole for 910mmØ RCPC
of Const.
(36"Ø)
Mat. for Riprapping

12CD

Const. of Safety & Health Conc. Cover for CHB


Pipe88CD Sidewalk Line
Culvert & Drain Excavation
CHB Lined
Canal
Conc. Curb &(100mm (per
thk)m strip, t=0.10m)
2

Canal (H=1.0m)
Crushed
RC Manhole
gutter Type "A" for
7CD 910mm
pipe culvert dia. (36"Ø)
910mmØ
(cast
Aggregate RCPC (36"Ø
in Base
place)
Nat. Road
2CD Coarse
8CD
(Foundation Fill)
RC Manhole for RC Manhole
8CD dia
910mm 1220mm dia
RCPC (36"dia) (48"dia) Conc. Curb & Gutter Type "A"
(cast in place) Nat. Road

Conc, Driveway Conc. Flooring for CHB Lined Canal (t=0.10m) Non Reinforced
(t=0.15m)
14
12CD
Agg. BasePCC Pav't. (plain)
Pipe Culverts for 910mm dia RCPC (36"dia)
Course Conv. Method, Sidewalk
230mm thk
Agg.
Grouted Riprap
(100mm thk) (Class A)
(3,500
RC Base
psi,
Manhole for Rem. Of Extg.
Foundation Fill (t=0.10m)
Green Gence Wiremesh 28days
1070mmØ Coarse
RCPC Pav't.
(3m x 2m) 7 (t=0.23m)
(42"Ø
10

6
13
Dewatering

PCC Agg.
Pavement 9 Sub-
Billboards / Informative Sign Base
Coarse
Agg.
9 Sub-
Base
Coarse
20CD

RC Manhole for 610mmØ RCPC (24"Ø)


Dredging by Labor Intensive Including
Hauling / Disposal of Spoils
PROJECT: SOLAR POWERED COMFORT ROOMS AND SHOWER FACILITIES IN BAYWALK (2 LOTS)
MANILA BAY, MANILA CITY
lot 1 (near padre faura/embassy) lot 2 (near estero de san antonio de abad)
PERT / CPM PROJECT DURATION = 120 CALENDAR DAYS
electrical works
solar panel
22 23
clearing/grub. demo. emabankment (sel. borr) 10CD 10CD
works septic tank catch basin plumbing pipe fixtures plastering
chb wall 10
5 8 8 9
2CD 4CD 4CD 4CD 6CD 6CD
4CD
stainless steel grab bar
railings tubular steel framing roof framing roofing sheet
soil poisoning foundation fill
damp proofing 11
4 8 12
4CD 6CD 6CD
2CD 2CD 8CD fiber cement board wall wpc flutted wood grain
cladding 14 panel
4CD 6CD
reinf stee grade 40 (min struc.)
structural concrete class A (min Demob.
Mob. structures excavation(soft soil) granite tiles
struc.)
25 26
1 2 6 7 13
40CD 51CD 2CD
15CD 10CD
2CD
const. of field office/bodega & billboard/signages painting works
engr's facailities ceiling works concrete wall
3
6CD 15
2CD d2(0.90x2.10m) 4CD 6CD
d3(1.80x2.10m)
d1(1.00x2.10m) solid core solid core panel solid core panel d4(1.00x2.10m) solid
panel door door door core panel door w/ licl
16 17
4CD 6CD 4CD
plate
aluminum awning transom glass mirror/furniture/access
windows cubicle partion
18 19ories
50CD 10CD 4CD
vertical pocket garden paving blocks led acrylic signage
20 21
10CD 8CD 4CD
electric connection 24 water connection
2CD 2CD
Construction and Safety Health

120CD

PROJECT DURATION = 120 CALENDAR DAYS


Submitted by:
2 15 10 40 51 2 120
PETT BUILDERS
Contractor
73
Scaffolding for Riprapping
Construction
Structure Excavation of Field
(adobe)
Office/ Bodega
RCHandling
Double Manhole for 910mmØ RCPC
of Const.
(36"Ø)
Mat. for Riprapping

12CD

Const. of Safety & Health Conc. Cover for CHB


Pipe88CD
Culvert & Drain Excavation
Sidewalk Line Canal
CHB Lined (per
thk)m strip, t=0.10m)
2
Conc. Curb &(100mm
Canal (H=1.0m)
Crushed
RC Manhole
gutter Type "A" for
7CD
pipe culvert 910mm dia. (36"Ø)
910mmØ
(cast
Aggregate RCPC (36"Ø
in Base
place)
Nat. Road
2CD Coarse
8CD
(Foundation Fill)
RC Manhole for RC Manhole
8CD dia
910mm 1220mm dia
RCPC (36"dia) (48"dia) Conc. Curb & Gutter Type "A"
(cast in place) Nat. Road

Conc, Driveway Conc. Flooring for CHB Lined Canal (t=0.10m) Non Reinforced
(t=0.15m)
14
12CD
Agg. BasePCC Pav't. (plain)
Pipe Culverts for 910mm dia RCPC (36"dia)
Course Conv. Method, Sidewalk
230mm thk
Agg.
Grouted Riprap
(100mm thk) (Class A)
(3,500
RC Base for
psi,
Manhole Rem. Of Extg.
Foundation Fill (t=0.10m)
Green Gence Wiremesh 28days
1070mmØ Coarse
RCPC Pav't.
(3m x 2m) 7 (t=0.23m)
(42"Ø
10

6
13
Dewatering

9 Agg.
Billboards / Informative Sign Sub-
20CD Base
Coarse
RC Manhole for 610mmØ RCPC (24"Ø)
Dredging by Labor Intensive Including
Hauling / Disposal of Spoils
PROJECT: DREDGING OF MARICABAN CREEK, PASAY CITY

PERT / CPM

PROJECT DURATION = 120 CALENDAR DAYS

FIELD OFFICE / BODEGA AND


DREDGING BY EQUIPMENT INCLUDING HAULING AND
ENGINEER'S FACILITIES / Demob.
Mob. TOOLS
DISPOSAL OF SPOILS
6
4 5
1 2
2CD
2CD 5CD 111CD

billboard/signag
es 2 5 111 2 120
3
2CD
2 5 36 135 2 180

CONSTRUCTION SAFETY AND HEALTH

120CD

Submitted by:

PETT BUILDERS
Contractor
7
DRAINAGE IMPROVEMENT ALONG BULELAK ST., AND VICINITY BRGY. MALANDAY, MARIKINA
CITY, DISTRICT I

PERT / CPM
Construction of Additional
Drainage Main Manhole w/ Desilting of Drainage
Rem. Of Exstng. Beam, Wall, Nosing and Main Including Disposal of
Rem. Of Curb & Cutting of Concrete Conc. Pavm't. Breaking of RCBC Spoils
Manhole Cover
Gutter Pav't. (t=0.23m) Wall
5 6 10 11
4CD 3CD 6CD 30CD 25CD
3CD

Rem. Of Exstng. Top Slab of


Drainage Main Pipe Culverts 610mm Ø(24"Ø) Demob.
Mob.
1 2 7 12 13
2CD 18CD 68CD 2CD
15CD

PCC Pav't. (plain) Conv. Construction of catch Basin


Agg. Sub Base Agg. Base Method, 300mm thk
Construction of Field Billboard/ Signages Barricades C.I. (Hinged Type)
Coarse Coarse (3,500 psi, 7days
Office/ Bodega (wood)

3 4 8 9
2CD 4CD 4CD 10CD 10CD 18CD

PROJECT DURATION = 90 CALENDAR DAYS

RANNY RAYMOND N. NUÑEZ


RNN CONSTRUCTION CORP.
7

Structure Excavation (soft soil)


Rubble Concrete Barricade (woods)
Reinforcing Steel Bar Grade 40 (Minor Crush Aggregate Base Structure Concrete Class A
Plaster (Class B 25mm thk) Structures) Course (Foundation Fill) (Minor Structures)
18CD

Dewatering
Bamboo Pole Piling
REHABILITATION OF DRAINAGE MANHOLES AND INSTALLATION OF STEEL GRA
AND INLETS ALONG SOUTH SUPER HIGHWAY AND VICINITY, DISTRICT

PERT / CPM

Steel grating manhole


rem. of ex'tng. rem. of curb & rem. of cover 24"Ø RCCP
pav'mnt (t=0.23m) gutter sidewalk (1.80x0.70)
5
2CD 4CD 4CD

billboard/ reinforcing steel bars grade 40


cutting of conc. barricade
signages (minor structures)
pav'mnt woods
3 13

2CD 8CD
4CD

Construntion of structural concrete class A


Mob. Field pipe culvert & drain dredging by labor intensive including
Office/Bodega excavation hauling/dis. of spoils
1 2 4 7 10
4CD 12CD 25CD 20CD
2CD

sandbagging dewatering
6
224CD
10CD
agg sub base
foundation fill coarse
11
4CD 6CD
traffic management
8 9
50CD

Construction and Safety Health

25CD

PROJECT DURATION
Submitted by:

CEFERINO B. GARAY JR.


C.B. GARAY PHILWIDE BUILDERS

45CD

6
2CD 2CD 2CD 17CD
3
Barricades
(woods)
11CD 11CD

Const. of Field Billboard Barricades


Office/Bodega /Signages Woods
Bit. Tack Coat
(emulsified asphalt)
Bit. Tack Coat
RC Manhole for 760mm (emulsified asphalt)
3 4 dia. RCPC (30"Ø)

12 13
Pipe Culvert & Drain Pipe Culverts, 760mm dia.
Excavation RCPC (30"Ø) 2CD

Conc. Curb & gutter Type


Cutting of Conc. Pavm'nt Rem of Sidewalk "A" (cast in place) Nat.
Dewatering Agg. Base Road
Sandbagging
Course

Rem. of Extg. Rem of Curb & Rem of Ext'ng Pavm'nt


Conc. Gutter (t0.23mm thk)
Inlet with
Pavt. Cleaning of Culvert Pipe in Place (760mmØ (half Silted) Steel grating

Cutting of
Concrete Drainage Exc.
(Uns.) Pipe Culvert 760mmØ RCCP
Pavement

Rem. of
Billboard/ Rem. of extg.
Curb & Dewatering Inlet With Steel Grating
Signages Asphalt Pavt.
Gutter
N OF STEEL GRATING MANHOLE COVERS Scaffolding
Construction of for Riprapping
Field
CINITY, DISTRICT I, MAKATI CITY Structure Excavation (adobe)
Office/ Bodega
RCHandling
Double Manhole for 910mmØ RCPC
of Const.
(36"Ø)
Mat. for Riprapping

5
Steel grating
el grating manhole steel grating MH manhole cover for
er 24"Ø RCCP cover for lined faraday drainage 12CD
0x0.70) canal (0.60x0.60) main (1.80x0.70)
15 16
Const. of Safety & Health Conc. Cover for CHB
6CD 6CD
Pipe88CD
Culvert & Drain Excavation
Sidewalk Line Canal
rc manhole for rc manhole for CHB Lined (per m2 strip, t=0.10m)
910mm dia. Conc. Curb &(100mm thk)
610mm dia. rcpc CanalRC(H=1.0m)
Crushed
gutter Manhole
Type "A" for
17 rcpc (36"Ø)
18 (24"Ø) 7CD 910mm
pipe culvert dia. (36"Ø)
910mmØ
(cast
Aggregate RCPC (36"Ø
in Base
place)
6CD 6CD
Nat. Road
conc. curb &
rc manhole cover for 24"Ø 2CD Coarse
gutter type A
19 rccp (1.30x0.70x0.20)
8CD
(Foundation Fill)
cast in place
Nat. Road 4CD roadway 6CD RC Manhole for RC Manhole
8CD dia
910mm 1220mm dia
structural concrete class A rc manhole for 2-24"Ø Demob. RCPC (36"dia) (48"dia) Conc. Curb & Gutter Type "A
rccp 23 (cast in place) Nat. Road
14 22
2CD
20CD 25CD Conc, Driveway Conc. Flooring for CHB Lined Canal (t=0.10m) Non Reinfo
(t=0.15m)
breaking / rem. of 14
manhole wall at
sidewalk 12CD
100mm thk Agg. BasePCC Pav't. (plain)
tapping point Pipe Culverts for 910mm dia RCPC (36"dia)
20 Course Conv. Method, Sidewalk
4CD 6CD 230mm thk
Agg.
Grouted Riprap
(100mm thk) (Class A)
agg sub base agg base coarse pcc pav'mnt plain conv. (3,500
RC Base for
psi,
Manhole Rem. Of Extg.
Foundation Fill (t=0.10m)
Green Gence Wiremesh
coarse method 230mm
(3m x 2m)
28days
1070mmØ Coarse
RCPC 7 Pav't.
12 thk(3500psi 7 days) (t=0.23m)
10 (42"Ø
6CD 10CD cleaning culvert pipe in
lighting facilities place (610mm dia. half
21silted
45CD 10CD

6
13
Dewatering

PCC Agg.
Pavement 9 Sub-
ROJECT DURATION = 90 CALENDAR DAYS Billboards / Informative Sign Base
Coarse
20CD

RC Manhole for 610mmØ RCPC (24"Ø)


Dredging by Labor Intensive Including
Hauling / Disposal of Spoils

Pipe Culverts, 610mmØ (24"Ø)

8
6 conc. curb & gutter type A cast
in place Nat. Road

conc. curb & gutter type A cast


in place Nat. Road
PCCP Pavement (plain) Agg. Sub BAse
Conv. Method 230mm thkCoarse (t=0.15m)
(3500 psi, 28days)
Bit. Tack Coat Lean Concrete Class "A" (1:2:4)
Bit. Conc. Surface
(emulsified asphalt)
Course
Bit. Tack Coat Lean Concrete Class "A" (1:2:4)
Bit. Conc. Surface
(emulsified asphalt) Pipe Culverts
Course
1070mmØ (42"Ø)
Pipe Culverts
13 14 910mmØ (36"Ø)
CIM for 610mm dia. RCPC
3CD(24"Ø) 4CD

Conc. Curb & gutter Type PCC Pavm'nt (Plain) Conv.


"A" (cast in place) Nat. Method 23mm thk
Road (3500psi, 7 days)

Sidewalk
Inlet with
(100mm thk)
Steel grating

Conc. Curb
Manhole 760mmØ & Gutter
RCPC

Bit Conc. Pavement


Surface Marking
Coarse (white)
Conc. Curb & Gutter Type "A"
(cast in place) Nat. Road

ed Canal (t=0.10m) Non Reinforced