1. SCOPE
This Coating Data Sheet covers shop coating requirements for the application of Coating System U3 and
supplements the requirements of the Industry Standards referenced below.

2. APPLICATION

This coating system is intended for miscellaneous underground onsite piping as specified in project documents
or drawings. Pipe shall preferably be quoted with fusion bond epoxy. All fittings NPS 8 and larger shall be
coated with the liquid epoxy coating. Hold-back of coating from ends of pipe and fittings shall be 75 mm.

3. COATING SYSTEM

3.1 Fusion Bond Epoxy

Surface Preparation Surface preparation shall be per NACE Standard RP0394.


Coat Application DFT (microns) Shop (S)
Generic Coating Type Color
No Method * Nominal Min Max Field (F)
Fusion Bond Epoxy per NACE
1 Standard RP0394 or approved Spray 500 400 600 Shop Mfr Std
International Standard Note [1]
Total DFT 500 400 600
General Notes:
Note [1] FBE shall be shall be DuPont Nap-Gard Mark X Product No.7-2501 or approved equivalent.

3.2 Alternate System 100% Solids Liquid Epoxy Coating

Surface Surface preparation shall be per AWWA C210, anchor profile shall be 75 to125 µm.
Preparation
Coat Application DFT (microns) Shop(S)
Generic Coating Type Color
No Method * Nominal Min Max Field(F)
100% Solids Epoxy per AWWA C210 or
1 approved International Standard Note Spray 500 400 750 Shop Mfr Std
[1]
Total DFT 500 400 750
General Note:
Note [1] Coating shall be Industrial Enviromental Coatings Enviroline 376-F-30 or approved equivalent.

4. COATING MATERIALS

Technical data sheets of proposed coating materials shall be submitted to KBC for review and approval.

5. SHOP REPAIR PROCEDURES

Shop repair of damaged and non-compliant coatings shall be in accordance with NACE Standard RP0394,
AWWA C210 or approved international standard as appropriate.

Rev. Prepared By Reviewed By Approved By


Date
No. Discipline Engineering Project
Engineer Manager Engineer / Manager
0 29 Jan 01 R. Rood D. Brzezinski M. Jones
ESSO EXPLORATION &
PRODUCTION CHAD INC.
ECS 19-1-1-1M
COATING SYSTEM U3
COATINGS FOR MISCELLANEOUS U/G
ONSITE APPLICATIONS Page 2 of 2

COATING DATA SHEET Rev. 0 JAN 2001

6. FIELD REPAIR

6.1 Repairs in Field Fabrication and/or Paint Shop

6.1.1 Repair of damaged shop applied coating, and coating of uncoated girth welds and fittings, shall be in
accordance with ECS 19-1-1-3 Appendix A using a 100% solids epoxy supplied in one liter kits. The following
are some precautions for using these kits.

a. Read and make sure manufacturer’s are fully understood.

b. Store bulk materials in a cool dry shaded area.

c. Cooling materials prior to use will increase pot life. This may be accomplished by placing unopened
containers in cool water or ice water prior use.

d. Stir Part B component prior to mixing with Part A.

e. Mix Part A and B until a uniform color is achieved making sure to scrape the bottom and sides of the
container.

f. Mixed coating must be used as soon as it is mixed. If not used immediately, the heat generated by the
coating will cause the coating to set-up in the pot.

g. Spread coating with 100 mm (4 inch) wide brushes or trowels.

6.2 Coating of Field Welded Girth Welds over the Ditch

Field girth welds shall be coated and wrapped per ECS 19-1-1-3 Appendix B “Cold Applied Tape Wrap System”
using Polyguards RD-6 Tape.

6.3 Coating of Damaged Epoxy Coating over the Ditch

Damaged to epoxy coated pipe shall be repaired per ECS 19-1-1-3 Appendix A using 100% solids epoxy
supplied in the Cartridge Repair Kits.