CONTRACT NO: 1-14-2410/59 CALCULATION NO: 2411-8320-CA-WA15-0001

CLIENT: PETRORabigh SAFETY CALCULATION: YES

PROJECT TITLE: PETRORabigh - UOU PROJECT COMP. PROG: EXCEL DSN NO: 6598

DISCIPLINE: CIVIL & STRUCTURAL ENGINEERING CALCULATION CLASS: 1 PAGE: 1 OF

SUBJECT

WEST AREA PIPE RACK - WA15, DESIGN CALCULATIONS

DRAWING Nos.

2411-8310-43-WA15-0001 : WA15 PIPE RACK FOUNDATION LAYOUT AND R.C.DETAILS


2411-8320-46-WA15-0001 : WA15 PIPE RACK ARRANGEMENT PLAN AT EL +7.845,8.4,10.5,11.4,12.4
14 & 20.95
2411-8320-46-WA15-0002 : WA15 PIPE RACK ARRANGEMENT ELEVATIONS & SECTIONS

REMARKS

REV DATE DESCRIPTION ORIGINATOR CHECKER APPROVER


O1 5-Jan-07 Issued For Comments TPR Ashokan
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 1 of 8
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001

CONTENTS

SECTION SUBJECT SHEET NO

1.0 SCOPE 2

2.0 REFERENCES 2

3.0 DESIGN DATA 2

4.0 DESIGN BASIS 2

5.0 LOADS & LOAD COMBINATIONS 3

6.0 STAAD MODEL 7

7.0 ANALYSIS & DESIGN 7

8.0 SUMMARY 8

APPENDIX - A Typical cross section of the Piperack A1

APPENDIX - B Piping stress report B1 to B7

APPENDIX - C Wind Load Calculation C1 To C2

APPENDIX - D Seismic analysis-load data D

APPENDIX - E Effective Length Factor Calculation E1 to E2

APPENDIX - F Staad Model F

APPENDIX - G Staad Input and Output file G

APPENDIX - H Base Plate Design H

APPENDIX - J Anchor Bolt Design J

APPENDIX - K Shear Key Design K

APPENDIX - L Foundations and Pedestals L


FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 2 of 8
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
1.0 SCOPE

This calculation covers the analysis and design of Piperack of West Area
(WA15) of PETRORabigh Project, The Kingdom of Saudi Arabia. The superstructure is of steel and is analysed and
designed using STAAD Pro-2004 for various load combinations.

2.0 REFERENCES

2.1 Codes & Standards


Industry Codes and Standards
AISC -LRFD - Manual of Steel construction LRFD-Third Edition.
ASCE 7 - 02 - Minimum Design Loads for Buildings and Other Structures
Saudi Aramco Standards
SAES-A-112 - Meteorological and Seismic Design Data
SAES-A-204 - Preparation of Structural Calculations
SAES-M-100 - Saudi Aramco Building Code
SAES-M-001-AMD (R2) - Structural Design criteria for Non-building structures
SABP-006 - Wind loads on Piperacks and Open frame structures.
SABP-007 - Steel piperack design.
Project Standards
2411-8310-DI-0001 - Civil Disipline Design Instruction

2.2 Drawings
2411-8320-46-O000-0001 - Steel work-General Notes
2411-8310-43-O000-0001 - Civil General Notes
2411-8230-46-CA00-0031 - Piping layout- Construction area-CA10-Rack section
2411-8230-01-CA00-0001 - Plot Plan- Construction area -CA00
2411- 8230-02-CA00-0001 - Central Sub area Plot plan Keyplan

2.3 Other References


2411-8230-01-O000-0001 - Overall Plot Plan
2411-8230-02-O000-0001 - Overall UOU Scope- Area Key plan

3.0 DESIGN DATA

3.1 Material Data


The grade of structural steel used shall confirm EN10025 S355J0.
2 2
The yield strength of the steel is assumed to be 355N/mm and 275N/mm for beam and angle sections respectively.
The European sections are used for the member design.

3.2 Soil Data


The soil data is obtained from "The Geo Technical Investigation & survey report " by Osaimi Engineering, Saudi Arabia. A
detailed study and a thorough investigation has been carried out by them and all necessary data required for foundation design
like Soil parameters and location of existing and new bore holes are obtained from the same report and taken into account for
foundation and analysis for this rack.

3.3 Mateorological Data


The meterological datas are obtained from SAES-A-112 and the same has been taken into account in the design.

4.0 DESIGN BASIS


Description of the Structure
The WA15 piperack is a steel structure and is located in the West Area of PETRORabigh Project Site. This is
22m long in East-West directions, 18.35 m high and 7 m wide structure with two racks. It consists of portal frames of
at 4.5m,10.5 and 7m intervals with vertical bracing in the longitudinal direction and rigid frame in the transverse direction.
The Finished grade level of this area is at EL +2.60 m for grids A and B and 0.85m for grids C and D. The first rack level is
at EL+10.5m and the second rack is at +12.4m lvl.The typical cross section of the piperack is attached in Appendix A.
The pipe rack is supported with Isolated and combined footings
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 3 of 8
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
Location of piperacks is represented in key plan Dwg no: 2411-8230-02-CA00-0001.
Design Philosophy
Piperack structure is modeled as a 3-dimensional frame. The columns are considered as pinned at base. The structure is
analyzed through STAAD PRO 2004 for dead load, operating load, hydro-test load and surge load of pipe, dead load of cable
tray, wind load and seismic load on structure and their various combinations. It is designed as per AISC-Manual of Steel
Construction - LRFD 3rd edition.

In STAAD Model, the +ve X-axis is oriented towards North direction of the piperack.
The structure is checked for lateral deflection of H/100 as per SAES -M-001-AMD-Rev D2.

5.0 LOADS & LOAD COMBINATIONS

5.1 Primary Load Cases

Load Case
Description
(Staad)
1 SEISMIC LOAD +X EX
2 SEISMIC LOAD -X E-X
3 SEISMIC LOAD +Z EZ
4 SEISMIC LOAD -Z E-Z

11 DEAD LOAD (Self Weight of Structure) DS


12 OPERATING LOAD-PIPING/EQUIPMENT DO

21 DEAD LOAD - PIPING / EQUIPMENT DE

22 TEST LOAD- PIPING/EQUIPMENT DT

31 ANCHOR LOAD IN +VE DIR. AF1


32 ANCHOR LOADI IN -VE DIR. AF2

33 FRICTION LOAD IN +VE DIR. FT1


34 FRICTION LOAD IN -VE DIR. FT2
35 TEMPERATURE LOAD T

41 WIND LOAD +Z WZ
42 WIND LOAD -Z W- Z

51 SURGE LOAD +X SX
52 SURGE LOAD -X S-X

5.2 Load Combinations


a) For Strength check
The piperack is designed based on Strength Design ( LRFD )method. The Load combinations and
load factors which are considered for the analysis and design are as follows. This is as per
SAES-M-001 Cl. 6.2.4- Table 8

1.4(Dead Load +Operating Load+anchor Load)+0.23 Friction Load+1.4 Temperature Load


101 1.4(DS+D0+AF1)+0.23FT1+1.4T
102 1.4(DS+D0+AF2)+0.23FT2+1.4T

1.2(Dead+Operating Load+Anchor)+ (1.6Wind or 1.0 Seismic Load)


103 1.2(DS+DO+AF1)+1.6W Z
104 1.2(DS+DO+AF1)+1.6W -Z
105 1.2(DS+DO+AF1)+1.0EX
106 1.2(DS+DO+AF1)+1.0E-X
107 1.2(DS+DO+AF1)+1.0EZ
108 1.2(DS+DO+AF1)+1.0E-Z
109 1.2(DS+DO+AF2)+1.6W Z
110 1.2(DS+DO+AF2)+1.6W -Z
111 1.2(DS+DO+AF2)+1.0EX
112 1.2(DS+DO+AF2)+1.0E-X
113 1.2(DS+DO+AF2)+1.0EZ
114 1.2(DS+DO+AF2)+1.0E-Z
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 4 of 8
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001

0.9 Dead Load + 1.6Wind


115 0.9(DS+DE)+1.6W Z
116 0.9(DS+DE)+1.6W -Z

0.9 Dead Load +0.6 Operating+ 1.0 Seismic (operating)


117 0.9DS+0.6DO+1.0EX
118 0.9DS+0.6DO+1.0E-X
119 0.9DS+0.6DO+1.0EZ
120 0.9DS+0.6DO+1.0E-Z

0.9 Dead Load + 1.0 Seismic (empty)


~ 0.9 Dead Load + 0.67 Seismic (operating)
121 0.9(DS+DE)+0.67EX
122 0.9(DS+DE)+0.67E-X
123 0.9(DS+DE)+0.67EZ
124 0.9(DS+DE)+0.67E-Z

1.4(Dead Load )+ 1.4(Test Load)


125 1.4(DS+DT)

1.2(Dead Load )+ 1.2(Test Load) +(Wind @50MPH)


126 1.2(DS+DT)+0.29W Z
127 1.2(DS+DT)+0.29W -Z

1.4(Dead Load +Operating Load+anchor Load)+0.23 Friction Load+1.4 Temperature Load+1.0(Surge Load)
128 1.4(DS+D0+AF1)+0.23FT1+1.4T+1.0S X
129 1.4(DS+D0+AF2)+0.23FT2+1.4T+1.0S -X

1.2(Dead+Operating Load+Anchor)+ 1.0(Surge Load)


130 1.2(DS+DO+AF1)+1.0SX
131 1.2(DS+DO+AF1)+1.0S-x
132 1.2(DS+DO+AF2)+1.0SX
133 1.2(DS+DO+AF2)+1.S-x

1.4(Dead Load +Operating Load+anchor Load)+0.23 Friction Load+1.4 Temperature Load


151 1.4(DS+D0+AF1)+0.47FT1+1.4T
152 1.4(DS+D0+AF2)+0.47FT2+1.4T

1.4(Dead Load +Operating Load+anchor Load)+0.23 Friction Load+1.4 Temperature Load+1.0(Surge Load)
153 1.4(DS+D0+AF1)+0.47FT1+1.4T+1.0S X
154 1.4(DS+D0+AF2)+0.47FT2+1.4T+1.0S -X

b) For Serviceability check

1.0(Dead Load +Operating Load+anchor Load)+0.17 Friction Load+1.0 Temperature Load


201 1.0(DS+D0+AF1)+0.17FT1+1.0T
202 1.0(DS+D0+AF2)+0.17FT2+1.0T

1.0(Dead+Operating Load+Anchor)+ (1.0Wind or 0.7 Seismic Load)


203 1.0(DS+DO+AF1)+1.0W Z
204 1.0(DS+DO+AF1)+1.0W -Z
205 1.0(DS+DO+AF1)+0.7EX
206 1.0(DS+DO+AF1)+0.7E-X
207 1.0(DS+DO+AF1)+0.7EZ
208 1.0(DS+DO+AF1)+0.7E-Z
209 1.0(DS+DO+AF2)+1.0W Z
210 1.0(DS+DO+AF2)+1.0W -Z
211 1.0(DS+DO+AF2)+0.7EX
212 1.0(DS+DO+AF2)+0.7E-X
213 1.0(DS+DO+AF2)+0.7EZ
214 1.0(DS+DO+AF2)+0.7E-Z

1.0 Dead Load + 1.0Wind


215 1.0(DS+DE)+1.0W Z
216 1.0(DS+DE)+1.0W -Z
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 5 of 8
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001

0.9 Dead Load +0.6 Operating+ 0.7Seismic (operating)


217 0.9DS+0.6DO+0.7EX
218 0.9DS+0.6DO+0.7E-X
219 0.9DS+0.6DO+0.7EZ
220 0.9DS+0.6DO+0.7E-Z

0.9 Dead Load + 0.7 Seismic (empty)


~ 0.9 Dead Load + 0.5 Seismic (operating)
221 0.9(DS+DE)+0.5EX
222 0.9(DS+DE)+0.5E-X
223 0.9(DS+DE)+0.5EZ
224 0.9(DS+DE)+0.5E-Z

1.0(Dead Load )+ 1.0(Test Load)


225 1.0(DS+DT)

1.2(Dead Load )+ 1.2(Test Load) +(Wind @50MPH)


226 1.2(DS+DT)+0.29W Z
227 1.2(DS+DT)+0.29W -Z

1.0(Dead Load +Operating Load+anchor Load)+0.17 Friction Load+1.0 Temperature Load+1.0(Surge Load)
228 1.0(DS+D0+AF1)+0.17FT1+1.0T+1.0S X
229 1.0(DS+D0+AF2)+0.17FT2+1.0T+1.0S -X

1.2(Dead+Operating Load+Anchor)+ 1.0(Surge Load)


230 1.2(DS+DO+AF1)+1.0SX
231 1.2(DS+DO+AF1)+1.0S-x
232 1.2(DS+DO+AF2)+1.0SX
233 1.2(DS+DO+AF2)+1.S-x

1.0(Dead Load +Operating Load+anchor Load)+0.33 Friction Load+1.0 Temperature Load


251 1.0(DS+D0+AF1)+0.33FT1+1.0T
252 1.0(DS+D0+AF2)+0.33FT2+1.0T

1.0(Dead Load +Operating Load+anchor Load)+0.33 Friction Load+1.0 Temperature Load+1.0(Surge Load)
253 1.0(DS+D0+AF1)+0.33FT1+1.0T+1.0S X
254 1.0(DS+D0+AF2)+0.33FT2+1.0T+1.0S -X

5.3 Load Calculations

5.3.1 Dead Load of Structure (STAAD Primary Load Case No :11)


Dead load due to self weight of structure is considered through STAAD command "SELF WEIGHT Y -1.1".
The self weight is increased by 10% to allocate the weight of connections.

5.3.2 Piping Loads


The preliminary piping loads are taken as per Stress Input Load Data and is shown in Appendix B.

a) Dead Load
Th empty weight of pipe is taken as 0.6 times the pipe operating weight as per Saudi Aramco Standards,
SAES-M-001-AMD.Rev.D2.clause 5.2.4.8.

b) Operating Load (STAAD Primary Load Case No :12)


The piping operating loads are taken as per Stress Input load data from piping department.

2
For pipes less than 12" and for future load, a load intensity of 1.91 kN/m is applied as per SABP -007
Cl. 4.1.2 & 4.2.2 and SAES-M-001 AMD Cl. 5.2.4.8. For pipes >12" the load is applied as concentrated
load and is as per pipe stress report. The load calculation is as per SABP-007, Cl.4.1.2.

c) Thermal Load
c1) Piping Friction Loads in Longitudinal Dir.
For pipe with diameter less than 12", a udl of 10% of the operating load is applied as friction force on the
supporting beam. For pipes with diameter greater than 12", the piping friction force in the longitudinal direction
is taken as per Stress Input Load Data.
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 6 of 8
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
c2) Piping Friction Loads in Transverse Dir.
The piping friction load in transverse direction are taken as per Stress Input Load Data.
c3) Piping Anchor Loads in Longitudinal Dir.
The piping anchor load in longitudinal direction are taken as per Stress Input Load Data.
c4) Piping Anchor Loads in Transverse Dir.
The piping anchor load in transverse direction are taken as per Stress Input Load Data.

c5) Temperature load on structure


O
As per the SABP-007, Cl.4.4.3 and SAES-A-112 Table1, design temperature of 38 C is used in the calculation.

Thigh 0
Highest one day mean temperature, = 35 C
Tlow 0
Lowest one day mean temperature, = 17 C
Tmetal 0
Metal temperature due to sun heating, = 20 C
0
Design temperature = (Thigh-Tlow)+Tmetal = 38 C

d) Hydro test loads (STAAD Primary Load Case No :22)


The hydro test loads are taken as per Stress Input Load Data.( Refer appendix-B)

e) Surge Load
The surge load of 15 T is applied for pipe line >12" at the anchor location. This is applied on the structure as if
surging action for single pipe will occur at a time.

5.4 Wind Loads

5.4.1 Wind Loads on Frame


The Wind load intensity is calculated as per ASCE 7-02 and the same is referred in Appendix-C. The wind load is
applied on the effective solid area of the frame, i.e., on columns, on beams and on vertical bracings as udl. Wind
loads are calculated based on no shielding. For all structural members the wind force coefficient, Cf is 1.8, except
for columns, for which Cf is 2.0. Wind load is applied only in the transverse direction of the piperack as per
SABP-007, Cl. 4.5.4.

5.4.2 Wind Loads on Pipes


Wind loads on pipes are calculated by Tributary area method as per SABP-006,Cl 4.1.1 and same is as shown in
Appendix C. Considering rough insulation (approximately 100mm thickness), a force coefficient of 0.7 is used for
pipe area calculation as per SABP-006 Cl. 4.1.3.

5.5 Seismic Loads

Seismic Load calculation is based on ASCE 7-02. Seismic data is as per as per SAES-A-112 Rev. D2. All gravity loads (self
weight, piping dead load, equipment dead load(if any), piping opereating load and equipment operating load(if any), cable tray
dead load) are considered for the Base shear calculation.(Refer Appendix -D)

6.0 STAAD MODEL


The sketches of staad model is attached in Appendix-F

7.0 ANALYSIS & DESIGN


The output of STAAD File gives the analysis and design of the pipe rack structure, in which transverse beams design for
critical force Load combinations Nos. 103 to 127, 130 to 133 and 151 to 154. and rest of members like columns, longitudinal
beams and bracings for critical force Load combination Nos. 101 to 133. STAAD Files are enclosed in Appendix G.

7.1 Analysis and design of foundation

Isolated Footing foundations are adopted. The design and analysis for the foundation will be covered under Appendix-J

7.2 Analysis and design of beams


The main transverse beams are designed as moment restrained beams.The longitudinal and secondary beams are designed
as simply supported beams. The vertical deflection in all these beams are limited to L/240 as per SAES -M-001-AMD- Rev- D2,
Cl. 7.8. The horizontal deflection of anchor beam (beam on which the pipe is anchored) is limited to H/500 as per pipe stress
analysis procedure, 2411-8230-PR-0002,R1, Cl.8.4. and the stress ratio's of anchor beams are limited within 0.75

7.3 Analysis and design of Columns


The effective length factor for the column is calculated as per AISC-ASD Commentary and is shown in Appendix E.
The lateral deflection is limited to H/100 as per SAES-M-00A-AMD, CL.7.7 and SABP -007.
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 7 of 8
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001

8.0 BASEPLATE DESIGN


Baseplate design is based on AISC-LRFD method. For typical calculation of baseplate at braced and unbraced part of
columns, refer Appendix H.

9.0 ANCHOR BOLT DESIGN

The calculation is based on ACI 318-2002, Appendix D. For anchor bolt design at braced and unbraced areas, refer Appendix
J.

10.0 SHEAR KEY DESIGN

Shear keys are provided with baseplate where the shear at column base is more,i.e., at braced areas of columns. Refer
Appendix K for typical calculations.

11.0 Summary

11.1.a Interaction ratio's of critical members for WA15

Interaction
Item Section Member Load Case
ratio
Columns
Columns HEA400 27 0.619 104
Main Transverse bent beams @ EL. +5.90m
Main beams HE300B 523 0.790 110
Main Transverse bent beams @ EL. +10.500m
Main Beams at braced bay IPE360 155 0.864 104
Anchor beam HEA280 131 0.598 110
Main beams Non- braced bay IPE360 128 0.408 110
Main Transverse bent beams @ EL. +12.400m
Main Beams at braced bay IPE360 291 0.790 104
Anchor beam HEA280 290 0.570 110
Main beams Non- braced bay IPE360 289 0.412 110
Main Transverse bent beams @ EL. +14.0m
Main beams HE140A 320 0.540 103
Intermediate Transverse beams @ EL. +10.50 IPE300 264 0.440 153
Intermediate Transverse beams @ EL. +12.40 IPE300 183 0.550 125
Main longitudinal beams @EL. +10.500
Main Longitudinal beams IPE300 255 0.240 110
Main Longitudinal beams IPE450 103 0.400 102
Main longitudinal beams @EL. +12.400 m
Main Longitudinal beams IPE360 487 0.120 125
Main Longitudinal beams IPE450 94 0.600 125
Main Longitudinal beams IPE300 272 0.250 110
Main longitudinal beams @EL. +14.00 m
Main Longitudinal beams IPE300 323 0.190 129
Longitudinal Tie beams@ EL. +17.475/20.95 m
Longitudinal Tie beams IPE360 558 0.190 109
Longitudinal Tie beams IPE300 301 0.068 110
Longitudinal Tie beams HE280A 374 0.200 110
Longitudinal Tie beams@ EL. +5.9/7.845 m
Longitudinal Tie beams HEA280 540 0.56 128
Longitudinal Tie beams IPE300 368 0.1 104
Vertical Bracing
All bracings IPE400 -Tee 484 0.68 128
Bottom bracing IPE400 570 0.372 129
Horizontal Bracing
Bracing @ EL. 10.500 m L130X130X12 500 0.761 110
Bracing @ EL. 12.500 m L130X130X12 506 0.56 129

b) Displacement / Deflection of Structure


Z-direction displacement (For beams)
For beams at anchor bays
Length Absolute X Displacement
Level
(m) Node Case Disp. Disp.
Lvl. 10.50 7 70 253 1.802 14
Lvl. 12.40 7 22 253 3.215 14
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 8 of 8
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001

Y-direction displacement (For beams)


Length Absolute Y Displacement
Level
(m) Node Case Disp. Disp.
Lvl. 10.50 7 78 230 12 29
Lvl.12.40 7 92 226 24 29

X-direction displacement (For Columns)


Height Absolute Z Displacement
Level
(m) Node Case Disp Allowable
Lvl. 10.50 6.95 19 210 37.00 70
Lvl. 10.50 7.18 28 210 48.00 72
Lvl. 10.50 9.27 37 204 56.00 93
Lvl. 12.4 8.85 21 210 45.00 89
Lvl. 12.4 9.07 30 210 55.00 91
Lvl. 12.4 11.17 39 204 62.50 112

c) Anchor beam- Interaction ratio check

PNT/PN
mnz MNZ mny MNY pnt/pnc r=(mnz/MNZ)+(mny*2/MNY)
Beam no C
(kNm) (kNm) (kNm) (kNm) (kNm) +(pnt/PNT)
(kNm)
131 109.76 253.31 17.58 115.24 16.12 678.00 0.76
290 139.72 253.31 0.10 115.24 18.36 493.41 0.59

Where
mnz = Actual Bending Moment in Z dir.
MNZ = Design Bending Moment in Z dir.
mny = Actual Bending Moment in Y dir.
MNY = Design Bending Moment in Z dir.
pnt = Actual axial capacity in compression
PNT = Design compressive force
pnc = Actual axial capacity in tension
PNC = Design tensile force
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 1 of 2
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2412/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001

APPENDIX - A
Typical cross section of the Piperack

CALC. NO: B36 M BE - 867623 Rev 0


FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 2 of 2
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2412/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No :
PROJECT: RABIGH DEVELOPMENT PROJECT, Saudi Arabia Rev Date Originator Checker Approver

CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan

SAFETY CALC. YES


CALC. NO 2411-8320-CA-WA15-0001

APPENDIX - B
Piping stress report
( Received from Stress Dept. on 7th November 2006 )

CALC. NO: B36 M BE - 867623 Rev 0


Project:Petro-Rabigh
Piping Load Data Sheet

Pipe Support Load Data Sheet for Elevation _10.5 m (AREA WA-15)
For Non analysed lines along Grid S10-S20
SL. Operating wt Hydrotest
Service Grid From - To Axial Operating support loads Fz at Rack Grids (KN) [ Note-7] Remarks
No. (KN/M) wt (KN/M)
Vertically Vertically
S10 S11 S12 S13 S14 S15 S16 S17 S18 S19
Down (G) Down (Q)
Between S3 and S20
1 10"-P-O000-091-1SC0P01-NI 0.272 0.272
Between S5 and S20
2 6"-OW-O000-007-12LC1U16-NI 0.277 0.277
Between S3 and S20
3 3"-CA-O000-011-1CC2C06-NI 0.111 0.111 3(0.55)
Between S5 and S20
4 3"-FG-O000-028-1CC1P01-NI 0.111 0.157 3(0.55)
Between S5 and S20
5 3"-G-O000-010-3CC1P01-NI 0.111 0.157
3(0.55)
6 8"-G-O000-017-3CC1P01-NI Stress analysed line

NORTH Y (UP)
NOTE :
1. All Forces are in KN until and unless specified.
2. G= Permanent load (Maximum of Sustained and operating)
3. Q= Test load
4. X,Y and Z are the direction of force
5. Combination of above loads are to be carried out by Structural Designer.
6. Horizontal load of 30% of Vertical load to be considered for the non-analysed lines
7. Number in paranthesis indicates the maximum seismic load.(without combination with operating load) .
8. Explanation of grid numbering in row 4 is as follows:
Z X
As an examle, 85-86-1 means the first steel beam as we proceed from grid 85 to 86.

OVER ALL REPORT FOR WA15.xls Page 1 of 1


Project: Petro-Rabigh
Piping Load Data Sheet

Date: 14/09/2006
Pipe Support Load Data Sheet for Elevation _12.4 m (AREA WA-15)
For Non analysed lines along Grid S10 - S20
SL. Operating wt Hydrotest
Service Grid From - To Axial Operating support loads Fz at Rack Grids (KN) [ Note-7] Remarks
No. (KN/M) wt (KN/M)
Vertically Vertically
S10 S11 S12 S13 S14 S15 S16 S17 S18 S19
Down (G) Down (Q)
Between Grid S5 and S20
1 4"-DMW-O000-012-1SC0U16-NI 0.082 0.082 4(0.41)
Between Grid S5 and S20
2 3"-IA-O000-027-12CG0U01-NI 0.111 0.157 3(0.55)
Between Grid S5 and S20
3 3"-UA-O000-028-12CG0U01-NI 0.111 0.157 3(0.55)
Between Grid S5 and S20
4 3"-UW-O000-033-1CS2U16-NI 0.111 0.111 3(0.55)
Between Grid S5 and S20
5 3"-SWS-O000-033-1CS4U16-NI 0.111 0.111 3(0.55)
Between Grid S5 and S20
6 8"-LC-O000-028-1CS1P05-PP 0.416 0.416
Between Grid S5 and S20
7 6"-N-O000-030-1CC1P01-NI 0.277 0.277

8 24"-MS-O000-017-3CS1P05-IH
Stress analysed line
9 24"-LS-O000-037-1CS1P05-IH
Stress analysed line
10 8"-HS-O000-018-6CS1P05-IH
Stress analysed line

NOTE : NORTH Y (UP)


1. All Forces are in KN until and unless specified.
2. G= Permanent load (Maximum of Sustained and operating)
3. Q= Test load
4. X,Y and Z are the direction of force
5. Combination of above loads are to be carried out by Structural Designer.
6. Horizontal load of 30% of Vertical load to be considered for the non-analysed lines
7. Number in paranthesis indicates the maximum seismic load.(without combination with operating load) .
8. Explanation of grid numbering in row 4 is as follows:
As an examle, 85-86-1 means the first steel beam as we proceed from grid 85 to 86. Z X

OVER ALL REPORT FOR WA15.xls Page 1 of 1


Project: Petro-Rabigh
Piping Load Data Sheet

CALCULATION No. : CA-C099 Rev R3 Date: 07/11/2006


Pipe Support Load Data Sheet for 24"-LS-O000-037-1CS1P05-IH (Area WA15)
TOS EL.+12.4m; Design Pressure 6 kg/cm 2; Design Temperature200 OC
Rack Occasional Loads (See Note 5)
Column G Q Operating
No. No. Support Description (Vertically (Vertically Horizontal Load Wind(X) Wind(Z) Seismic(X) Seismic(Z) Remarks
/ Node Down) Down)
Name X Z X Z Y X Z Y X Z Y X Z Y
1 10380 Rigid +Y Rigid Z 24.99 61.45 1.61 / -9.6 -12.03 2.43 1.32 4.70 12.01
CA07
2 10387 Rigid +Y Rigid X 28.74 41.45 -7.80 10.96 7.26 -2.05 11.60
3 19000 Rigid +Y 19.84 48.79 1.20 2.05 S10-S11- A
4 19010 Rigid +Y 46.86 54.19 -3.30 -11.07 3.26 4.04 -4.89 -2.21 S10-S11- B
5 19050 Rigid +Y Rigid X 19.65 48.25 6.61 / -1.05 -2.54 7.63 -2.09 9.73 4.60 S12
6 19070 Rigid +Y Rigid X 15.23 37.71 -2.90 6.65 -1.89 3.11 -1.86 2.51 S16
7 20025 Rigid +Y 15.74 24.27 -1.42 -4.50 -1.24 S19
8 20070 Rigid X RigidY Rigid Z 4.09 7.13 27.05 INTERFACE

NORTH Y (UP)
Note : 1. All Forces are in KN until and unless specified.
2. G= Permanent load (Maximum of Sustained and operating)
3. Q= Test load
4. X,Y and Y are the direction of force
5. Wind and Seismic forces to be applied again with reversal of Direction and are in addition to the Operating Loads.
6. Combination of above loads are to be carried out by Structural Designer.

7. Nodes have been named to match column numbers to simplify reference between the Caesar output and the Load Spreadsheet.
To determine the input node corresponding to a particular node name use the Node Names tab in the List Input Function of the Cae
Z
X

OVER ALL REPORT FOR WA15.xls Page 1 of 1


Project: Petro Rabigh
Piping Load Data Sheet

CALCULATION No. : CA-C102 Rev R4 Date: 07/11/2006


Pipe Support Load Data Sheet for 24"-MS-O000-017-3CS1P05-IH (Area WA15)
TOS EL.+12.4m; Design Pressure 25 kg/cm 2; Design Temperature 295 OC
Rack Occasional Loads (See Note 5)
Column G Q Operating
No. No. Support Description (Vertically (Vertically Horizontal Load Wind(X) Wind(Z) Seismic(X) Seismic(Z) Remarks
/ Node Down) Down)
Name X Z X Z Y X Z Y X Z Y X Z Y
1 16130 Rigid +Y 27.21 47.29 -8.07 -1.25
2 16160 Rigid +Y 18.56 48.58 -4.06
CA07
3 16180 Rigid Y Rigid +Y 10.07 16.31 -5.69 -8.90 -6.07 4.76 1.86 11.27 4.53 14.45 1.02
4 16220 Rigid +Y 27.31 53.59 -7.31 3.69 4.89 -12.27 3.74 -11.94
5 16250 Rigid +Y 27.71 65.67 3.76 -7.42 -2.18 5.82 20.24 -2.14 -7.56 17.19 -1.51 S10-S11- A
6 16290 Rigid X Rigid +Y 13.10 34.32 4.35 -3.32 18.42 -9.88 -14.51 -2.56 1.88 3.71 16.07 -11.53 S11
7 16395 Rigid +Y 12.66 33.00 -1.18 1.05 3.50 1.22 2.16 1.43 S14
8 16400 Rigid +Y 6.54 12.80 -1.96 S16
9 16410 Rigid X Rigid +Y 13.59 32.90 -1.32 -3.72 7.42 -1.37 3.53 S18
10 16480 Rigid Z Rigid Y Rigid X 8.15 12.95 1.25 32.40 1.37 8.58 5.28 1.49 1.06 15.18 -1.13 INTERFACE

NORTH Y (UP)
Note : 1. All Forces are in KN until and unless specified.
2. G= Permanent load (Maximum of Sustained and operating)
3. Q= Test load
4. X,Y and Y are the direction of force
5. Wind and Seismic forces to be applied again with reversal of Direction and are in addition to the Operating Loads.
6. Combination of above loads are to be carried out by Structural Designer.

7. Nodes have been named to match column numbers to simplify reference between the Caesar output and the Load Spreadsheet.
To determine the input node corresponding to a particular node name use the Node Names tab in the List Input Function of the Cae
Z
X

OVER ALL REPORT FOR WA15.xls Page 1 of 1


Project: PETRO-RABIGH
Piping Load Data Sheet

CALCULATION No. : CA-C097 Rev R1 Date: 07/11/2006


Pipe Support Load Data Sheet for 8"-G-O000-017-3CC1P01-NI (Area WA15)
TOS EL.+10.5m; Design Pressure 45 kg/cm 2; Design Temperature165 OC
Rack Occasional Loads (See Note 5)
Column G Q Operating
No. No. Support Description (Vertically (Vertically Horizontal Load Wind(X) Wind(Z) Seismic(X) Seismic(Z) Remarks
/ Node Down) Down)
Name X Z X Z Y X Z Y X Z Y X Z Y
1 10 Rigid Z Rigid X Rigid Y 5.28 2.51 7.54 1.24 5.80 -1.27 INTERFACE
2 80 Rigid +Y 7.07 6.42 1.47 S18
3 90 Rigid +Y S18-S16 INTERMEDIATE
4 100 Rigid +Y Rigid X 2.08 1.89 1.73 1.80 S16
5 110 Rigid +Y 2.67 2.08 S16-S14 INTERMEDIATE
6 120 Rigid +Y 2.22 2.02 S14
7 130 Rigid +Y 3.48 1.94 -1.05 S14-S12-INTERMEDIATE
8 140 Rigid +Y Rigid X 2.51 2.29 1.64 2.35 S12
9 150 Rigid +Y 1.95 1.77 S11
10 160 Rigid +Y S11-S10-INTERMEDIATE
11 170 Rigid +Y Rigid X 9.62 8.74 S10
12 200 Rigid +Y 18.74 2.66 5.62 1.36
13 210 Rigid +Y 3.03 2.75
14 220 Rigid +Y Rigid X 1.51 1.38 1.05 1.35 4.17
15 230 Rigid +Y Rigid Z 5.17 4.70 -3.68 -8.82 1.17 4.31 CA-07
16 260 Rigid +Y 8.63 6.23 -2.51
17 270 Rigid +Y Rigid Z -2.12 1.12
18 280 Rigid +Y Rigid X 1.37 1.25 6.11 1.05

NORTH Y (UP)

Note : 1. All Forces are in KN until and unless specified.


2. G= Permanent load (Maximum of Sustained and operating)
3. Q= Test load
4. X,Y and Y are the direction of force
5. Wind and Seismic forces to be applied again with reversal of Direction and are in addition to the Operating Loads.
6. Combination of above loads are to be carried out by Structural Designer.

7. Nodes have been named to match column numbers to simplify reference between the Caesar output and the Load Spreadsheet.
To determine the input node corresponding to a particular node name use the Node Names tab in the List Input Function of the Cae Z
X

OVER ALL REPORT FOR WA15.xls Page 1 of 1


Project: PETRO-RABIGH
Piping Load Data Sheet

CALCULATION No. : CA-C101 Rev R2 Date: 07/11/2006


Pipe Support Load Data Sheet for 8"-HS-O000-018-6CS1P05-IH (Area WA15)
Design Pressure 48 kg/cm 2; Design Temperature 400 OC
Rack Occasional Loads (See Note 5)
Column G Q Operating
No. No. Support Description (Vertically (Vertically Horizontal Load Wind(X) Wind(Z) Seismic(X) Seismic(Z) Remarks
/ Node Down) Down)
Name X Z X Z Y X Z Y X Z Y X Z Y
1 6615 Rigid +Y 7.70 6.41 -2.29
2 6635 Rigid Z Rigid +Y 7.38 9.27 -4.35 -9.82 1.44 3.15 5.74 CA07
3 6645 Rigid X Rigid +Y 15.14 11.14 -6.03 6.35 4.22 -1.36 3.48
4 6675 Rigid +Y 4.23 5.32 -1.73 -1.45 S10
5 6685 Rigid +Y 11.07 13.91 3.24 / -1.06 -1.02 3.45 1.27 -1.27 2.99 -1.34 S10-S11-A
6 6725 Rigid X Rigid +Y 7.38 9.28 1.45 -2.30 5.08 -2.20 -2.25 4.21 -1.95 S10-S11-INTERMEDIATE
7 6755 Rigid +Y 7.73 9.71 -1.74 S14
8 6757 Rigid X Rigid +Y 3.38 4.25 4.46 2.89 S16
9 23011 Rigid +Y 9.54 10.55 -2.82 S18
10 6810 Rigid Z Rigid Y Rigid X 2.11 2.93 12.03 1.18 3.17 2.53 7.10 INTERFACE

NORTH Y (UP)
Note : 1. All Forces are in KN until and unless specified.
2. G= Permanent load (Maximum of Sustained and operating)
3. Q= Test load
4. X,Y and Y are the direction of force
5. Wind and Seismic forces to be applied again with reversal of Direction and are in addition to the Operating Loads.
6. Combination of above loads are to be carried out by Structural Designer.

7. Nodes have been named to match column numbers to simplify reference between the Caesar output and the Load Spreadsheet.
To determine the input node corresponding to a particular node name use the Node Names tab in the List Input Function of the Cae
Z
X

OVER ALL REPORT FOR WA15.xls Page 1 of 1


Petro Rabigh
Piping Load Data Sheet

CALCULATION No. : CA-C0035 Rev A1 Date: 06/10/2006


Pipe Support Load Data Sheet for 6"-RLL-S130-XXX-1CC2P03-NI (Area CA08/CA10/WA15)
Design Pressure = 3.5/-0.33 kg/cm 2; Design Temperature = 250 Oc
Rack Occasional Loads (See Note 5)
G Q Operating Horizondal Loads
Column No.
No. Support Description (Vertically (Vertically Wind(X) Wind(Z) Seismic(X) Seismic(Z) Remarks
/ Node Name
Down) Down)
(see note 7) X Z X Z Y X Z Y X Z Y X Z Y
1 1855 Rigid +Y 2.59 ON D B/W 21-22 CA08
2 1875 Rigid +Y 2.90 0N D& 21 CA08
3 1880 Rigid +Y 3.48 ON C& 21 CA08
4 1890 Rigid +Y Rigid X 2.87 -1.52 -1.32 1.99 1.65 ON B & 21 CA08
5 1895 Rigid +Y 3.61 -1.06 B/W B TO A 6.0m FROM B CA08
6 1910 Rigid +Y Rigid X 3.58 -1.27 1.66 B/W A TO L 5.0m FROM B CA10
7 1920 Rigid +Y 2.01 B/W L TO K 2.75m FROM L CA10
8 1940 Rigid +Y Rigid X 3.74 -1.18 1.36 1.82 B/W L TO K 8.25m FROM L CA10
9 1960 Rigid +Y Rigid Z 3.60 1.77 1.32 1.11 10.83 ON K CA10
10 1970 Rigid +Y 3.11 0N J CA10
11 1980 Rigid +Y Rigid X 3.90 1.23 2.18 2.32 ON H CA10
12 1990 Rigid +Y 3.37 ON G CA10
13 1995 Rigid +Y 3.35 B/W G TO F 6.5m FROM G CA10
14 2000 Rigid +Y Rigid X 3.15 1.09 2.46 2.03 ON F CA10
15 2002 Rigid +Y 2.33 B/W F TO E 5.25m FROM F CA10
16 2005 Rigid +Y 2.97 B/W F TO E 10.5m FROM F CA10
17 2007 Rigid +Y 1.31 ON E CA10
18 2035 Rigid +Y 3.23 A FRAME CA10 TO WA15
19 2040 Rigid +Y Rigid Z 4.09 -1.99 2.55 1.27 A FRAME CA10 TO WA15
20 2050 Rigid +Y Rigid Z 3.92 -1.65 -1.57 1.73 1.35 A FRAME CA10 TO WA15
21 2060 Rigid +Y Rigid X 3.89 1.37 1.35 4.98 A FRAME CA10 TO WA15
22 2070 Rigid +Y Rigid Z 4.18 2.25 -3.31 1.91 1.49 A FRAME CA10 TO WA15
23 2105 Rigid +Y 3.52
24 2110 Rigid +Y Rigid X 3.12 2.26 -1.61 1.98 1.76
WA 15
25 2120 Rigid +Y 4.69 -1.29
26 2130 Rigid +Y 1.52

NORTH Y (UP)
Note : 1. All Forces are in KN until and unless specified.
2. G= Permanent load (Maximum of Sustained and operating)
3. Q= No Test load (Pnematic testing only)
4. X,Y and Z are the direction of force
5. Wind and Seismic forces to be applied again with reversal of Direction and are in addition to the Operating Loads.
6. Combination of above loads are to be carried out by Structural Designer.
7. Nodes have been named to match column numbers to simplify reference between the Caesar output and the Load Spreadsheet.
To determine the input node corresponding to a particular node name use the Node Names tab in the List Input Function of the Caesar Z X
input sheet

OVER ALL REPORT FOR WA15.xls Page 1 of 1


FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 1 of 3
PROJECT: PETRO RABIGH, UOU PROJECT Rev Date Originator Checker Approver

CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan


SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001

APPENDIX - C
Wind Load Calculation

CALC. NO: B36 M BE - 867623 Rev 0


FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 2 of 3
PROJECT: PETRO RABIGH, UOU PROJECT Rev Date Originator Checker Approver

CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan


SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001

Wind Load Analysis


Load data and calculation is based on ASCE 7-02

Basic Wind Speed V = 93 mph = 41.59 m/sec Ref SAES-A-112 Table 1-Rabigh Plant Site
Exposure Category(A,B,C or D) = C Ref SAES-A-112 Table 1-Rabigh Plant Site
Building & other structure Category = IV Ref SABP-006, Cl.3.6
Height of the Structure h= 18.35 m (EL.20.95-EL.2.600)

Topographic Factor Kzt = 1 Ref SABP-006, Cl.3.6


Velocity Exposure Coefficient Kz = 0.99 Ref.Table 6.3-ASCE 7-02
Wind Directionality Factor Kd = 1 Ref Table 6.4-ASCE 7-02
Gust Effect Factor Gf = 0.85 Ref. SABP-006, Cl.3.7
Importance Factor I = 1.15 Ref Table 6.1-ASCE 7-02

Eqn. 6-1 Velocity Pressure qz = 0.613 Kz Kzt KdV² I


= 1207.27 N/m²
= 1.21 kN/m²
Eq 6-25 Design Wind Force F= qz Gf Cf Af
where Af = Projected Area for pipes
= L [ d + 10%(W)] As per SABP-006,Cl. 4.1
Cf = Force Coefficient
1) Wind force on Pipes
Width of the Pipe Rack W = 7 m
Spacing of the Pipe rack Main frame L = 6.125 m
Force Coefficient for pipes Cf = 0.7 As per SABP-006,Cl. 4.1.3

Force to be applied @ 10.5 EL. F = qz Gf Cf Af


Largest pipe dia In this level d = 0.254 m (Pipe dia = 10" , insulation= 0 mm)
Projected Area A = 5.84325 m2
Wind force F = 1.21x0.85x0.9x5.84325
= 4.2 kN

Force to be applied @ 12.4 EL. F = qz Gf Cf Af


Largest pipe dia In this level d = 0.809 m (Pipe dia = 24" , insulation= 100 mm)
Projected Area A = 9.24263 m2
Wind force F = 1.21x0.85x0.7x9.242625
= 6.64 kN

2) Wind force on Longitudinal Beam @ EL. 10.5 m level

Spacing of the Pipe rack Main frame L = 7 m (section: IPE300/IPE450


Depth of the longitudinal beam d = 0.375 m (Depth: 14.7 Inch)
Force Coefficient for flexural members Cf = 1.8 As per SABP-006,Cl. 4.1

Projected Area A = 0.375 m2


Wind force F = qz G Cf Af
= 1.21x0.85x1.8x0.38
= 0.58 kN/m

3) Wind force on Longitudinal Beam @ EL. 12.40 m level

Spacing of the Pipe rack Main frame L = 7 m (section: IPE300/IPE450


Depth of the longitudinal beam d = 0.375 m (Depth: 14.7 Inch)
Force Coefficient for flexural members Cf = 1.8 As per SABP-006,Cl. 4.1

Projected Area A = 0.375 m2


Wind force F = qz G Cf Af
= 0.58 kN/m
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 3 of 3
PROJECT: PETRO RABIGH, UOU PROJECT Rev Date Originator Checker Approver

CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan


SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001

4) Wind force on Column


Spacing of the Pipe rack Main frame L = 7 m
Force Coefficient for columns Cf = 2 (section: HE400A
Width of the column d = 0.300 m (Width: 12 Inch)
As per SABP-006,Cl. 4.1
Projected Area A = 0.300 m2
Wind force F = qz G Cf Af
= 1.21x0.85x2x0.3
= 0.55 kN/m

6) Wind force on Vertical Bracings up to EL. 12.40 m level

Length of the bracing L = 6 m


Force Coefficient for bracing Cf = 1.8 (section: IPE400 -Tee
Depth of the bracing member d = 0.1778 m (Depth: 7 Inch)
As per SABP-006,Cl. 4.1
Projected Area A = 0.1778 m2
Wind force F = qz G Cf Af
= 1.207x0.85x1.8x0.178
= 0.28 kN/m

Note:1) Wind load is not applied in the longitudinal direction


2) Wind loads are applied based on no-sheilding effect
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 1 of 3
PROJECT: PETRO RABIGH, UOU PROJECT Rev Date Originator Checker Approver

CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan


SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001

APPENDIX - C
Wind Load Calculation

CALC. NO: B36 M BE - 867623 Rev 0


FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 2 of 3
PROJECT: PETRO RABIGH, UOU PROJECT Rev Date Originator Checker Approver

CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan


SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001

Wind Load Analysis


Load data and calculation is based on ASCE 7-02

Basic Wind Speed V = 93 mph = 41.59 m/sec Ref SAES-A-112 Table 1-Rabigh Plant Site
Exposure Category(A,B,C or D) = C Ref SAES-A-112 Table 1-Rabigh Plant Site
Building & other structure Category = IV Ref SABP-006, Cl.3.6
Height of the Structure h= 18.35 m (EL.20.95-EL.2.600)

Topographic Factor Kzt = 1 Ref SABP-006, Cl.3.6


Velocity Exposure Coefficient Kz = 1.16 Ref.Table 6.3-ASCE 7-02
Wind Directionality Factor Kd = 1 Ref Table 6.4-ASCE 7-02
Gust Effect Factor Gf = 0.85 Ref. SABP-006, Cl.3.7
Importance Factor I = 1.15 Ref Table 6.1-ASCE 7-02

Eqn. 6-1 Velocity Pressure qz = 0.613 Kz Kzt KdV² I


= 1414.58 N/m²
= 1.41 kN/m²
Eq 6-25 Design Wind Force F= qz Gf Cf Af
where Af = Projected Area for pipes
= L [ d + 10%(W)] As per SABP-006,Cl. 4.1
Cf = Force Coefficient
1) Wind force on Pipes
Width of the Pipe Rack W = 0.2 m
Spacing of the Pipe rack Main frame L = 6.125 m
Force Coefficient for pipes Cf = 0.7 As per SABP-006,Cl. 4.1.3

Force to be applied @ 20.95 EL. F = qz Gf Cf Af


Largest pipe dia In this level d = 0.152 m (Pipe dia = 6" , insulation= mm)
Projected Area A = 1.0535 m2
Wind force F = 1.41x0.85x0.9x1.0535
= 0.89 kN

2) Wind force on Longitudinal Beam @ EL. 14.00 m level

Spacing of the Pipe rack Main frame L = 7 m (section: IPE300


Depth of the longitudinal beam d = 0.30 m (Depth: 12 Inch)
Force Coefficient for flexural members Cf = 1.8 As per SABP-006,Cl. 4.1

Projected Area A = 0.300 m2


Wind force F = qz G Cf Af
= 1.41x0.85x1.8x0.3
= 0.54 kN/m

3) Wind force on Longitudinal Beam @ EL. 20.95 m level

Spacing of the Pipe rack Main frame L = 7 m (section: IPE300/HE280A


Depth of the longitudinal beam d = 0.300 m (Depth: 12 Inch)
Force Coefficient for flexural members Cf = 1.8 As per SABP-006,Cl. 4.1

Projected Area A = 0.300 m2


Wind force F = qz G Cf Af
= 0.54 kN/m
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 3 of 3
PROJECT: PETRO RABIGH, UOU PROJECT Rev Date Originator Checker Approver

CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan


SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001

4) Wind force on Column


Spacing of the Pipe rack Main frame L = 7 m
Force Coefficient for columns Cf = 2 (section: HE400A
Width of the column d = 0.300 m (Width: 12 Inch)
As per SABP-006,Cl. 4.1
Projected Area A = 0.300 m2
Wind force F = qz G Cf Af
= 1.41x0.85x2x0.3
= 0.65 kN/m

6) Wind force on Vertical Bracings Above EL. 12.40 m level

Length of the bracing L = 6 m


Force Coefficient for bracing Cf = 1.8 (section: IPE400 -Tee
Depth of the bracing member d = 0.1778 m (Depth: 7 Inch)
As per SABP-006,Cl. 4.1
Projected Area A = 0.1778 m2
Wind force F = qz G Cf Af
= 1.415x0.85x1.8x0.178
= 0.33 kN/m

Note:1) Wind load is not applied in the longitudinal direction


2) Wind loads are applied based on no-sheilding effect
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 1 of 3
PROJECT: PETRO RABIGH, UOU PROJECT Rev Date Originator Checker Approver

CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan

SAFETY CALC. YES


CALC. NO 2411-8320-CA-WA15-0001

APPENDIX - D
Seismic analysis-load data

CALC. NO: B36 M BE - 867623 Rev 0


FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 2 of 3
PROJECT: PETRO RABIGH, UOU PROJECT Rev Date Originator Checker Approver

CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan

SAFETY CALC. YES


CALC. NO 2411-8320-CA-WA15-0001
Seismic Analysis

Load data
Seismic Load is calculated as per ASCE-7-02

Site Data:-
Seismic Load data is as per SAES-A-112 Rev. D2 and SAES-M-001-AMD, Rev.D2
Seismic use group: II soil type : D

Therefore From ASCE -7-02


Response modification coefficient RWX = 3.50 Table 9. 5.2.2, ASCE 7-02
Response modification coefficient RWZ = 5.00 Table 9. 5.2.2, ASCE 7-02
Importance factor I = 1.25 SAES-M-001-AMD, Rev.2, Cl. 5.5.4

Response acceleration at short period Ss = 0.176 SAES-A-112, Rev. D2, Cl. 4.4
Response acceleration at one second S1 = 0.07 SAES-A-112, Rev. D2, Cl. 4.4
Height above base hn = 18.35 m (Max Ht taken)

Basic equations
Basic equations used for the base shear calculation of nonbuilding structures are as follows

Base shear V = Cs * W Eq. 9.5.5.2-1


Cs = SD1
(R/I) Eq. 9.5.5.2-1-1
Cs,max = SD1
T(R/I) Eq. 9.5.5.2-1-2
and Cs,min = 0.14*SDS*I Eq. 9.14.5.1-1
or = 0.8*S1*I/R Eq. 9.14.5.1-2

where Cs = Seismic Response coefficient.


Fa = Function of site class and Ss, From Table 9.4.1.2.4a
= 1.6
SMS = The maximum considered earthquake spectral response
acceleration for short periods.
= Fa* Ss Eq. 9.4.1.2.4-1
SDS = The design spectral responese acceleration in short period
= (2/3)*SMS = 0.19 Eq. 9.4.1.2.5-1
R= Response modification factor.
I= Occupancy importance factor.
Fv = Function of site class and S1, From Table 9.4.1.2.4b
= 2.4
SM1 = The maximum considered earthquake spectral response
acceleration for one second period.
= Fv*S1 Eq. 9.4.1.2.4-2
SD1 = The design spectral responese acceleration in one second
= (2/3)*SM1 = 0.11 Eq. 9.4.1.2.5-2

T= Fundamental period of the structure. (As per section 9.5.5.3)


(Calculation by Rayleigh Method)
Tmax = Cu*Ta
Cu = Coefficient for upper limit on calculated period = 1.676
x
Ta = Ct*(hn) = Approximate fundamental time period
Ct = 0.028 As per Table 9.5.5.3.2
x = 0.8 As per Table 9.5.5.3.2
hn = Height of the structure above the base to the heighest level in ft.
W = Total Seismic load (sel weight, piping dead load, cable tray dead load,
piping opereating load and cable tray live load)

The piperack is designed for earthquake resistance using Staad pro 2004 in accordance with International Building Code -2003

CHECK
Calculations

Total load W = 1648.52 kN


Time period Ta = 0.743 s
Tmax = 1.245 s
T = 0.996 s (As per Staad result-by Rayleigh Method)
T used = 0.996 s (As per Cl.9.5.5.3)
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 3 of 3
PROJECT: PETRO RABIGH, UOU PROJECT Rev Date Originator Checker Approver

CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan

SAFETY CALC. YES


CALC. NO 2411-8320-CA-WA15-0001
In X Direction
V = 0.067 *W
= 110.529 kN

Vmax = 0.040 *W
= 66.206 kN

Vmin = 0.033 *W
= 54.159 kN

So V = 0.040 *W
= 66.206 kN

In Z Direction
Time period Ta = 0.743 s
Tmax = 1.245 s
T = 0.392 s (As per Staad result-by Rayleigh Method)
T = 0.392 s (As per Cl.9.5.5.3)

Vz = 0.047 *W
= 77.371 kN

Vmax = 0.071 *W
= 117.751 kN

Vmin = 0.033 *W
= 54.159 kN

So V = 0.047 *W
= 77.371 kN

Coefficient Load(W)
Empirical formula
Load case By Staad Staad result
Staad DL (kN)
Formulae
Seismic force
0.0402 0.039 1648.52 1648.52 66.206 65.03
(X Dir.)

Seismic force
0.047 0.047 1648.52 1648.52 77.371 78.3
(Z Dir.)
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No :
E1 OF E3
PROJECT: PETRORabigh, UOU PROJECT Rev. Date Originator Checker Approver
CONTRACT NO 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001

APPENDIX - E
Effective Length Factor Calculation
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No :
E2 OF E3
PROJECT: PETRORabigh, UOU PROJECT Rev. Date Originator Checker Approver
CONTRACT NO 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
Calculation is based on AISC-Manual of steel construction- ASD-9th Edition, Part 3, Column Design
and ACI 318- 02 Commentary.

For sway frames


If Ψm < 2 k = (20-Ψm)Sqrt(1+Ψ m)
20
If Ψm > 2 k = 0.9*Sqrt(1+Ψm)
Σ(Ιc/Lc)
Ψ = Σ(Ι /L )
b b

where Σ indicates the summation of all members rigidly connected to that joint and lying in the plane
in which buckling of the column is being considered.
Ιc = Moment of ineria of the column
Lc = Unsupported length of first column
Ιb = Moment of ineria of the beam.
Lb = Unsupported length of the beam.
Ψm = Average of the Ψ values at the two ends of the
compression member

Calculation

Case: : Side sway uninhibited


Support Condition : Pinned

FOR 4 LATERAL BEAMS

4
Iz= 13670 inch
ψ = 3.08
# 13670 5.6
Kz = 2.8 Kz = 2.3

8.55 HE280A
4
Iz= 28860 inch
ψ = 8.04
# 28860 8.7
IPE360
1.9
4
Iz= 28860 inch
ψ = 9.29
# 28860 9
Kz = 2.8

#
IPE360
4.6
4
Iz= 25170 inch
ψ = 8.67
# 25170 9.3

HE300B
Kz = 2.89

2.58
4
Iz= 45070 inch

# 45070
HE400A

Support : Pinned ψ = 10.00

8
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No :
E3 OF E3
PROJECT: PETRORabigh, UOU PROJECT Rev. Date Originator Checker Approver
CONTRACT NO 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
FOR 3 LATERAL BEAMS

ψ = 4.93
# 28860 6
Kz = 2.4

#
IPE360
1.9
4
Iz= 28860 inch
ψ = 6.97
# 28860 6.9
Kz = 2.5

IPE360
4.6
4
Iz= 25170 inch
ψ = 6.91
# 25170 8.5
HE300B
Kz = 2.77

2.35
4
Iz= 45070 inch
# 45070
HE400A

Support : Pinned ψ = 10.00

6
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No :
E1 OF E1
PROJECT: PETRORabigh, UOU PROJECT Rev. Date Originator Checker Approver
CONTRACT NO 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
FOR 4 LATERAL BEAMS

4
Iz= 13670 inch
ψ = 3.08
# 13670 5.6
Kz = 2.8 Kz = 2.3

8.6 HE280A
4
Iz= 28860 inch
ψ = 8.04
# 28860 8.7
IPE360
1.9
4
Iz= 28860 inch
ψ = 9.29
# 28860 7.7
Kz = 2.7

#
IPE360
4.6
4
Iz= 25170 inch
ψ = 6.18
# 25170 8.1

HE300B
= 2.71

4.68

4
Kz

Iz= 45070 inch


# 45070
HE400A

Support : Pinned ψ = 10.00

FOR 3 LATERAL BEAMS

ψ = 10.41
# 13670 13
Kz = 3.3

#
HE280A
1.9
4
Iz= 13670 inch
ψ = 14.71
# 13670 11
Kz = 3.1

HE280A
4.6
4
Iz= 25170 inch
ψ = 6.91
# 25170 8.5
HE300B
Kz = 2.77

2.35
4
Iz= 45070 inch
# 45070
HE400A

Support : Pinned ψ = 10.00

6
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 1 OF 3
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001

APPENDIX F
STAAD MODEL
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 2 OF 3
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001

Y
X Loa d 31
Z

TYPICAL 3D MODEL

Y X Load 31 Y X Load 31
Z Z

PLAN AT EL.+10.500 M PLAN AT EL +12.40M

Y X Load 31
Z Y
X Z Load 31

PLAN AT EL+14.00M ELEVATION ALONG GRID 1


FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 3 OF 3
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001

Y
X Z Load 31

ELEVATION ALONG GRID 2

Y Y
Z X Load 31 Z X Load 31

CROSS SECTION ON GRIDS A & B CROSS SECTION ON GRIDS C & D


FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 1 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001

APPENDIX G
STAAD INPUT AND OUTPUT FILE
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 2 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001

****************************************************
* *
* STAAD.Pro *
* Version 2004 Bld 1002.UK.1001 *
* Proprietary Program of *
* Research Engineers, Intl. *
* Date= JAN 3, 2007 *
* Time= 18:46:32 *
* *
* USER ID: Foster Wheeler *
****************************************************

1. STAAD SPACE
INPUT FILE: WA15.STD
2. START JOB INFORMATION
3. JOB NAME WA15
4. JOB CLIENT PETRO RABIGH
5. ENGINEER NAME PRAKASH
6. CHECKER NAME ASHOKAN
7. ENGINEER DATE 01-NOV-06
8. END JOB INFORMATION
9. INPUT WIDTH 79
10. UNIT METER KN
11. JOINT COORDINATES
12. 1 -7 3.55 -7; 2 0 3.55 -7; 3 -7 3.55 -11.5; 4 0 3.55 -11.5; 5 -7 3.325 -22
13. 6 0 3.325 -22; 9 -7 10.5 -7; 10 0 10.5 -7; 11 -7 12.4 -7; 12 0 12.4 -7
14. 13 -3.5 12.4 -7; 18 -7 10.5 -11.5; 19 0 10.5 -11.5; 20 -7 12.4 -11.5
15. 21 0 12.4 -11.5; 22 -3.5 12.4 -11.5; 27 -7 10.5 -22; 28 0 10.5 -22
16. 29 -7 12.4 -22; 30 0 12.4 -22; 31 -3.5 12.4 -22; 36 -7 10.5 -29; 37 0 10.5 -29
17. 38 -7 12.4 -29; 39 0 12.4 -29; 40 -3.5 12.4 -29; 55 0 10.5 -13.75
18. 56 0 10.5 -16.5; 57 0 10.5 -19.25; 58 0 12.4 -13.75; 59 0 12.4 -16.5
19. 60 0 12.4 -19.25; 61 -7 10.5 -13.75; 62 -7 10.5 -16.5; 63 -7 10.5 -19.25
20. 64 -7 12.4 -13.75; 65 -7 12.4 -16.5; 66 -7 12.4 -19.25; 68 -3.5 10.5 -7
21. 70 -3.5 10.5 -11.5; 77 -3.5 10.5 -13.75; 78 -3.5 10.5 -16.5
22. 79 -3.5 10.5 -19.25; 80 -3.5 10.5 -22; 82 -3.5 10.5 -29; 91 -3.5 12.4 -13.75
23. 92 -3.5 12.4 -16.5; 93 -3.5 12.4 -19.25; 117 0 10.5 -9.25; 118 -3.5 10.5 -9.25
24. 119 -7 10.5 -9.25; 120 0 10.5 -24.5; 121 0 10.5 -26.5; 122 -3.5 10.5 -24.5
25. 123 -7 10.5 -24.5; 124 -3.5 10.5 -26.5; 125 -7 10.5 -26.5; 126 0 12.4 -9.25
26. 127 -3.5 12.4 -9.25; 128 -7 12.4 -9.25; 129 0 12.4 -24.5; 130 0 12.4 -26.5
27. 131 -3.5 12.4 -24.5; 132 -7 12.4 -24.5; 133 -3.5 12.4 -26.5; 134 -7 12.4 -26.5
28. 139 -2.5 12.4 -7; 140 -2.5 12.4 -11.5; 141 -2.5 12.4 -22; 142 -2.5 12.4 -29
29. 143 0 20.95 -7; 144 0 20.95 -11.5; 145 0 20.95 -22; 146 0 20.95 -29
30. 147 -2.5 14 -7; 148 -2.5 14 -11.5; 149 -2.5 14 -22; 150 -2.5 14 -29
31. 151 0 14 -7; 152 0 14 -11.5; 153 0 14 -22; 154 0 14 -29; 155 0 14 -13.75
32. 156 0 14 -16.5; 157 0 14 -19.25; 158 -2.5 14 -13.75; 159 -2.5 14 -16.5
33. 160 -2.5 14 -19.25; 161 0 14 -24.5; 162 0 14 -26.5; 163 -2.5 14 -24.5
34. 164 -2.5 14 -26.5; 165 0 14 -9.25; 166 -2.5 14 -9.25; 169 0 20.95 -25.5
35. 170 0 5.9 -11.5; 171 -7 5.9 -11.5; 172 0 5.9 -7; 173 -7 5.9 -7
36. 178 0 17.325 -29; 179 0 17.325 -22; 180 0 17.325 -25.5; 181 -7 20.95 -29
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 3 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
37. 190 0 8.4 -7; 191 -7 8.4 -7; 192 0 8.4 -4.4; 193 -7 8.4 -4.4
38. 194 -3.5 8.4 -4.5; 195 -3.5 8.4 -7; 196 0 11.4 -7; 197 -7 11.4 -7
39. 198 0 11.4 -4.4; 199 -7 11.4 -4.4; 200 -3.5 11.4 -7; 201 -3.5 11.4 -4.4
40. 202 0 7.845 -29; 203 -7 7.845 -29; 204 0 7.845 -29.8; 205 -7 7.845 -29.8
41. 216 -7 10.5 -25.5; 217 0 10.5 -25.5; 218 0 14 -25.5; 219 0 12.4 -23.9
42. 220 0 12.4 -27.1; 221 -7 12.4 -25.5; 222 0 9.4 -7; 223 -7 9.35 -7
43. 224 -7 12.4 -23.75; 225 -7 12.4 -27.25; 226 0 5.9 -29; 227 0 5.9 -22
44. 228 0 8 -22; 229 0 8 -29; 230 0 5.9 -25.5; 231 0 8 -25.5; 232 -7 5.9 -29
45. 233 -7 5.9 -22; 234 -7 5.9 -25.5; 235 -7 8 -29; 236 -7 8 -22; 237 -7 8 -25.5
46. 238 -7 1.225 -29; 239 0 1.225 -29; 240 -7 20.95 -22; 241 -7 17.325 -29
47. 242 -7 17.325 -22; 243 -7 17.325 -25.5; 244 -7 20.95 -25.5; 245 -7 3.563 -29
48. 246 0 3.563 -29; 249 -7 3.5625 -25.5; 250 0 3.5625 -25.5
49. MEMBER INCIDENCES
50. 1 1 173; 2 2 172; 3 9 197; 4 10 196; 5 10 68; 6 12 139; 14 3 171; 15 4 170
51. 16 18 20; 17 19 21; 18 19 70; 19 21 140; 27 5 233; 28 6 227; 29 27 29
52. 30 28 30; 31 28 80; 32 30 141; 40 238 245; 41 239 246; 42 36 38; 43 37 39
53. 44 37 82; 45 39 142; 53 10 117; 54 19 55; 55 28 120; 56 9 119; 57 18 61
54. 58 27 123; 59 12 126; 60 21 58; 61 30 219; 62 11 128; 63 20 64; 64 29 224
55. 89 55 56; 90 56 57; 91 57 28; 92 58 59; 94 59 60; 96 60 30; 102 61 62
56. 103 62 63; 104 63 27; 105 64 65; 107 65 66; 109 66 29; 128 68 9; 131 70 18
57. 132 68 118; 133 55 77; 135 57 79; 139 56 78; 149 77 61; 150 70 77; 151 78 62
58. 152 77 78; 153 79 63; 154 78 79; 155 80 27; 156 79 80; 158 80 122; 159 82 36
59. 162 58 91; 163 59 92; 164 60 93; 180 13 127; 181 91 64; 182 22 91; 183 92 65
60. 184 91 92; 185 93 66; 186 92 93; 187 93 31; 189 31 131; 192 18 77; 193 77 62
61. 194 62 79; 195 79 27; 201 20 91; 202 91 65; 203 65 93; 204 93 29; 255 117 19
62. 256 118 70; 257 117 118; 258 119 18; 259 118 119; 261 120 217; 262 121 37
63. 263 122 124; 264 120 122; 265 123 216; 266 122 123; 267 124 82; 268 121 124
64. 269 125 36; 270 124 125; 272 126 21; 273 127 22; 274 126 127; 275 128 20
65. 276 127 128; 277 129 130; 278 130 220; 279 131 133; 280 129 131; 281 132 221
66. 282 131 132; 283 133 40; 284 130 133; 285 134 225; 286 133 134; 289 13 11
67. 290 22 20; 291 31 29; 292 40 38; 293 139 13; 294 140 22; 295 141 31
68. 296 142 40; 297 12 151; 298 21 152; 299 30 153; 300 39 154; 301 143 144
69. 303 145 169; 304 139 147; 305 140 148; 306 141 149; 307 142 150; 308 147 166
70. 309 148 158; 310 149 163; 311 151 143; 312 152 144; 313 151 165; 314 153 179
71. 315 152 155; 316 154 178; 317 153 161; 318 154 150; 319 153 149; 320 152 148
72. 321 151 147; 322 155 156; 323 156 157; 324 157 153; 325 158 159; 326 155 158
73. 327 159 160; 328 156 159; 329 160 149; 330 157 160; 331 161 218; 332 162 154
74. 333 163 164; 334 161 163; 335 164 150; 336 162 164; 337 165 152; 338 166 148
75. 339 165 166; 340 152 158; 341 158 156; 342 156 160; 343 160 153; 353 153 163
76. 354 163 162; 355 162 150; 356 169 146; 357 179 169; 358 178 169; 364 170 19
77. 365 171 18; 366 172 190; 367 173 191; 368 173 171; 369 172 170; 374 144 145
78. 378 178 146; 379 179 145; 380 179 180; 381 180 178; 382 153 180; 383 154 180
79. 384 146 181; 385 38 241; 406 190 222; 407 191 223; 408 190 192; 409 191 193
80. 410 173 193; 411 172 192; 412 190 195; 413 192 194; 414 194 193; 415 195 191
81. 416 194 195; 417 194 191; 418 194 190; 419 196 12; 420 197 11; 421 196 198
82. 422 197 199; 425 198 201; 426 196 200; 427 200 197; 428 201 199; 429 201 200
83. 430 201 197; 431 196 201; 432 202 229; 433 203 235; 434 202 204; 435 203 205
84. 436 204 205; 477 238 249; 479 239 250; 480 216 125; 481 217 121; 482 228 217
85. 483 229 217; 484 236 216; 485 235 216; 486 218 162; 487 219 129; 488 28 219
86. 489 219 218; 490 220 39; 491 37 220; 492 220 218; 493 221 134; 496 222 10
87. 497 223 9; 500 120 80; 501 123 80; 502 121 122; 503 125 122; 504 37 124
88. 505 36 124; 506 129 31; 507 132 31; 508 130 131; 509 134 131; 510 39 133
89. 511 38 133; 512 192 198; 513 193 199; 518 27 224; 519 216 224; 520 216 225
90. 521 36 225; 522 226 232; 523 227 233; 524 170 171; 525 172 173; 526 224 132
91. 527 225 38; 528 226 202; 529 227 228; 530 228 28; 531 229 37; 532 229 231
92. 533 226 230; 534 230 227; 535 231 228; 536 228 230; 537 232 203; 538 233 236
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 4 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
93. 539 232 234; 540 234 233; 541 235 36; 543 236 27; 544 235 237; 545 237 236
94. 546 234 236; 551 217 219; 552 217 220; 553 29 242; 554 181 244; 555 241 181
95. 556 242 240; 557 241 243; 558 243 242; 559 244 240; 560 29 243; 561 38 243
96. 562 242 244; 563 241 244; 564 145 240; 566 245 232; 567 246 226; 568 232 249
97. 569 226 250; 570 249 233; 571 250 227; 572 245 249; 573 246 250; 574 234 237
98. 575 230 231
99. DEFINE MATERIAL START
100. ISOTROPIC STEEL
101. E 2.05E+008
102. POISSON 0.3
103. DENSITY 76.8195
104. ALPHA 1.2E-005
105. DAMP 0.03
106. END DEFINE MATERIAL
107. MEMBER PROPERTY EUROPEAN
108. 53 55 56 58 59 62 255 258 261 262 265 269 272 275 301 308 TO 310 313 315 317 -
109. 322 TO 325 327 329 331 TO 333 335 337 338 368 369 480 481 -
110. 486 TABLE ST IPE300
111. 1 TO 4 14 TO 17 27 TO 30 40 TO 43 297 TO 300 311 312 314 316 364 TO 367 378 -
112. 379 385 406 407 419 420 432 433 496 497 528 TO 531 537 538 541 543 553 555 -
113. 556 566 567 TABLE ST HE400A
114. 192 TO 195 201 TO 204 326 328 330 334 336 339 TO 343 353 TO 355 417 418 430 -
115. 431 500 TO 511 TABLE ST L130X130X12
116. 132 150 152 154 156 158 180 182 184 186 187 189 256 263 267 273 279 283 416 -
117. 429 TABLE ST HE100A
118. 304 TO 307 318 TO 321 TABLE ST HE140A
119. 61 64 277 278 281 285 303 356 380 381 487 490 493 526 527 554 557 TO 558 -
120. 559 TABLE ST IPE360
121. 133 135 139 149 151 153 162 TO 164 181 183 185 257 259 264 266 268 270 274 -
122. 276 280 282 284 286 TABLE ST IPE300
123. 18 19 131 290 294 374 384 532 TO 535 539 540 544 545 564 TABLE ST HE280A
124. 5 6 31 32 44 45 128 155 159 289 291 TO 293 295 296 TABLE ST IPE360
125. 54 57 60 63 89 TO 92 94 96 102 TO 105 107 109 TABLE ST IPE450
126. 408 409 412 TO 415 421 422 425 TO 428 434 TO 436 512 513 TABLE ST HE200A
127. 522 TO 525 TABLE ST HE300B
128. 357 358 382 383 410 411 482 TO 485 488 489 491 492 518 TO 521 536 546 551 -
129. 552 560 TO 563 568 569 572 TO 575 TABLE T IPE400
130. 477 479 570 571 TABLE ST IPE400
131. CONSTANTS
132. BETA 90 MEMB 436 477 479 522 570 571
133. MATERIAL STEEL MEMB 1 TO 6 14 TO 19 27 TO 32 40 TO 45 53 TO 64 89 TO 92 94 -
134. 96 102 TO 105 107 109 128 131 TO 133 135 139 149 TO 156 158 159 162 TO 164 -
135. 180 TO 187 189 192 TO 195 201 TO 204 255 TO 259 261 TO 270 272 TO 286 289 -
136. 290 TO 301 303 TO 343 353 TO 358 364 TO 369 374 378 TO 385 406 TO 422 425 -
137. 426 TO 436 477 479 TO 493 496 497 500 TO 513 518 TO 541 543 TO 546 -
138. 551 TO 564 566 TO 575
139. SUPPORTS
140. 1 TO 6 238 239 PINNED
141. MEMBER RELEASE
142. 53 TO 64 132 133 135 139 150 152 154 156 158 162 TO 164 180 182 184 186 187 -
143. 189 256 257 263 264 267 268 273 274 279 280 283 284 301 303 TO 310 313 315 -
144. 317 326 328 330 334 336 339 368 369 374 380 408 409 412 413 416 421 422 425 -
145. 426 429 436 512 513 532 533 539 544 554 557 START MY MZ
146. 91 96 104 109 132 149 TO 154 156 158 180 TO 187 189 255 256 258 259 262 263 -
147. 266 267 269 270 272 273 275 276 279 282 283 286 301 324 326 328 TO 330 332 -
148. 334 TO 339 356 368 369 374 381 414 TO 416 427 TO 429 436 490 512 513 527 -
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 5 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
149. 534 535 540 545 558 559 END MY MZ
150. 357 358 382 383 410 411 482 TO 485 488 489 491 492 518 TO 521 536 546 551 -
151. 552 560 TO 563 568 569 572 TO 575 START MY MZ
152. 357 358 382 383 410 411 482 TO 485 488 489 491 492 518 TO 521 536 546 551 -
153. 552 560 TO 563 568 TO 575 END MY MZ
154. MEMBER TRUSS
155. 192 TO 195 201 TO 204 340 TO 343 353 TO 355 417 418 430 431 500 TO 511
156. *******************************************************************************
157. *-----------------------------------------------------------------------------
158. *PRIMARY LOAD CASES
159. *-----------------------------------------------------------------------------
160. *LOAD 1 SEISMIC LOAD IN +X DIRECTION E(+X)
161. *LOAD 2 SEISMIC LOAD IN -X DIRECTION E(-X)
162. *LOAD 3 SEISMIC LOAD IN +Z DIRECTION E(+Z)
163. *LOAD 4 SEISMIC LOAD IN -Z DIRECTION E(-Z)
164. *-----------------------------------------------------------------------------
165. *LOAD 11 DEAD LOAD (SELF WEIGHT OF STRUCTURE) DS
166. *LOAD 12 OPERATING LOAD- PIPING/EQUIPMENT DO
167. *-----------------------------------------------------------------------------
168. *LOAD 21 DEAD LOAD- PIPING/EQUIPMENT DE
169. *LOAD 22 PIPING TEST LOAD DT
170. *-----------------------------------------------------------------------------
171. *LOAD 31 THERMAL-ANCHOR LOAD IN +VE DIR. AF1
172. *LOAD 32 THERMAL-ANCHOR LOADI IN -VE DIR. AF2
173. *LOAD 33 THERMAL-FRICTION- IN +VE DIR. FF1
174. *LOAD 34 THERMAL-FRICTION- IN -VE DIR. FF2
175. *LOAD 35 TEMPERATURE LOAD T
176. *---------------------------------------------------- -------------------------
177. *LOAD 41 WIND LOAD IN +X DIRECTION W(+X)
178. *LOAD 42 WIND LOAD IN -X DIRECTION W(-X)
179. *-----------------------------------------------------------------------------
180. *LOAD 51 SURGE LOAD +X S(X)
181. *LOAD 52 SURGE LOAD -X S(-X)
182. ******************************************************************************
183. *LOADING
184. *****************************************************************************
185. *SEISMIC LOAD
186. *CALCULATIONS ARE AS PER ASCE-7 2002
187. **REFER DOCUMENT NO: 2411-8320-CA-CA10-0064-APPENDIX D
188. DEFINE IBC 2003
189. SDS 0.19 SD1 0.11 S1 0.07 IE 1.25 RX 3.5 RZ 5 SCLASS 4
190. SELFWEIGHT
191. MEMBER WEIGHT
192. *******FOR BEAMS AT EL.+10.500 & 12.4 M
193. *FOR PIPES <12"
194. *UDL=1.9*3=5.7 KN/M
195. 5 6 18 19 31 32 44 45 128 131 133 135 139 149 151 153 155 159 162 TO 164 181 -
196. 183 185 257 259 264 266 268 270 274 276 280 282 284 286 289 TO 296 UNI 5.7
197. *FOR BEAMS AT +14.00M LVL
198. * FOR SINGLE LEVEL CABLE TRAY OPERATING DEAD LOAD = 1.0 KPA
199. * 1.0*0.5*3 = 1.5KN (0.5M WIDTH OF TRAY AND 3M BEAM SPACING ARE CONSIDERED )
200. 318 TO 321 326 328 330 334 336 339 CON 1.5 0.5
201. 318 TO 321 326 328 330 334 336 339 CON 1.5 1.5
202. *FOR PIPES >12"
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 6 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
203. *24"-LS-O000-037-1CS1P05-IH (S10-S11-A)
204. *G
205. 533 CON 20 2.2
206. *24"-LS-O000-037-1CS1P05-IH (S10-S11-A)
207. *G
208. 539 CON 43.86 2.2
209. *24"-LS-O000-037-1CS1P05-IH
210. *G-(5.7*24"*25.4/1000)=16.176KN
211. 291 CON 16.176 2.79
212. *24"-LS-O000-037-1CS1P05-IH
213. *G-(5.7*24"*25.4/1000)=11.756KN
214. 290 CON 11.756 2.79
215. *24"-MS-O000-017-3CS1P05-IH
216. *G
217. 533 CON 27.71 1.225
218. *24"-MS-O000-017-3CS1P05-IH
219. *G-(5.7*24"*25.4/1000)=9.63KN
220. 280 CON 9.63 0.92
221. *24"-MS-O000-017-3CS1P05-IH
222. *G-(5.7*24"*25.4/1000)=9.186KN
223. 163 CON 9.186 0.92
224. *24"-MS-O000-017-3CS1P05-IH
225. *G-(5.7*24"*25.4/1000)=3.066KN
226. 19 CON 3.066 0.92
227. *24"-MS-O000-017-3CS1P05-IH
228. *G-(5.7*24"*25.4/1000)=10.116KN
229. 6 CON 10.116 0.92
230. *8"-G-O000-017-3CC1P01-NI
231. *G-(5.7*8"*25.4/1000)=8.462KN
232. 44 CON 8.462 1.4
233. *8"-G-O000-017-3CC1P01-NI
234. *G-(5.7*8"*25.4/1000)=0.792KN
235. 264 CON 0.792 1.4
236. *8"-G-O000-017-3CC1P01-NI
237. *G-(5.7*8"*25.4/1000)=1.352KN
238. 31 CON 1.352 1.4
239. *8"-G-O000-017-3CC1P01-NI
240. *G-(5.7*8"*25.4/1000)=2.322KN
241. 135 CON 2.322 1.4
242. *8"-G-O000-017-3CC1P01-NI
243. *G-(5.7*8"*25.4/1000)=1.068KN
244. 139 CON 1.068 1.4
245. *8"-G-O000-017-3CC1P01-NI
246. *G-(5.7*8"*25.4/1000)=1.512KN
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 7 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
247. 133 CON 1.512 1.4
248. *8"-G-O000-017-3CC1P01-NI
249. *G-(5.7*8"*25.4/1000)=0.922KN
250. 18 CON 0.922 1.4
251. *8"-G-O000-017-3CC1P01-NI
252. *G-(5.7*8"*25.4/1000)=5.91KN
253. 5 CON 5.91 1.4
254. *8"-HS-O000-018-6CS1P05-IH
255. *G-(5.7*8"*25.4/1000)=3.072KN
256. 45 CON 3.072 1.8
257. *8"-HS-O000-018-6CS1P05-IH
258. *G=11.07KN
259. 533 CON 11.07 0.5
260. *8"-HS-O000-018-6CS1P05-IH
261. *G-(5.7*8"*25.4/1000)=6.222KN
262. 284 CON 6.22 1.8
263. *8"-HS-O000-018-6CS1P05-IH
264. *G-(5.7*8"*25.4/1000)=6.572KN
265. 163 CON 6.572 1.8
266. *8"-HS-O000-018-6CS1P05-IH
267. *G-(5.7*8"*25.4/1000)=2.222KN
268. 19 CON 2.222 1.8
269. *8"-HS-O000-018-6CS1P05-IH
270. *G-(5.7*8"*25.4/1000)=8.382KN
271. 6 CON 8.382 1.8
272. *LOAD FROM FLARE LINE
273. *FOR 6"-RLL-S130-XXX-1CC2P03-NI
274. 356 CON 3.52 2
275. 303 CON 3.12 0.01
276. 374 CON 4.69 2.25
277. *IN PROJECTED AREA
278. *FROM 24"-LS-O000-037-1CS1P05-IH
279. 413 414 425 428 UNI 5.7
280. 436 UNI 2
281. SET NL 100
282. LOAD 1 SEISMIC LOAD +X
283. IBC LOAD X 1
284. PERFORM ANALYSIS

PROBLEM STATISTICS
-----------------------------------

NUMBER OF JOINTS/MEMBER+ELEMENTS/SUPPORTS = 152/ 302/ 8


ORIGINAL/FINAL BAND-WIDTH= 132/ 21/ 129 DOF
TOTAL PRIMARY LOAD CASES = 1, TOTAL DEGREES OF FREEDOM = 888
SIZE OF STIFFNESS MATRIX = 115 DOUBLE KILO-WORDS
REQRD/AVAIL. DISK SPACE = 13.7/ 61586.0 MB

************************************************************
* IBC 2003 SEISMIC LOAD ALONG X : *
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 8 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
* CT = 0.035 Cu = 1.660 *
* TIME PERIODS : *
* Ta = 0.799 T = 0.996 Tuser = 0.000 *
* TIME PERIOD USED (T) = 0.996 *
* LOAD FACTOR = 1.000 *
* DESIGN BASE SHEAR = 1.000 X 0.039 X 1648.52 *
* = 65.03 KN *
************************************************************

285. CHANGE
286. LOAD 2 SEISMIC LOAD -X
287. IBC LOAD X -1.
288. PERFORM ANALYSIS

************************************************************
* IBC 2003 SEISMIC LOAD ALONG X : *
* CT = 0.035 Cu = 1.660 *
* TIME PERIODS : *
* Ta = 0.799 T = 0.996 Tuser = 0.000 *
* TIME PERIOD USED (T) = 0.996 *
* LOAD FACTOR = -1.000 *
* DESIGN BASE SHEAR = -1.000 X 0.039 X 1648.52 *
* = -65.03 KN *
************************************************************

289. CHANGE
290. LOAD 3 SEISMIC LOAD +Z
291. IBC LOAD Z 1
292. PERFORM ANALYSIS

************************************************************
* IBC 2003 SEISMIC LOAD ALONG Z : *
* CT = 0.035 Cu = 1.660 *
* TIME PERIODS : *
* Ta = 0.799 T = 0.392 Tuser = 0.000 *
* TIME PERIOD USED (T) = 0.392 *
* LOAD FACTOR = 1.000 *
* DESIGN BASE SHEAR = 1.000 X 0.047 X 1648.52 *
* = 78.30 KN *
************************************************************

293. CHANGE
294. LOAD 4 SEISMIC LOAD -Z
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 9 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
295. IBC LOAD Z -1.
296. PERFORM ANALYSIS

************************************************************
* IBC 2003 SEISMIC LOAD ALONG Z : *
* CT = 0.035 Cu = 1.660 *
* TIME PERIODS : *
* Ta = 0.799 T = 0.392 Tuser = 0.000 *
* TIME PERIOD USED (T) = 0.392 *
* LOAD FACTOR = -1.000 *
* DESIGN BASE SHEAR = -1.000 X 0.047 X 1648.52 *
* = -78.30 KN *
************************************************************

297. CHANGE
298. *******************************************************************************
299. LOAD 11 DEAD LOAD
300. *******************************************************************************
301. *SELFWEIGHT OF THE STRUCTURE INCLUDING 10% EXTRA CONSIDERED TO ACCOUNT
302. *FOR CONNECTIONS
303. SELFWEIGHT Y -1.1
304. ***************************************************************************
305. LOAD 12 OPERATING LOAD-PIPING
306. *******************************************************************************
307. *FOR PIPES <12" , LOAD INTENSITY = 1.9 KN/M2. THIS IS AS PER SABP-007
308. *CL. 4.1.2 & 4.2.2 AND SAES -M-001 AMD CL. 5.2.4.8
309. *FOR PIPES >12" , LOAD APPLIED AS CONCENTRATED LOAD AND LOAD DATA IS AS PER
310. *PIPING INPUT DATA AND THE LOAD CALCULATION IS AS PER SABP07, CL. 4.1.2
311. *FOR CABLE TRAY, LOAD INTENSITY = 1.9 KN/M2. (AS PER SAES-M-001 -AMD CL. 5.2.5
312. *AND SABP-007 CL. 4.1.2)
313. *FUTURE PIPE LOAD OF 1.9 KN/M2 IS CONSIDERED FOR THE ANALYSIS.
314. MEMBER LOAD
315. *******FOR BEAMS AT EL.+10.500 & 12.4 M
316. *FOR PIPES <12"
317. *UDL=1.9*3=5.7 KN/M
318. 5 6 18 19 31 32 44 45 128 131 133 135 139 149 151 153 155 159 162 TO 164 181 -
319. 183 185 257 259 264 266 268 270 274 276 280 282 284 286 289 TO 295 -
320. 296 UNI GY -5.7
321. *FOR BEAMS AT +14.00M LVL
322. * FOR SINGLE LEVEL CABLE TRAY OPERATING DEAD LOAD = 1.0 KPA
323. * 1.0*0.5*3 = 1.5KN (0.5M WIDTH OF TRAY AND 3M BEAM SPACING ARE CONSIDERED )
324. 318 TO 321 326 328 330 334 336 339 CON GY -1.5 0.5
325. 318 TO 321 326 328 330 334 336 339 CON GY -1.5 1.5
326. *FOR PIPES >12"
327. *24"-LS-O000-037-1CS1P05-IH (S10-S11-A)
328. *G
329. 533 CON GY -20 2.2
330. *24"-LS-O000-037-1CS1P05-IH (S10-S11-A)
331. *G
332. 539 CON GY -43.86 2.2
333. *24"-LS-O000-037-1CS1P05-IH
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 10 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
334. *G-(5.7*24"*25.4/1000)=16.176KN
335. 291 CON GY -16.176 2.79
336. *24"-LS-O000-037-1CS1P05-IH
337. *G-(5.7*24"*25.4/1000)=11.756KN
338. 290 CON GY -11.756 2.79
339. *24"-MS-O000-017-3CS1P05-IH
340. *G
341. 533 CON GY -27.71 1.225
342. *24"-MS-O000-017-3CS1P05-IH
343. *G-(5.7*24"*25.4/1000)=9.63KN
344. 280 CON GY -9.63 0.92
345. *24"-MS-O000-017-3CS1P05-IH
346. *G-(5.7*24"*25.4/1000)=9.186KN
347. 163 CON GY -9.186 0.92
348. *24"-MS-O000-017-3CS1P05-IH
349. *G-(5.7*24"*25.4/1000)=3.066KN
350. 19 CON GY -3.066 0.92
351. *24"-MS-O000-017-3CS1P05-IH
352. *G-(5.7*24"*25.4/1000)=10.116KN
353. 6 CON GY -10.116 0.92
354. *8"-G-O000-017-3CC1P01-NI
355. *G-(5.7*8"*25.4/1000)=8.462KN
356. 44 CON GY -8.462 1.4
357. *8"-G-O000-017-3CC1P01-NI
358. *G-(5.7*8"*25.4/1000)=0.792KN
359. 264 CON GY -0.792 1.4
360. *8"-G-O000-017-3CC1P01-NI
361. *G-(5.7*8"*25.4/1000)=1.352KN
362. 31 CON GY -1.352 1.4
363. *8"-G-O000-017-3CC1P01-NI
364. *G-(5.7*8"*25.4/1000)=2.322KN
365. 135 CON GY -2.322 1.4
366. *8"-G-O000-017-3CC1P01-NI
367. *G-(5.7*8"*25.4/1000)=1.068KN
368. 139 CON GY -1.068 1.4
369. *8"-G-O000-017-3CC1P01-NI
370. *G-(5.7*8"*25.4/1000)=1.512KN
371. 133 CON GY -1.512 1.4
372. *8"-G-O000-017-3CC1P01-NI
373. *G-(5.7*8"*25.4/1000)=0.922KN
374. 18 CON GY -0.922 1.4
375. *8"-G-O000-017-3CC1P01-NI
376. *G-(5.7*8"*25.4/1000)=5.91KN
377. 5 CON GY -5.91 1.4
378. *8"-HS-O000-018-6CS1P05-IH
379. *G-(5.7*8"*25.4/1000)=3.072KN
380. 45 CON GY -3.072 1.8
381. *8"-HS-O000-018-6CS1P05-IH
382. *G=11.07KN
383. 533 CON GY -11.07 0.5
384. *8"-HS-O000-018-6CS1P05-IH
385. *G-(5.7*8"*25.4/1000)=6.222KN
386. 284 CON GY -6.22 1.8
387. *8"-HS-O000-018-6CS1P05-IH
388. *G-(5.7*8"*25.4/1000)=6.572KN
389. 163 CON GY -6.572 1.8
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 11 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
390. *8"-HS-O000-018-6CS1P05-IH
391. *G-(5.7*8"*25.4/1000)=2.222KN
392. 19 CON GY -2.222 1.8
393. *8"-HS-O000-018-6CS1P05-IH
394. *G-(5.7*8"*25.4/1000)=8.382KN
395. 6 CON GY -8.382 1.8
396. *LOAD FROM FLARE LINE
397. *FOR 6"-RLL-S130-XXX-1CC2P03-NI
398. 356 CON GY -3.52 2
399. 303 CON GY 3.12 0.01
400. 374 CON GY -4.69 2.25
401. *IN PROJECTED AREA
402. *FROM 24"-LS-O000-037-1CS1P05-IH
403. 413 414 425 428 UNI GY -5.7
404. 436 UNI GY -2
405. ******************************************************************************
406. LOAD 21 PIPING EMPTY LOAD
407. *******************************************************************************
408. *FOR PIPING EMPTY CONDITION 0.6*OPERATING LOAD IS CONSIDERED AS PER
409. *SAES-M-001 AMD
410. REPEAT LOAD
411. 12 0.6
412. *******************************************************************************
413. LOAD 22 PIPING TEST LOAD
414. *******************************************************************************
415. *FOR PIPES <12" , LOAD INTENSITY = 1.9 KN/M2
416. *FOR PIPES >12" , LOAD APPLIED AS CONCENTRATED LOAD AND LOAD DATA IS AS PER
417. *PIPING INPUT DATA AND THE LOAD CALCULATION IS AS PER SABP07, CL. 4.1.2
418. *FOR CABLE TRAY, LOAD INTENSITY = 1.9 KN/M2. (AS PER SAES-M-001 -AMD CL. 5.2.5
419. *AND SABP-007 CL. 4.1.2)
420. *FUTURE PIPE LOAD OF 1.9 KN/M2 IS CONSIDERED FOR THE ANALYSIS.
421. MEMBER LOAD
422. *******FOR BEAMS AT EL.+10.500 & 12.400 M
423. *FOR PIPES <12"
424. *UDL=1.9*3=5.7 KN/M
425. 5 6 18 19 31 32 44 45 128 131 133 135 139 149 151 153 155 159 162 TO 164 181 -
426. 183 185 257 259 264 266 268 270 274 276 280 282 284 286 289 TO 295 -
427. 296 UNI GY -5.7
428. *FOR PIPES >12"
429. *24"-LS-O000-037-1CS1P05-IH (S10-S11-A)
430. *G-0=48.79KN
431. 539 CON GY -48.79 2.5
432. *24"-LS-O000-037-1CS1P05-IH (S10-S11-B)
433. *G-0=54.19KN
434. 533 CON GY -54.19 2.5
435. *24"-LS-O000-037-1CS1P05-IH
436. *G-(5.7*24"*25.4/1000)=44.176KN
437. 291 CON GY -45 2.79
438. *24"-LS-O000-037-1CS1P05-IH
439. *G-(5.7*24"*25.4/1000)=34.236KN
440. 290 CON GY -34.236 2.79
441. *24"-MS-O000-017-3CS1P05-IH (S10-S11-A)
442. *G-0=65.67KN
443. 533 CON GY -65.67 2.5
444. *24"-MS-O000-017-3CS1P05-IH
445. *G-(5.7*24"*25.4/1000)=30.846KN
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 12 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
446. 280 CON GY -30.846 0.92
447. *24"-MS-O000-017-3CS1P05-IH
448. *G-(5.7*24"*25.4/1000)=29.526KN
449. 163 CON GY -29.526 0.92
450. *24"-MS-O000-017-3CS1P05-IH
451. *G-(5.7*24"*25.4/1000)=9.326KN
452. 19 CON GY -9.326 0.92
453. *24"-MS-O000-017-3CS1P05-IH
454. *G-(5.7*24"*25.4/1000)=29.426KN
455. 6 CON GY -29.426 0.92
456. *8"-G-O000-017-3CC1P01-NI
457. *G-(5.7*8"*25.4/1000)=5.26KN
458. 5 CON GY -5.26 1.4
459. *8"-G-O000-017-3CC1P01-NI
460. *G-(5.7*8"*25.4/1000)=0.732KN
461. 18 CON GY -0.732 1.4
462. *8"-G-O000-017-3CC1P01-NI
463. *G-(5.7*8"*25.4/1000)=0.922KN
464. 133 CON GY -0.922 1.4
465. *8"-G-O000-017-3CC1P01-NI
466. *G-(5.7*8"*25.4/1000)=0.862KN
467. 139 CON GY -0.862 1.4
468. *8"-G-O000-017-3CC1P01-NI
469. *G-(5.7*8"*25.4/1000)=0.782KN
470. 135 CON GY -0.782 1.4
471. *8"-G-O000-017-3CC1P01-NI
472. *G-(5.7*8"*25.4/1000)=1.132KN
473. 31 CON GY -1.132 1.4
474. *8"-G-O000-017-3CC1P01-NI
475. *G-(5.7*8"*25.4/1000)=0.612KN
476. 264 CON GY -0.612 1.4
477. *8"-G-O000-017-3CC1P01-NI
478. *G-(5.7*8"*25.4/1000)=7.582KN
479. 44 CON GY -7.582 1.4
480. *8"-HS-O000-018-6CS1P05-IH
481. *G-(5.7*8"*25.4/1000)=4.162KN
482. 45 CON GY -4.162 1.8
483. *8"-HS-O000-018-6CS1P05-IH
484. *G-0=13.91KN
485. 533 CON GY -13.91 0.5
486. *8"-HS-O000-018-6CS1P05-IH
487. *G-(5.7*8"*25.4/1000)=8.122KN
488. 284 CON GY -8.122 1.8
489. *8"-HS-O000-018-6CS1P05-IH
490. *G-(5.7*8"*25.4/1000)=8.552KN
491. 163 CON GY -8.552 1.8
492. *8"-HS-O000-018-6CS1P05-IH
493. *G-(5.7*8"*25.4/1000)=3.092KN
494. 19 CON GY -3.092 1.8
495. *8"-HS-O000-018-6CS1P05-IH
496. *G-(5.7*8"*25.4/1000)=9.392KN
497. 6 CON GY -9.392 1.8
498. ******************************************************************************
499. LOAD 31 ANCHOR LOAD IN +VE DIR
500. ******************************************************************************
501. *PIPING THERMAL-ANCHOR LOADS -IN LONGITUDINAL DIRECTION
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 13 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
502. *PIPE ANCHOR LOADS AS PER PIPING INPUT DATA
503. MEMBER LOAD
504. *AT EL. +10.500
505. *3"-CA-0000-011-1CC2C06-NI
506. 18 CON GZ 3 1.15
507. *3"-FG-0000-026-1CC1P01-NI
508. 18 CON GZ 3 1.7
509. *3"-G-0000-010-3CC1P01-NI
510. 18 CON GZ 3 1.92
511. *FOR FUTURE
512. 18 CON GZ 10 2.2
513. 18 CON GZ 10 2.6
514. 18 CON GZ 10 3
515. 18 CON GZ 10 3.3
516. 131 CON GZ 10 0.1
517. 131 CON GZ 10 0.5
518. 131 CON GZ 10 0.8
519. 131 CON GZ 10 1.2
520. 131 CON GZ 10 1.6
521. 131 CON GZ 10 1.9
522. 131 CON GZ 10 2.3
523. 131 CON GZ 10 2.6
524. 131 CON GZ 10 3
525. 131 CON GZ 10 3.3
526. *AT EL. +12.400
527. *4"-DMW-0000-011-1CC2C06-NI
528. 294 CON GZ 4 0.19
529. *3"-IA-0000-027-12CG0U01-NI
530. 294 CON GZ 3 0.4
531. *3"-UA-0000-028-12CG0U01-NI
532. 294 CON GZ 3 0.57
533. *3"-UW-0000-033-1CS2U16-NI
534. 294 CON GZ 3 0.72
535. *3"-SWS-0000-033-1CS4U16-NI
536. 290 CON GZ 3 0.01
537. *FOR FUTURE
538. 290 CON GZ 10 0.29
539. 290 CON GZ 10 0.65
540. 290 CON GZ 10 0.9
541. 290 CON GZ 10 1.25
542. 290 CON GZ 10 1.55
543. 290 CON GZ 10 1.9
544. ******************************************************************************
545. LOAD 32 ANCHOR LOAD IN -VE DIR
546. ******************************************************************************
547. REPEAT LOAD
548. 31 -1.0
549. ******************************************************************************
550. LOAD 33 FRICTION LOAD IN +VE DIR
551. ******************************************************************************
552. *30% OF THE OPERATING LOAD IS CONSIDERED FOR PIPES <L2" AS PER PIPING INPUT DAT
553. *FOR PIPES >12", LOAD IS AS PER PIPING INPUT DATA AND THE LOAD CALCULATION
554. *IS AS PER SABP07, CL. 4.1.2
555. *PIPING THERMAL-FRICTION LOADS -IN LONGITUDINAL DIRECTION
556. MEMBER LOAD
557. *******FOR BEAMS AT EL.+12.500 M
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 14 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
558. *FOR PIPES <12"
559. **UDL = 30% OF 5.7 = (30/100)*5.7 = 1.71 KN/M
560. 5 6 18 19 31 32 44 45 128 131 133 135 139 149 151 153 155 159 162 TO 164 181 -
561. 183 185 257 259 264 266 268 270 274 276 280 282 284 286 289 TO 295 -
562. 296 UNI GZ 1.71
563. *8"-G-O000-017-3CC1P01-NI
564. *-HL-(1.7*8"*25.4/1000)=-1.397KN
565. 135 CON GZ -1.397 1.4
566. *8"-HS-O000-018-6CS1P05-IH
567. *HL=1.45KN
568. 284 CON GX 1.45 1.8
569. *8"-HS-O000-018-6CS1P05-IH
570. *-HL-(1.7*8"*25.4/1000)=-2.645KN
571. 284 CON GZ -2.645 1.8
572. *8"-HS-O000-018-6CS1P05-IH
573. *-HL-(1.7*8"*25.4/1000)=-2.0865KN
574. 163 CON GZ -2.086 1.8
575. *8"-HS-O000-018-6CS1P05-IH
576. *-HL-(1.7*8"*25.4/1000)=-3.165KN
577. 6 CON GZ -3.165 1.8
578. *8"-HS-O000-018-6CS1P05-IH
579. *HL-0=3.24KN
580. 533 CON GX 3.24 0.5
581. *24"-LS-O000-037-1CS1P05-IH
582. 291 CON GZ -1.62 2.79
583. 291 CON GX -1.05 2.79
584. 290 CON GZ -2.9 2.79
585. 533 CON GZ 1.2 2.5
586. 539 CON GZ -11.07 2.5
587. 539 CON GX -3.3 2.5
588. *24"-MS-O000-017-3CS1P05-IH
589. 280 CON GX -4.35 0.92
590. 280 CON GZ -3.32 0.92
591. 163 CON GZ -1.18 0.92
592. 19 CON GZ -1.96 0.92
593. 6 CON GX -1.32 0.92
594. 6 CON GX -3.72 0.92
595. 533 CON GZ -7.42 1.25
596. 533 CON GX 3.76 1.25
597. ******************************************************************************
598. LOAD 34 FRICTION LOAD IN -VE DIR
599. ******************************************************************************
600. *30% OF THE OPERATING LOAD IS CONSIDERED FOR PIPES <L2" AS PER PIPING INPUT DAT
601. *FOR PIPES >12", LOAD IS AS PER PIPING INPUT DATA AND THE LOAD CALCULATION
602. *IS AS PER SABP07, CL. 4.1.2
603. *PIPING THERMAL-FRICTION LOADS -IN LONGITUDINAL DIRECTION
604. *MEMBER LOAD
605. *******FOR BEAMS AT EL.+12.500 M
606. *FOR PIPES <12"
607. **UDL = 30% OF 5.7 = (30/100)*5.7 = 1.71 KN/M
608. REPEAT LOAD
609. 33 -1.0
610. *******************************************************************************
611. LOAD 35 TEMPERATURE LOAD
612. *******************************************************************************
613. *REFER DOCUMENT NO: 2411-8320-CA-CA10-0064-APPENDIX B
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 15 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
614. TEMPERATURE LOAD
615. 1 TO 6 14 TO 19 27 TO 32 40 TO 45 53 TO 64 89 TO 92 94 96 102 TO 105 107 109 -
616. 128 131 TO 133 135 139 149 TO 156 158 159 162 TO 164 180 TO 187 189 -
617. 192 TO 195 201 TO 204 255 TO 259 261 TO 270 272 TO 286 289 TO 301 -
618. 303 TO 343 353 TO 358 364 TO 369 374 378 TO 385 406 TO 422 425 TO 436 477 -
619. 479 TO 493 496 497 500 TO 513 518 TO 541 543 TO 546 551 TO 564 566 TO 574 -
620. 575 TEMP 38
621. ******************************************************************************
622. LOAD 41 WIND LOAD IN +X DIR
623. *CALCULATION BASED ON SABP-006
624. *ALSO REFER DOCUMENT NO: 2411-8320-CA-CA10-0064-APPENDIX C
625. *WIND LOAD IN TRANSVERSE DIRECTION ALONE CONSIDERED
626. *WIND ON PIPES
627. *WINDWARD
628. JOINT LOAD
629. 19 28 56 FX 4.65
630. 10 37 FX 2.71
631. 21 30 59 FX 6.4
632. 12 39 FX 3.72
633. 145 144 FX 0.89
634. 146 143 FX 0.51
635. MEMBER LOAD
636. 374 CON GX 0.89
637. *WINDWARD
638. MEMBER LOAD
639. *ON BEAMS
640. 53 TO 64 89 TO 92 94 96 102 TO 105 107 109 255 258 261 262 265 269 272 275 -
641. 277 278 281 285 368 369 408 409 421 422 480 481 487 490 493 526 527 -
642. 532 TO 535 539 540 544 545 572 573 UNI GX 0.58
643. 301 303 308 TO 310 313 315 317 322 TO 325 327 329 331 TO 333 335 337 338 356 -
644. 374 380 381 486 554 557 TO 559 UNI GX 0.54
645. *ON COLUMNS
646. 1 TO 4 14 TO 17 27 TO 30 40 TO 43 364 TO 367 406 407 419 420 432 433 496 497 -
647. 528 TO 531 537 538 541 543 566 567 UNI GX 0.55
648. 297 TO 300 311 312 314 316 378 379 385 553 555 556 UNI GX 0.65
649. *ON VERTICAL BRACING
650. 410 411 477 479 482 TO 485 488 489 491 492 512 513 518 TO 521 536 546 551 -
651. 552 568 TO 571 574 575 UNI GX 0.28
652. 304 TO 307 357 358 382 383 560 TO 563 UNI GX 0.33
653. *IN PROJECTED AREA
654. *FROM 24"-LS-O000-037-1CS1P05-IH
655. **************************************************************************
656. LOAD 42 WIND LOAD IN -X DIR
657. REPEAT LOAD
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 16 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
658. 41 -1.0
659. LOAD 51 SURGE LOAD (+VE)
660. *****************************************************************************
661. *CONSIDERING 150KN OF SURGE LOAD FOR 24" PIPELINE @0.869 M FROM THE COLUMN
662. MEMBER LOAD
663. 290 CON GZ 150 0.29
664. *646 CON GZ 150 0.869
665. *1010 CON GX 150 0.869
666. *1007 CON GX 150 0.869
667. *1021 CON GX 150 0.869
668. *******************************************************************************
669. LOAD 52 SURGE LOAD (-VE)
670. ******************************************************************************
671. REPEAT LOAD
672. 51 -1.0
673. *******************************************************************************
674. *LOAD COMBINATION FOR STEEL STRUCTURES DESIGN-STRENGTH DESIGN (LRFD)
675. *******************************************************************************
676. *AS PER SAES-M-001 CL. 6.2
677. **1.4(DEAD LOAD +OPERATING LOAD+THERMAL LOAD)
678. **1.2(DEAD+OPERATING LOAD+ANCHOR)+ (1.6WIND OR 1.0 SEISMIC LOAD)
679. **0.9 DEAD LOAD(EMPTY) + 1.6WIND
680. **0.9 DEAD LOAD +0.6 OPERATING+ 1.0 SEISMIC (OPERATING)
681. **0.9 DEAD LOAD + 1.0 SEISMIC (EMPTY)
682. *~ 0.9 DEAD LOAD + 0.6 SEISMIC (OPERATING)
683. **1.4(DEAD LOAD )+ 1.4(TEST LOAD)
684. **1.2(DEAD LOAD )+ 1.2(TEST LOAD) +(WIND @50MPH)
685. *~ 1.2(DEAD LOAD )+ 1.2(TEST LOAD) +0.25WIND
686. *******************************************************************************
687. *LOAD COMBINATIONS
688. *******************************************************************************
689. *LOAD COMBINATION FOR STRENGTH CHECK
690. *FOR COLUMN,LONGITUDINAL BEAM,STRUT,BRACING
691. *(WITH FRICTION LOAD AS 5% OF OPERATING)
692. *******************************************************************************
693. LOAD 101 1.4DS+1.4DO+1.4AF(+VE)+0.23FF(+VE)+1.4T(+VE)
694. REPEAT LOAD
695. 11 1.4 12 1.4 31 1.4 33 0.23 35 1.4
696. LOAD 102 1.4DS+1.4DO+1.4AF(-VE)+0.23FF(-VE)+1.4T(-VE)
697. REPEAT LOAD
698. 11 1.4 12 1.4 32 1.4 34 0.23 35 1.4
699. *******************************************************************************
700. LOAD 103 1.2DS+1.2DO+1.2AF(+VE)+1.6W(+Z)
701. REPEAT LOAD
702. 11 1.2 12 1.2 31 1.2 41 1.6
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 17 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
703. LOAD 104 1.2DS+1.2DO+1.2AF(+VE)+1.6WL(-Z)
704. REPEAT LOAD
705. 11 1.2 12 1.2 31 1.2 42 1.6
706. LOAD 105 1.2DS+1.2DO+1.2AF(+VE)+1.0E(+X)
707. REPEAT LOAD
708. 11 1.2 12 1.2 31 1.2 1 1.0
709. LOAD 106 1.2DS+1.2DO+1.2AF(+VE)+1.0E(-X)
710. REPEAT LOAD
711. 11 1.2 12 1.2 31 1.2 2 1.0
712. LOAD 107 1.2DS+1.2DO+1.2AF(+VE)+1.0E(+Z)
713. REPEAT LOAD
714. 11 1.2 12 1.2 31 1.2 3 1.0
715. LOAD 108 1.2DS+1.2DO+1.2AF(+VE)+1.0E(-Z)
716. REPEAT LOAD
717. 11 1.2 12 1.2 31 1.2 4 1.0
718. LOAD 109 1.2DS+1.2DO+1.2AF(-VE)+1.6W(+Z)
719. REPEAT LOAD
720. 11 1.2 12 1.2 32 1.2 41 1.6
721. LOAD 110 1.2DS+1.2DO+1.2AF(-VE)+1.6WL(-Z)
722. REPEAT LOAD
723. 11 1.2 12 1.2 32 1.2 42 1.6
724. LOAD 111 1.2DS+1.2DO+1.2AF(-VE)+1.0E(+X)
725. REPEAT LOAD
726. 11 1.2 12 1.2 32 1.2 1 1.0
727. LOAD 112 1.2DS+1.2DO+1.2AF(-VE)+1.0E(-X)
728. REPEAT LOAD
729. 11 1.2 12 1.2 32 1.2 2 1.0
730. LOAD 113 1.2DS+1.2DO+1.2AF(-VE)+1.0E(+Z)
731. REPEAT LOAD
732. 11 1.2 12 1.2 32 1.2 3 1.0
733. LOAD 114 1.2DS+1.2DO+1.2AF(-VE)+1.0E(-Z)
734. REPEAT LOAD
735. 11 1.2 12 1.2 32 1.2 4 1.0
736. *******************************************************************************
737. LOAD 115 0.9DS+0.9DE+1.6W(+Z)
738. REPEAT LOAD
739. 11 0.9 21 0.9 41 1.6
740. LOAD 116 0.9DS+0.9DE+1.6W(-Z)
741. REPEAT LOAD
742. 11 0.9 21 0.9 42 1.6
743. *******************************************************************************
744. LOAD 117 0.9DS+0.6DO+1.0EO(+X)
745. REPEAT LOAD
746. 11 0.9 12 0.6 1 1.0
747. LOAD 118 0.9DS+0.6DO+1.0EO(-X)
748. REPEAT LOAD
749. 11 0.9 12 0.6 2 1.0
750. LOAD 119 0.9DS+0.6DO+1.0EO(+Z)
751. REPEAT LOAD
752. 11 0.9 12 0.6 3 1.0
753. LOAD 120 0.9DS+0.6DO+1.0EO(-Z)
754. REPEAT LOAD
755. 11 0.9 12 0.6 4 1.0
756. *******************************************************************************
757. LOAD 121 0.9DS+0.9DE+0.67EO(+X)
758. REPEAT LOAD
759. 11 0.9 21 0.9 1 0.7
760. LOAD 122 0.9DS+0.9DE+0.67EO(-X)
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 18 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
761. REPEAT LOAD
762. 11 0.9 21 0.9 2 0.7
763. LOAD 123 0.9DS+0.9DE+0.67EO(+Z)
764. REPEAT LOAD
765. 11 0.9 21 0.9 3 0.7
766. LOAD 124 0.9DS+0.9DE+0.67EO(-Z)
767. REPEAT LOAD
768. 11 0.9 21 0.9 4 0.7
769. *******************************************************************************
770. LOAD 125 1.4(DS+DT)
771. REPEAT LOAD
772. 11 1.4 22 1.4
773. *******************************************************************************
774. LOAD 126 1.2(DS+DT)+0.29W(+Z)
775. REPEAT LOAD
776. 11 1.2 22 1.2 41 0.29
777. LOAD 127 1.2(DS+DT)+0.29W(-Z)
778. REPEAT LOAD
779. 11 1.2 22 1.2 42 0.29
780. *******************************************************************************
781. LOAD 128 1.4DS+1.4DO+1.4AF(+VE)+0.23FF(+VE)+1.4T(+VE)+1.0SL(+VE)
782. REPEAT LOAD
783. 11 1.4 12 1.4 31 1.4 33 0.23 51 1.4 35 1.4
784. LOAD 129 1.4DS+1.4DO+1.4AF(-VE)+0.23FF(-VE)+1.4T(-VE)+1.0SL(-VE)
785. REPEAT LOAD
786. 11 1.4 12 1.4 32 1.4 34 0.23 35 1.4 52 1.0
787. *******************************************************************************
788. LOAD 130 1.2DS+1.2DO+1.2AF(+VE)+1.0SL(+VE)
789. REPEAT LOAD
790. 11 1.2 12 1.2 31 1.2 51 1.0
791. LOAD 131 1.2DS+1.2DO+1.2AF(+VE)+1.0SL(-VE)
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 19 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
792. REPEAT LOAD
793. 11 1.2 12 1.2 31 1.2 52 1.0
794. LOAD 132 1.2DS+1.2DO+1.2AF(-VE)+1.0SL(+VE)
795. REPEAT LOAD
796. 11 1.2 12 1.2 32 1.2 51 1.0
797. LOAD 133 1.2DS+1.2DO+1.2AF(-VE)+1.0SL(-VE)
798. REPEAT LOAD
799. 11 1.2 12 1.2 32 1.2 52 1.0
800. *******************************************************************************
801. *LOAD COMBINATION FOR STRENGTH CHECK
802. *FOR TRANSVERSE BEAM DESIGN
803. *(WITH FRICTION LOAD AS 10% OF OPERATING)
804. *******************************************************************************
805. LOAD 151 1.4DS+1.4DO+1.4AF(+VE)+0.47FF(+VE)+1.4T(+VE)
806. REPEAT LOAD
807. 11 1.4 12 1.4 31 1.4 33 0.47 35 1.4
808. LOAD 152 1.4DS+1.4DO+1.4AF(-VE)+0.47FF(-VE)+1.4T(-VE)
809. REPEAT LOAD
810. 11 1.4 12 1.4 32 1.4 34 0.47 35 1.4
811. *******************************************************************************
812. LOAD 153 1.4DS+1.4DO+1.4AF(+VE)+0.47FF(+VE)+1.4T(+VE)+1.0SL(+VE)
813. REPEAT LOAD
814. 11 1.4 12 1.4 31 1.4 33 0.47 35 1.4 51 1.0
815. LOAD 154 1.4DS+1.4DO+1.4AF(-VE)+0.47FF(-VE)+1.4T(-VE)+1.0SL(-VE)
816. REPEAT LOAD
817. 11 1.4 12 1.4 32 1.4 34 0.47 35 1.4 52 1.0
818. *******************************************************************************
819. *LOAD COMBINATION FOR SERVICEABILITY CHECK
820. *FOR LONGITUDINAL BEAMS, STRUTS, COLUMNS AND FOUNDATION
821. *(WITH FRICTION LOAD AS 5% OF OPERATING)
822. *******************************************************************************
823. LOAD 201 1.0DS+1.0DO+1.0AF(+VE) )+0.17FF(+VE)+1.0T(+VE)
824. REPEAT LOAD
825. 11 1.0 12 1.0 31 1.0 33 0.17 35 1.0
826. LOAD 202 1.0DS+1.0DO+1.0AF(-VE) +0.17FF(-VE)+1.0T(-VE)
827. REPEAT LOAD
828. 11 1.0 12 1.0 32 1.0 34 0.17 35 1.0
829. *******************************************************************************
830. LOAD 203 1.0DS+1.0DO+1.0AF(+VE)+1.0W(+Z)
831. REPEAT LOAD
832. 11 1.0 12 1.0 31 1.0 41 1.0
833. LOAD 204 1.0DS+1.0DO+1.0AF(+VE)+1.0WL(-Z)
834. REPEAT LOAD
835. 11 1.0 12 1.0 31 1.0 42 1.0
836. LOAD 205 1.0DS+1.0DO+1.0AF(+VE)+0.7E(+X)
837. REPEAT LOAD
838. 11 1.0 12 1.0 31 1.0 1 0.7
839. LOAD 206 1.0DS+1.0DO+1.0AF(+VE)+0.7E(-X)
840. REPEAT LOAD
841. 11 1.0 12 1.0 31 1.0 2 0.7
842. LOAD 207 1.0DS+1.0DO+1.0AF(+VE)+0.7E(+Z)
843. REPEAT LOAD
844. 11 1.0 12 1.0 31 1.0 3 0.7
845. LOAD 208 1.0DS+1.0DO+1.0AF(+VE)+0.7E(-Z)
846. REPEAT LOAD
847. 11 1.0 12 1.0 31 1.0 4 0.7
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 20 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
848. LOAD 209 1.0DS+1.0DO+1.0AF(-VE)+1.0W(+Z)
849. REPEAT LOAD
850. 11 1.0 12 1.0 32 1.0 41 1.0
851. LOAD 210 1.0DS+1.0DO+1.0AF(-VE)+1.0WL(-Z)
852. REPEAT LOAD
853. 11 1.0 12 1.0 32 1.0 42 1.0
854. LOAD 211 1.0DS+1.0DO+1.0AF(-VE)+0.7E(+X)
855. REPEAT LOAD
856. 11 1.0 12 1.0 32 1.0 1 0.7
857. LOAD 212 1.0DS+1.0DO+1.0AF(-VE)+0.7E(-X)
858. REPEAT LOAD
859. 11 1.0 12 1.0 32 1.0 2 0.7
860. LOAD 213 1.0DS+1.0DO+1.0AF(-VE)+0.7E(+Z)
861. REPEAT LOAD
862. 11 1.0 12 1.0 32 1.0 3 0.7
863. LOAD 214 1.0DS+1.0DO+1.0AF(-VE)+0.7E(-Z)
864. REPEAT LOAD
865. 11 1.0 12 1.0 32 1.0 4 0.7
866. *******************************************************************************
867. LOAD 215 1.0DS+1.0DE+1.0W(+Z)
868. REPEAT LOAD
869. 11 1.0 21 1.0 41 1.0
870. LOAD 216 1.0DS+1.0DE+1.0W(-Z)
871. REPEAT LOAD
872. 11 1.0 21 1.0 42 1.0
873. *******************************************************************************
874. LOAD 217 0.9DS+0.6DO+0.7EO(+X)
875. REPEAT LOAD
876. 11 0.9 12 0.6 1 0.7
877. LOAD 218 0.9DS+0.6DO+0.7EO(-X)
878. REPEAT LOAD
879. 11 0.9 12 0.6 2 0.7
880. LOAD 219 0.9DS+0.6DO+0.7EO(+Z)
881. REPEAT LOAD
882. 11 0.9 12 0.6 3 0.7
883. LOAD 220 0.9DS+0.6DO+0.7EO(-Z)
884. REPEAT LOAD
885. 11 0.9 12 0.6 4 0.7
886. *******************************************************************************
887. LOAD 221 0.9DS+0.9DE+0.5EO(+X)
888. REPEAT LOAD
889. 11 0.9 21 0.9 1 0.5
890. LOAD 222 0.9DS+0.9DE+0.5EO(-X)
891. REPEAT LOAD
892. 11 0.9 21 0.9 2 0.5
893. LOAD 223 0.9DS+0.9DE+0.5EO(+Z)
894. REPEAT LOAD
895. 11 0.9 21 0.9 3 0.5
896. LOAD 224 0.9DS+0.9DE+0.5EO(-Z)
897. REPEAT LOAD
898. 11 0.9 21 0.9 4 0.5
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 21 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
899. *******************************************************************************
900. LOAD 225 1.0DS+DT
901. REPEAT LOAD
902. 11 1.0 22 1.0
903. *******************************************************************************
904. LOAD 226 1.0DS+1.0DT+0.29W(+Z)
905. REPEAT LOAD
906. 11 1.0 22 1.0 41 0.29
907. LOAD 227 1.0DS+1.0DT+0.29W(-Z)
908. REPEAT LOAD
909. 11 1.0 22 1.0 42 0.29
910. *******************************************************************************
911. LOAD 228 1.0DS+1.0DO+1.0AF(+VE)++0.17FF(+VE)+1.0T(+VE)+1.0SL(+VE)
912. REPEAT LOAD
913. 11 1.0 12 1.0 31 1.0 33 0.17 35 1.0 51 1.0
914. LOAD 229 1.0DS+1.0DO+1.0AF(-VE)+0.17FF(-VE)+1.0T(-VE)+1.0SL(-VE)
915. REPEAT LOAD
916. 11 1.0 12 1.0 32 1.0 34 0.17 35 1.0 52 1.0
917. *******************************************************************************
918. LOAD 230 1.0DS+1.0DO+1.0AF(+VE)+1.0SL(+VE)
919. REPEAT LOAD
920. 11 1.0 12 1.0 31 1.0 51 1.0
921. LOAD 231 1.0DS+1.0DO+1.0AF(+VE)+1.0SL(-VE)
922. REPEAT LOAD
923. 11 1.0 12 1.0 31 1.0 52 1.0
924. LOAD 232 1.0DS+1.0DO+1.0AF(-VE)+1.0SL(+VE)
925. REPEAT LOAD
926. 11 1.0 12 1.0 32 1.0 51 1.0
927. LOAD 233 1.0DS+1.0DO+1.0AF(-VE)+1.0SL(-VE)
928. REPEAT LOAD
929. 11 1.0 12 1.0 32 1.0 52 1.0
930. *******************************************************************************
931. *LOAD COMBINATION FOR SERVICEABILITY CHECK
932. *FOR TRANSVERSE BEAM AND FOUNDATION(FOR BEARING CAPACITY AND STABILITY CHECK) D
933. *(WITH FRICTION LOAD AS 10% OF OPERATING)
934. *******************************************************************************
935. LOAD 251 1.0DS+1.0DO+1.0AF(+VE)+0.33FF(+VE)+1.0T(+VE)
936. REPEAT LOAD
937. 11 1.0 12 1.0 31 1.0 33 0.33 35 1.0
938. LOAD 252 1.0DS+1.0DO+1.0AF(-VE)+0.33FF(-VE)+1.0T(-VE)
939. REPEAT LOAD
940. 11 1.0 12 1.0 32 1.0 34 0.33 35 1.0
941. *******************************************************************************
942. LOAD 253 1.0DS+1.0DO+1.0AF(+VE)+0.33FF(+VE)+1.0T(+VE)+1.0SL(+VE)
943. REPEAT LOAD
944. 11 1.0 12 1.0 31 1.0 33 0.33 35 1.0 51 1.0
945. LOAD 254 1.0DS+1.0DO+1.0AF(-VE)+0.33FF(-VE)+1.0T(-VE)+1.0SL(-VE)
946. REPEAT LOAD
947. 11 1.0 12 1.0 32 1.0 34 0.33 35 1.0 52 1.0
948. *******************************************************************************
949. PERFORM ANALYSIS PRINT STATICS CHECK
950. *PDELTA 3 ANALYSIS
STAAD SPACE -- PAGE NO. 20

++ Adjusting Displacements 18:46:37


++ Adjusting Displacements 18:46:37
++ Adjusting Displacements 18:46:38
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 22 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001

951. *******************************************************************************
952. *DESIGN
953. PARAMETER
954. CODE LRFD
955. FYLD 355000 ALL
956. BEAM 1 ALL
957. RATIO 1 ALL
958. MAIN 0 ALL
959. *TRACK 2 ALL
960. ****************
961. *LZ 7.1 MEMB 1 2 14 15 27 28 40 41 65 TO 68 364 TO 367
962. LZ 6.95 MEMB 314 316 378 379
963. LZ 13.9 MEMB 311 312
964. LZ 4.6 MEMB 366 367 406 407 496 497
965. LY 4.6 MEMB 366 367 406 407 496 497
966. LY 1.9 MEMB 3 4 419 420
967. LZ 1.9 MEMB 3 4 419 420
968. LZ 4.6 MEMB 432 433 528 TO 531 537 538 541 543
969. LY 2.1 MEMB 432 433 528 537
970. LZ 8.55 MEMB 385 553 555 556
971. LZ 4.68 MEMB 40 41 566 567
972. LY 2.5 MEMB 61 64 278 285 487 490 526 527
973. *LY 7.1 MEMB 1 2 14 15 364 TO 367 406 407 437 438 441 453
974. LY 7.1 MEMB 1 2 14 15 364 TO 367 406 407 496 497
975. LZ 4.5 MEMB 53 56 59 62 255 258 272 275 308 313 337 338
976. LY 4.5 MEMB 53 56 59 62 255 258 272 275 308 313 337 338
977. LZ 7 MEMB 310 333 335 384 564
978. LY 2 MEMB 261 265 277 281 331 480 481 486 493
979. LY 7 MEMB 303 356 532 TO 535 539 540 544 545 554 557 TO 559
980. LY 3.5 MEMB 5 6 18 19 31 32 44 45 128 131 133 135 139 149 151 153 155 159 -
981. 162 TO 164 181 183 185 257 259 264 266 268 270 274 276 280 282 284 286 289 -
982. 290 TO 296 412 TO 415 425 TO 428
983. LY 1.6 MEMB 434 435
984. LZ 7 MEMB 5 6 18 19 31 32 44 45 128 131 133 135 139 149 151 153 155 159 162 -
985. 163 TO 164 181 183 185 257 259 264 266 268 270 274 276 280 282 284 286 289 -
986. 290 TO 296 412 TO 415 425 TO 428
987. LZ 10.5 MEMB 54 57 60 63 89 TO 92 94 96 102 TO 105 107 109 309 315
988. 322 TO 325 327 329
989. LZ 3.5 MEMB 55 58 261 262 265 269 317 331 332 480 481 486
990. LZ 3.5 MEMB 277 278 487
991. LZ 3.5 MEMB 281 285 493 526
992. LZ 1.6 MEMB 434 435
993. LZ 8.42 MEMB 477 479 570 571
994. *LZ 7.1 MEMB 1 2 14 15 27 28 40 41 65 TO 68 364 TO 367 406 407 432 433 496 497
995. ***************
996. KZ 2.77 MEMB 1 2
997. KZ 2.54 MEMB 366 367 406 407 496 497
998. KZ 2.37 MEMB 3 4 419 420
999. KZ 2.77 MEMB 14 15
1000. KZ 3.09 MEMB 364 365
1001. KZ 3.31 MEMB 16 17
1002. KZ 2.89 MEMB 27 28
1003. KZ 2.84 MEMB 529 530 538 543
1004. KZ 2.8 MEMB 29 30
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 23 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
1005. KZ 2.31 MEMB 299 314 379 553 556
1006. KZ 2.71 MEMB 40 41 566 567
1007. KZ 2.66 MEMB 432 433 528 531 537 541
1008. KZ 2.8 MEMB 42 43
1009. KZ 2.31 MEMB 300 316 378 385 555
1010. ****************
1011. UNT 2.25 MEMB 53 56 59 62 255 258 272 275 308 313 337 338
1012. UNB 2.25 MEMB 53 56 59 62 255 258 272 275 308 313 337 338
1013. UNT 2.75 MEMB 54 57 60 63 89 TO 92 94 96 102 TO 105 107 109 309 315 -
1014. 322 TO 325 327 329
1015. UNB 2.75 MEMB 54 57 60 63 89 TO 92 94 96 102 TO 105 107 109 309 315
1016. 322 TO 325 327 329
1017. UNT 2.5 MEMB 55 58 61 64 261 262 265 269 277 278 281 285 310 317 331 TO 333 -
1018. 335 480 481 486 487 490 493 526 527
1019. UNB 2.5 MEMB 55 58 61 64 261 262 265 269 277 278 281 285 310 317 331 TO 333 -
1020. 335 480 481 486 487 490 493 526 527
1021. UNT 7 MEMB 532 TO 535 539 540 544 545
1022. UNB 7 MEMB 532 TO 535 539 540 544 545
1023. UNT 3.5 MEMB 413 414 425 428
1024. UNB 3.5 MEMB 413 414 425 428
1025. UNT 1.6 MEMB 434 435
1026. UNB 1.6 MEMB 434 435
1027. NSF 0.85 MEMB 192 TO 195 201 TO 204 340 TO 343 353 TO 355 357 358 382 383 -
1028. 410 411 417 418 430 431 477 479 482 TO 485 488 489 491 492 500 TO 511 518 -
1029. 519 TO 521 536 546 551 552 560 TO 563 568 TO 575
1030. LOAD LIST 101 TO 133
1031. *FOR COLUMNS
1032. CHECK CODE MEMB 1 TO 4 14 TO 17 27 TO 30 40 TO 43 297 TO 300 304 TO 307 311 -
1033. 312 314 316 364 TO 367 378 379 385 406 407 419 420 432 433 496 497 512 513 -
1034. 528 TO 531 537 538 541 543 553 555 556 566 567

STAAD.PRO CODE CHECKING - (LRFD 3RD EDITION)


********************************************

ALL UNITS ARE - KN METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

1 ST HE400A (EUROPEAN SECTIONS)


PASS LRFD-H1-1B-C 0.303 110
248.37 C 40.49 85.13 2.35
2 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.306 109
287.70 C 39.07 -85.08 2.35
3 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.144 109
33.41 C 30.78 -22.73 0.00
4 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.123 110
70.46 C 26.80 13.96 0.00
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 24 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
14 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.344 110
394.79 C 17.26 163.25 2.35
15 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.350 109
429.28 C 16.08 -165.89 2.35
16 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.249 110
154.08 C 0.00 189.44 1.90
17 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.182 128
177.51 C -33.40 31.89 0.00
27 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1A-C 0.619 104
936.29 C 37.16 252.09 2.57
28 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1A-C 0.575 103
867.48 C 26.74 -257.61 2.57
29 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.189 104
188.46 C 0.76 135.40 1.90
30 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.201 103
191.65 C 2.00 -141.01 1.90
40 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.214 109
261.30 C 17.92 -87.80 2.34
41 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.194 110
276.45 C 13.72 82.07 2.34
42 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.151 104
105.63 C -0.74 111.65 1.90
43 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.144 109
120.62 C 0.74 -104.75 1.90
297 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.083 110
15.54 C -2.89 -57.61 0.00
298 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.171 103
55.15 C 8.28 110.28 0.00
299 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.092 109
77.96 C 3.00 59.08 0.00
300 ST HE400A (EUROPEAN SECTIONS)
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 25 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
PASS LRFD-H1-1B-C 0.091 103
62.92 C -1.16 65.39 0.00
304 ST HE140A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.121 103
3.50 T 0.01 -6.52 1.60
305 ST HE140A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.309 103
6.68 T 0.00 -16.74 1.60
306 ST HE140A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.246 109
1.35 T 0.00 -13.43 1.60
307 ST HE140A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.212 103
5.66 T 0.00 -11.47 1.60
311 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.073 103
12.43 C -1.41 44.52 0.00
312 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.138 103
22.03 C -1.97 86.02 0.00
314 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.071 103
44.85 C -1.45 45.48 0.00
316 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.053 103
35.71 C -0.20 -36.19 3.33
364 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.356 103
333.45 C -18.47 -168.09 4.60
365 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.360 104
289.42 C -21.25 170.12 4.60
366 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.267 128
166.23 C -62.64 3.32 2.50
367 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.268 128
120.63 C -64.03 -7.00 2.50
378 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.086 103
24.01 C 0.00 -64.95 3.62
379 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.106 109
28.39 C 0.00 -80.20 3.62
385 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.096 110
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 26 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
40.74 C 0.94 -60.70 0.00
406 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.266 128
161.22 C -62.64 3.29 0.00
407 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.266 128
115.56 C -64.03 -6.97 0.00
419 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.096 125
116.68 C 0.54 -66.62 1.00
420 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.130 104
64.63 C 0.00 100.96 1.00
432 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.324 110
211.01 C 56.94 68.46 0.15
433 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.388 109
210.73 C 71.47 -77.51 0.15
496 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.206 109
174.27 C 16.45 -89.73 1.10
497 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.207 110
133.87 C 19.51 88.38 1.15
512 ST HE200A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.015 103
28.20 C 0.00 -0.50 1.50
513 ST HE200A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.015 104
28.20 C 0.00 0.50 1.50
528 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.284 129
377.17 C -59.10 -8.50 0.00
529 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.382 103
596.12 C 26.77 153.18 0.00
530 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.383 103
373.49 C 1.21 -260.43 2.50
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 27 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
531 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.303 110
71.94 C 56.94 68.49 0.00
537 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.361 129
405.22 C -80.58 3.51 0.00
538 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1A-C 0.491 104
625.96 C 37.23 -153.71 0.00
541 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.363 109
48.10 C 71.47 -77.53 0.00
543 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.395 110
339.41 C -6.48 259.07 2.50
553 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.109 104
45.02 C 0.76 -70.23 0.00
555 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.091 110
22.37 C 0.00 67.45 3.62
556 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.110 104
26.44 C 0.00 81.60 3.62
566 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.506 109
256.77 C -72.07 -165.14 2.34
567 ST HE400A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.439 110
271.93 C -56.99 153.86 2.34
1035. *FOR LONGITUDIONAL BEAMS
1036. CHECK CODE MEMB 53 TO 64 89 TO 92 94 96 102 TO 105 107 109 132 150 152 154 -
1037. 156 158 180 182 184 186 187 189 255 256 258 261 TO 263 265 267 269 272 273 -
1038. 275 277 TO 279 281 283 285 301 303 308 TO 310 313 315 317 322 TO 325 327 -
1039. 329 331 TO 333 335 337 338 356 368 369 374 380 381 408 409 416 421 422 429 -
1040. 434 435 480 481 486 487 490 493 526 527 532 TO 535 539 540 544 545 554 557 -
1041. 558 TO 559
53 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.240 110
45.64 T 2.26 -30.57 2.25
54 ST IPE450 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.266 129
16.25 T -0.14 -128.64 2.25
55 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.103 104
78.12 T -0.94 -9.76 2.50
56 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.239 109
47.10 T -2.19 -30.58 2.25
57 ST IPE450 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.270 102
37.24 C -0.32 -126.98 2.25
58 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.126 104
168.23 T -1.08 -8.49 2.50
59 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.249 110
18.16 C 2.30 -30.79 2.25
60 ST IPE450 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.356 125
3.55 C -0.17 -173.36 2.25
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 28 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
61 ST IPE360 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.062 125
11.40 T -0.03 17.58 1.90
62 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.249 109
15.76 C -2.40 -30.78 2.25
63 ST IPE450 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.285 129
49.12 C -0.49 -132.12 2.25
64 ST IPE360 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.084 129
81.71 C 0.11 16.79 1.75
89 ST IPE450 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.392 129
15.39 T 1.06 -185.16 2.75
90 ST IPE450 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.392 129
14.60 T 1.06 -185.16 0.00
91 ST IPE450 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.299 129
14.06 T -0.18 -144.75 0.00
92 ST IPE450 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.595 125
3.54 C 0.07 -291.23 2.75
94 ST IPE450 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.595 125
3.54 C 0.07 -291.23 0.00
96 ST IPE450 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.395 125
3.53 C -0.13 -193.10 0.00
102 ST IPE450 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.396 102
38.03 C 1.03 -184.33 2.75
103 ST IPE450 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.400 102
54.46 C 1.03 -184.33 0.00
104 ST IPE450 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.305 102
55.15 C -0.32 -141.87 0.00
105 ST IPE450 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.430 129
50.05 C 1.62 -195.99 2.75
107 ST IPE450 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.437 129
79.76 C 1.62 -195.99 0.00
109 ST IPE450 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.324 129
80.48 C -0.50 -147.26 0.00
132 ST HE100A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.008 108
1.95 C 0.00 -0.14 1.12
150 ST HE100A (EUROPEAN SECTIONS)
PASS LRFD-H1-1A-C 0.413 102
144.77 C 0.00 -0.16 1.12
152 ST HE100A (EUROPEAN SECTIONS)
PASS LRFD-H1-1A-C 0.569 129
148.82 C 0.00 -0.24 1.38
154 ST HE100A (EUROPEAN SECTIONS)
PASS LRFD-H1-1A-C 0.574 129
150.00 C 0.00 -0.24 1.37
156 ST HE100A (EUROPEAN SECTIONS)
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 29 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
PASS LRFD-H1-1A-C 0.601 129
157.23 C 0.00 -0.24 1.37
158 ST HE100A (EUROPEAN SECTIONS)
PASS LRFD-H1-1A-C 0.217 129
64.99 C 0.00 -0.20 1.25
180 ST HE100A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.009 108
2.36 C 0.00 -0.14 1.12
182 ST HE100A (EUROPEAN SECTIONS)
PASS LRFD-H1-1A-C 0.666 129
234.62 C 0.00 -0.16 1.12
184 ST HE100A (EUROPEAN SECTIONS)
PASS LRFD-H1-1A-C 0.794 129
208.53 C 0.00 -0.24 1.38
186 ST HE100A (EUROPEAN SECTIONS)
PASS LRFD-H1-1A-C 0.796 129
209.20 C 0.00 -0.24 1.37
187 ST HE100A (EUROPEAN SECTIONS)
PASS LRFD-H1-1A-C 0.696 129
182.52 C 0.00 -0.24 1.37
189 ST HE100A (EUROPEAN SECTIONS)
PASS LRFD-H1-1A-C 0.308 129
92.94 C 0.00 -0.20 1.25
255 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.240 110
45.26 T 2.26 -30.57 0.00
256 ST HE100A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.010 108
3.39 C 0.00 -0.14 1.13
258 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.239 109
46.90 T -2.19 -30.58 0.00
261 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.169 103
145.70 T -1.31 16.15 1.00
262 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.112 110
121.85 T -0.87 -9.28 0.00
263 ST HE100A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.039 128
44.11 T 0.00 -0.13 1.00
265 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.192 104
216.55 T 1.35 16.18 1.00
267 ST HE100A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.011 101
1.60 C 0.00 -0.20 1.25
269 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.110 109
115.77 T 0.90 -9.15 0.00
272 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.250 110
18.43 C 2.30 -30.79 0.00
273 ST HE100A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.011 108
3.88 C 0.00 -0.14 1.13
275 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.249 109
15.88 C -2.40 -30.78 0.00
277 ST IPE360 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.086 125
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 30 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
35.52 C -0.04 -22.29 0.00
278 ST IPE360 (EUROPEAN SECTIONS)
PASS SHEAR-Y 0.083 125
35.86 C -0.01 13.44 0.60
279 ST HE100A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.069 129
51.64 C 0.00 -0.13 1.00
281 ST IPE360 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.076 129
88.68 C 0.07 -14.68 1.00
283 ST HE100A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.011 101
1.60 C 0.00 -0.20 1.25
285 ST IPE360 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.090 129
104.07 C -0.02 -16.82 0.00
301 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.069 110
0.20 C 2.19 -1.38 2.25
303 ST IPE360 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.180 109
0.10 T -10.09 2.16 3.50
308 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.076 103
0.07 T -2.20 -3.43 2.25
309 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.098 128
0.15 T 0.01 -16.70 2.25
310 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.094 128
66.33 C -0.03 -10.94 2.50
313 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.083 103
2.34 C -2.18 -4.24 2.25
315 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.112 110
13.95 C -0.53 -15.59 2.25
317 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.041 110
32.08 C -0.56 -2.05 2.50
322 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.168 129
8.65 C 0.02 -27.74 2.75
323 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.182 129
36.31 C 0.02 -27.74 0.00
324 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.140 110
40.40 C -0.62 -17.61 0.00
325 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.154 128
31.50 C -0.03 -23.31 2.75
327 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.154 128
31.50 C -0.03 -23.31 0.00
329 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.147 128
66.37 C -0.04 -18.97 0.00
331 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.039 110
32.08 C -0.56 -2.05 0.00
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 31 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
332 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.031 110
2.15 T -0.55 -2.79 0.00
333 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.073 103
23.26 C 0.42 -9.37 0.00
335 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.070 103
23.26 C 0.41 -8.62 0.00
337 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.083 103
2.34 C -2.18 -4.24 0.00
338 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.076 103
0.07 T -2.20 -3.43 0.00
356 ST IPE360 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.180 109
0.01 C -10.09 2.16 0.00
368 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.086 104
11.93 C 2.35 -1.38 2.25
369 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.086 103
12.11 C -2.35 -1.38 2.25
374 ST HE280A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.194 110
0.40 C 15.64 -19.93 5.25
380 ST IPE360 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.172 110
3.13 T 9.79 1.38 3.50
381 ST IPE360 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.173 110
3.94 T 9.79 1.38 0.00
408 ST HE200A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.039 104
58.96 T -0.77 -1.25 1.52
409 ST HE200A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.039 103
58.98 T 0.77 -1.25 1.52
416 ST HE100A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.008 101
0.05 C 0.00 -0.20 1.25
421 ST HE200A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.016 109
0.02 C 0.78 -0.46 1.30
422 ST HE200A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.016 104
0.01 C -0.78 -0.46 1.30
429 ST HE100A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.009 125
0.02 C 0.00 -0.21 1.30
434 ST HE200A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.074 129
0.00 C -0.07 9.83 0.00
435 ST HE200A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.074 129
0.00 C 0.07 9.82 0.00
480 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.161 109
149.98 T -1.13 15.34 0.00
481 ST IPE300 (EUROPEAN SECTIONS)
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 32 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
PASS LRFD-H1-1B-T 0.164 110
164.67 T 1.11 15.14 0.00
486 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.044 110
33.82 C -0.55 -2.80 1.00
487 ST IPE360 (EUROPEAN SECTIONS)
PASS SHEAR-Y 0.121 125
36.05 C -0.02 17.58 0.00
490 ST IPE360 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.058 128
25.88 C -0.07 14.48 0.00
493 ST IPE360 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.085 109
77.30 C 0.74 -14.90 1.00
526 ST IPE360 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.088 109
76.82 C -0.82 14.67 0.00
527 ST IPE360 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.070 104
17.95 T 0.83 15.42 0.00
532 ST HE280A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.331 110
82.46 T -5.58 -81.86 3.50
533 ST HE280A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.484 125
51.89 T -0.02 -138.29 2.33
534 ST HE280A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.362 128
256.84 C 0.86 77.10 0.00
535 ST HE280A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.331 110
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 33 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
82.29 T -5.57 -81.86 0.00
539 ST HE280A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.403 129
80.27 T 1.12 -111.43 2.33
540 ST HE280A (EUROPEAN SECTIONS)
PASS LRFD-H1-1A-C 0.560 128
336.85 C -1.00 103.36 0.00
544 ST HE280A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.414 129
109.69 T 0.04 -115.06 3.50
545 ST HE280A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.414 129
109.35 T 0.04 -115.06 0.00
554 ST IPE360 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.175 110
0.07 C -10.05 1.04 3.50
557 ST IPE360 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.192 109
2.35 T 10.94 1.54 3.50
558 ST IPE360 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.192 109
1.71 T 10.94 1.54 0.00
559 ST IPE360 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.175 104
0.05 T -10.04 1.05 0.00
1042. *VERTICAL BRACINGS
1043. CHECK CODE MEMB 357 358 382 383 410 411 477 479 482 TO 485 488 489 491 492 -
1044. 518 TO 521 536 546 551 552 560 TO 563 568 TO 575
357 T IPE400 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.101 103
5.71 C -1.68 -0.94 2.52
358 T IPE400 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.100 110
5.52 C -1.68 -0.94 2.52
382 T IPE400 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.092 103
4.25 C -1.54 -0.90 2.41
383 T IPE400 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.092 110
4.50 C -1.54 -0.90 2.41
410 T IPE400 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.115 104
81.75 C -0.73 -0.50 1.80
411 T IPE400 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.115 103
81.75 C 0.73 -0.50 1.80
477 ST IPE400 (EUROPEAN SECTIONS)
PASS LRFD-H1-1A-C 0.353 129
361.85 C 2.04 -0.01 0.00
479 ST IPE400 (EUROPEAN SECTIONS)
PASS LRFD-H1-1A-C 0.254 110
230.14 C 1.45 9.86 4.21
482 T IPE400 (EUROPEAN SECTIONS)
PASS LRFD-H1-1A-C 0.559 128
254.36 C 0.00 -0.94 2.15
483 T IPE400 (EUROPEAN SECTIONS)
PASS LRFD-H1-1A-C 0.468 129
211.53 C 0.00 -0.94 2.15
484 T IPE400 (EUROPEAN SECTIONS)
PASS LRFD-H1-1A-C 0.681 128
311.70 C 0.00 -0.94 2.15
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 34 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
485 T IPE400 (EUROPEAN SECTIONS)
PASS LRFD-H1-1A-C 0.585 129
266.93 C 0.00 -0.94 2.15
488 T IPE400 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.091 128
114.40 C 0.00 -0.32 1.34
489 T IPE400 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.021 110
6.61 C 0.29 -0.19 1.13
491 T IPE400 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.087 129
109.61 C 0.00 -0.32 1.34
492 T IPE400 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.025 103
12.64 C 0.29 -0.19 1.13
518 T IPE400 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.100 128
130.66 C 0.00 -0.28 1.29
519 T IPE400 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.047 129
56.94 C 0.00 -0.28 1.29
520 T IPE400 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.072 128
91.57 C 0.00 -0.28 1.29
521 T IPE400 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.089 129
114.66 C 0.00 -0.28 1.29
536 T IPE400 (EUROPEAN SECTIONS)
PASS LRFD-H1-1A-T 0.227 128
233.15 T 0.00 -0.89 2.04
546 T IPE400 (EUROPEAN SECTIONS)
PASS LRFD-H1-1A-C 0.316 109
133.10 C 0.93 -0.77 2.04
551 T IPE400 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.040 109
29.36 C 0.35 -0.21 1.24
552 T IPE400 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.055 128
70.02 C 0.00 -0.25 1.24
560 T IPE400 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.135 103
3.53 C -2.41 -1.13 3.02
561 T IPE400 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.137 109
4.26 C 2.41 -1.13 3.02
562 T IPE400 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.098 110
3.84 C 1.68 -0.94 2.52
563 T IPE400 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.098 104
3.70 C -1.68 -0.94 2.52
568 T IPE400 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.076 104
15.57 C -0.99 -0.79 2.10
569 T IPE400 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.072 110
27.13 T -0.99 -0.79 2.10
570 ST IPE400 (EUROPEAN SECTIONS)
PASS LRFD-H1-1A-C 0.372 129
387.49 C 1.71 -0.01 0.00
571 ST IPE400 (EUROPEAN SECTIONS)
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 35 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
PASS LRFD-H1-1A-C 0.271 110
249.42 C 1.45 9.86 0.00
572 T IPE400 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.116 109
46.91 C 1.42 -0.66 1.75
573 T IPE400 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.107 110
36.79 C -1.42 -0.66 1.75
574 T IPE400 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.035 128
52.61 C 0.00 0.00 0.00
575 T IPE400 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.028 110
43.47 T 0.00 0.25 1.05
1045. *FOR PLAN BRACINGS
1046. CHECK CODE MEMB 192 TO 195 201 TO 204 500 TO 511
192 ST L130X130X12 (EUROPEAN SECTIONS)
PASS COMPRESSION 0.210 104
37.30 C 0.00 0.00 0.00
193 ST L130X130X12 (EUROPEAN SECTIONS)
PASS COMPRESSION 0.253 109
38.84 C 0.00 0.00 0.00
194 ST L130X130X12 (EUROPEAN SECTIONS)
PASS COMPRESSION 0.147 131
22.62 C 0.00 0.00 0.00
195 ST L130X130X12 (EUROPEAN SECTIONS)
PASS COMPRESSION 0.184 132
28.21 C 0.00 0.00 0.00
201 ST L130X130X12 (EUROPEAN SECTIONS)
PASS COMPRESSION 0.197 128
34.96 C 0.00 0.00 0.00
202 ST L130X130X12 (EUROPEAN SECTIONS)
PASS COMPRESSION 0.164 129
25.24 C 0.00 0.00 0.00
203 ST L130X130X12 (EUROPEAN SECTIONS)
PASS COMPRESSION 0.231 128
35.40 C 0.00 0.00 0.00
204 ST L130X130X12 (EUROPEAN SECTIONS)
PASS COMPRESSION 0.161 131
24.72 C 0.00 0.00 0.00
500 ST L130X130X12 (EUROPEAN SECTIONS)
PASS COMPRESSION 0.761 110
125.62 C 0.00 0.00 0.00
501 ST L130X130X12 (EUROPEAN SECTIONS)
PASS COMPRESSION 0.542 109
89.43 C 0.00 0.00 0.00
502 ST L130X130X12 (EUROPEAN SECTIONS)
PASS COMPRESSION 0.454 110
86.19 C 0.00 0.00 0.00
503 ST L130X130X12 (EUROPEAN SECTIONS)
PASS COMPRESSION 0.363 109
68.88 C 0.00 0.00 0.00
504 ST L130X130X12 (EUROPEAN SECTIONS)
PASS COMPRESSION 0.408 110
67.39 C 0.00 0.00 0.00
505 ST L130X130X12 (EUROPEAN SECTIONS)
PASS COMPRESSION 0.324 109
53.44 C 0.00 0.00 0.00
506 ST L130X130X12 (EUROPEAN SECTIONS)
PASS COMPRESSION 0.555 129
91.63 C 0.00 0.00 0.00
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 36 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
507 ST L130X130X12 (EUROPEAN SECTIONS)
PASS COMPRESSION 0.392 129
64.67 C 0.00 0.00 0.00
508 ST L130X130X12 (EUROPEAN SECTIONS)
PASS COMPRESSION 0.296 129
56.10 C 0.00 0.00 0.00
509 ST L130X130X12 (EUROPEAN SECTIONS)
PASS COMPRESSION 0.176 110
33.44 C 0.00 0.00 0.00
510 ST L130X130X12 (EUROPEAN SECTIONS)
PASS COMPRESSION 0.367 129
60.63 C 0.00 0.00 0.00
511 ST L130X130X12 (EUROPEAN SECTIONS)
PASS COMPRESSION 0.258 110
42.67 C 0.00 0.00 0.00
1047. *FOR PLAN BRACINGS
1048. CHECK CODE MEMB 201 TO 204 340 TO 343 353 TO 355 417 418 430 431
201 ST L130X130X12 (EUROPEAN SECTIONS)
PASS COMPRESSION 0.197 128
34.96 C 0.00 0.00 0.00
202 ST L130X130X12 (EUROPEAN SECTIONS)
PASS COMPRESSION 0.164 129
25.24 C 0.00 0.00 0.00
203 ST L130X130X12 (EUROPEAN SECTIONS)
PASS COMPRESSION 0.231 128
35.40 C 0.00 0.00 0.00
204 ST L130X130X12 (EUROPEAN SECTIONS)
PASS COMPRESSION 0.161 131
24.72 C 0.00 0.00 0.00
340 ST L130X130X12 (EUROPEAN SECTIONS)
PASS COMPRESSION 0.098 103
26.82 C 0.00 0.00 0.00
341 ST L130X130X12 (EUROPEAN SECTIONS)
PASS COMPRESSION 0.095 110
21.28 C 0.00 0.00 0.00
342 ST L130X130X12 (EUROPEAN SECTIONS)
PASS COMPRESSION 0.105 128
23.53 C 0.00 0.00 0.00
343 ST L130X130X12 (EUROPEAN SECTIONS)
PASS COMPRESSION 0.084 129
18.76 C 0.00 0.00 0.00
353 ST L130X130X12 (EUROPEAN SECTIONS)
PASS COMPRESSION 0.108 129
26.64 C 0.00 0.00 0.00
354 ST L130X130X12 (EUROPEAN SECTIONS)
PASS COMPRESSION 0.101 128
30.34 C 0.00 0.00 0.00
355 ST L130X130X12 (EUROPEAN SECTIONS)
PASS COMPRESSION 0.126 110
31.27 C 0.00 0.00 0.00
417 ST L130X130X12 (EUROPEAN SECTIONS)
PASS COMPRESSION 0.021 104
3.39 C 0.00 0.00 0.00
418 ST L130X130X12 (EUROPEAN SECTIONS)
PASS COMPRESSION 0.021 109
3.40 C 0.00 0.00 0.00
430 ST L130X130X12 (EUROPEAN SECTIONS)
PASS COMPRESSION 0.015 110
2.40 C 0.00 0.00 0.00
431 ST L130X130X12 (EUROPEAN SECTIONS)
PASS COMPRESSION 0.015 103
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 37 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
2.44 C 0.00 0.00 0.00
1050. LOAD LIST 101 TO 133 151 TO 154
1051. *TRANSVERSE BEAMS
1052. CHECK CODE MEMB 5 6 18 19 31 32 44 45 128 131 133 135 139 149 151 153 155 -
1053. 159 162 TO 164 181 183 185 257 259 264 266 268 270 274 276 280 282 284 286 -
1054. 289 TO 296 318 TO 321 326 328 330 334 336 339 384 412 TO 415 425 TO 428 436 -
1055. 522 TO 525 564
5 ST IPE360 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.392 109
11.03 T 0.10 102.17 0.00
6 ST IPE360 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.341 103
9.69 C -0.10 99.27 0.00
18 ST HE280A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.558 103
9.47 C -0.18 190.43 0.00
19 ST HE280A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.505 103
3.12 T 0.07 173.02 0.00
31 ST IPE360 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.850 109
19.37 C 0.05 221.29 0.00
32 ST IPE360 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.611 109
5.52 C 0.04 179.85 0.00
44 ST IPE360 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.691 109
23.52 T 0.06 180.20 0.00
45 ST IPE360 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.527 103
27.44 C -0.01 152.57 0.00
128 ST IPE360 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.408 110
26.19 T 0.11 105.30 3.50
131 ST HE280A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.598 110
71.73 T -23.83 148.82 2.92
133 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.414 129
0.49 C -0.62 -60.99 3.50
135 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.416 154
0.55 C 0.34 -62.39 3.50
139 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.380 152
0.85 T 0.44 -56.44 3.50
149 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.414 129
0.69 T -0.62 -60.99 0.00
151 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.380 152
0.79 T 0.44 -56.44 0.00
153 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.416 154
0.67 T 0.34 -62.39 0.00
155 ST IPE360 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.864 104
27.66 C 0.04 223.95 3.50
159 ST IPE360 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.680 104
7.48 T 0.05 178.28 3.50
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 38 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
162 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.417 129
1.16 C -0.86 -60.44 3.50
163 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.571 125
0.16 T 0.01 -87.62 2.62
164 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.405 154
1.00 C 0.51 -59.99 3.50
181 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.416 129
0.98 T -0.86 -60.44 0.00
183 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.546 125
0.16 T 0.02 -83.78 0.00
185 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.404 154
0.98 T 0.51 -59.99 0.00
257 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.373 129
0.05 T -0.88 -53.78 3.50
259 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.373 129
0.05 T -0.88 -53.78 0.00
264 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.440 153
65.65 C -1.00 -56.54 3.50
266 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.438 153
62.98 C -1.00 -56.54 0.00
268 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.424 153
42.11 C -1.03 -56.56 3.50
270 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.422 153
39.45 C -1.03 -56.56 0.00
274 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.390 128
0.04 C 1.52 -53.78 3.50
276 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.390 128
0.04 C 1.52 -53.78 0.00
280 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.506 125
0.77 C 0.02 -77.48 2.92
282 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.500 125
3.84 C 0.02 -76.24 0.00
284 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.471 153
51.75 C -0.62 -64.42 3.50
286 ST IPE300 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.456 153
29.47 C -0.62 -64.42 0.00
289 ST IPE360 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.412 110
65.03 C -0.03 100.96 3.50
290 ST HE280A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.570 110
81.68 C -0.13 189.43 3.50
291 ST IPE360 (EUROPEAN SECTIONS)
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 39 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
PASS LRFD-H1-1B-C 0.793 104
27.27 C -0.01 205.63 3.50
292 ST IPE360 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.651 104
37.24 C 0.00 167.17 3.50
293 ST IPE360 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.198 110
65.02 C -1.18 -48.95 0.00
294 ST HE280A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.335 128
20.14 C -37.10 -31.93 1.00
295 ST IPE360 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.261 104
56.67 C 0.10 -76.72 0.00
296 ST IPE360 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.212 104
37.24 C 0.06 -63.67 0.00
318 ST HE140A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.382 103
17.39 C 0.01 18.89 0.00
319 ST HE140A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.431 109
6.12 T -0.05 21.90 0.00
320 ST HE140A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.539 103
7.41 T 0.06 27.36 0.00
321 ST HE140A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.243 103
1.71 T 0.13 12.16 0.00
326 ST L130X130X12 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.105 101
0.01 T 0.00 -1.93 1.46
328 ST L130X130X12 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.105 101
0.01 T 0.00 -1.93 1.46
330 ST L130X130X12 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.105 128
0.02 C 0.00 -1.93 1.46
334 ST L130X130X12 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.105 101
0.00 T 0.00 -1.93 1.46
336 ST L130X130X12 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.105 101
0.00 T 0.00 -1.93 1.46
339 ST L130X130X12 (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.105 101
0.00 T 0.00 -1.93 1.46
384 ST HE280A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.233 110
2.58 C 0.00 67.46 7.00
412 ST HE200A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.044 101
28.68 T -0.08 -4.36 3.50
413 ST HE200A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.447 101
0.00 T -0.19 -56.03 3.50
414 ST HE200A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.447 101
0.02 T -0.19 -56.03 0.00
415 ST HE200A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.045 101
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 40 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
28.68 T -0.08 -4.36 0.00
425 ST HE200A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.445 101
0.00 C -0.02 -56.05 3.50
426 ST HE200A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.039 125
12.04 T -0.03 -4.43 3.50
427 ST HE200A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.039 125
12.04 T -0.03 -4.43 0.00
428 ST HE200A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.445 152
0.00 T -0.02 -56.05 0.00
436 ST HE200A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.336 102
0.08 T -21.05 0.00 3.50
522 ST HE300B (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.529 104
4.71 T 144.59 0.15 7.00
523 ST HE300B (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.790 110
5.66 T -0.06 410.85 7.00
524 ST HE300B (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-T 0.601 103
4.60 T 0.05 312.51 0.00
525 ST HE300B (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.275 110
0.51 C -0.09 143.13 7.00
564 ST HE280A (EUROPEAN SECTIONS)
PASS LRFD-H1-1B-C 0.282 104
5.30 C 0.00 81.60 7.00

************** END OF TABULATED RESULT OF DESIGN **************

1056. *********************
1057. STEEL TAKE OFF LIST 1 TO 6 14 TO 19 27 TO 32 40 TO 45 53 TO 64 89 TO 92 94 -

STEEL TAKE-OFF
--------------

PROFILE LENGTH(METE) WEIGHT(KN )

1058. 96 102 TO 105 107 109 128 131 TO 133 135 139 149 TO 156 158 159 162 TO 164 -
1059. 180 TO 187 189 192 TO 195 201 TO 204 255 TO 259 261 TO 270 272 TO 286 289 -
1060. 290 TO 301 303 TO 343 353 TO 358 364 TO 369 374 378 TO 385 406 TO 422 425 -
1061. 426 TO 436 477 479 TO 493 496 497 500 TO 513 518 TO 541 543 TO 546 -
1062. 551 TO 564 566 TO 573
ST HE400A 127.20 155.366
ST IPE360 84.00 46.912
ST HE280A 66.50 49.706
ST IPE300 173.50 71.706
ST IPE450 42.00 31.877
ST HE100A 49.10 7.996
ST L130X130X12 142.67 32.880
ST HE140A 16.40 3.956
T IPE400 115.09 37.355
ST HE200A 53.00 21.905
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 41 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
ST IPE400 16.84 10.928
ST HE300B 28.00 32.049
PRISMATIC STEEL 0.00 0.000
----------------
TOTAL = 502.636

1063. LOAD LIST 101 TO 133 151 TO 154


1064. PRINT SUPPORT REACTION

SUPPORT REACTIONS -UNIT KN METE STRUCTURE TYPE = SPACE


-----------------

JOINT LOAD FORCE-X FORCE-Y FORCE-Z MOM-X MOM-Y MOM Z

1 101 22.39 205.12 14.79 0.00 0.00 0.00


102 21.24 202.21 16.95 0.00 0.00 0.00
103 -34.60 96.97 15.86 0.00 0.00 0.00
104 36.24 252.14 15.08 0.00 0.00 0.00
105 -4.85 160.73 15.48 0.00 0.00 0.00
106 7.09 188.39 15.40 0.00 0.00 0.00
107 1.14 174.56 15.17 0.00 0.00 0.00
108 1.11 174.56 15.71 0.00 0.00 0.00
109 -34.60 97.04 17.70 0.00 0.00 0.00
110 36.24 252.16 16.72 0.00 0.00 0.00
111 -4.85 160.77 17.25 0.00 0.00 0.00
112 7.09 188.43 17.12 0.00 0.00 0.00
113 1.15 174.60 16.92 0.00 0.00 0.00
114 1.12 174.60 17.45 0.00 0.00 0.00
115 -34.72 16.33 8.67 0.00 0.00 0.00
116 35.88 169.85 7.65 0.00 0.00 0.00
117 -5.08 85.69 8.87 0.00 0.00 0.00
118 6.82 113.11 8.76 0.00 0.00 0.00
119 0.89 99.40 8.53 0.00 0.00 0.00
120 0.86 99.40 9.10 0.00 0.00 0.00
121 -3.29 83.51 8.17 0.00 0.00 0.00
122 5.05 102.68 8.09 0.00 0.00 0.00
123 0.90 93.09 7.93 0.00 0.00 0.00
124 0.87 93.09 8.33 0.00 0.00 0.00
125 1.32 150.65 3.42 0.00 0.00 0.00
126 -5.27 115.15 3.04 0.00 0.00 0.00
127 7.52 143.10 2.85 0.00 0.00 0.00
128 22.40 205.14 14.70 0.00 0.00 0.00
129 21.24 202.21 17.00 0.00 0.00 0.00
130 1.13 174.57 15.36 0.00 0.00 0.00
131 1.12 174.55 15.51 0.00 0.00 0.00
132 1.14 174.61 17.12 0.00 0.00 0.00
133 1.13 174.60 17.25 0.00 0.00 0.00
151 23.00 206.67 14.68 0.00 0.00 0.00
152 20.63 200.66 17.06 0.00 0.00 0.00
153 23.00 206.68 14.63 0.00 0.00 0.00
154 20.63 200.65 17.11 0.00 0.00 0.00
2 101 -21.25 248.15 15.30 0.00 0.00 0.00
102 -22.40 251.08 16.41 0.00 0.00 0.00
103 -36.08 291.56 15.45 0.00 0.00 0.00
104 34.43 136.39 16.14 0.00 0.00 0.00
105 -7.06 227.80 15.73 0.00 0.00 0.00
106 4.81 200.14 15.80 0.00 0.00 0.00
107 -1.15 213.97 15.49 0.00 0.00 0.00
108 -1.12 213.97 16.04 0.00 0.00 0.00
109 -36.08 291.49 16.24 0.00 0.00 0.00
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 42 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
110 34.44 136.37 17.06 0.00 0.00 0.00
111 -7.06 227.76 16.58 0.00 0.00 0.00
112 4.82 200.10 16.67 0.00 0.00 0.00
113 -1.15 213.92 16.35 0.00 0.00 0.00
114 -1.12 213.93 16.90 0.00 0.00 0.00
115 -35.79 192.83 7.64 0.00 0.00 0.00
116 34.62 39.31 8.55 0.00 0.00 0.00
117 -6.80 137.18 8.70 0.00 0.00 0.00
118 5.07 109.76 8.80 0.00 0.00 0.00
119 -0.89 123.47 8.45 0.00 0.00 0.00
120 -0.86 123.47 9.05 0.00 0.00 0.00
121 -5.03 125.66 8.04 0.00 0.00 0.00
122 3.27 106.48 8.11 0.00 0.00 0.00
123 -0.90 116.07 7.86 0.00 0.00 0.00
124 -0.87 116.07 8.29 0.00 0.00 0.00
125 -1.33 212.12 3.60 0.00 0.00 0.00
126 -7.49 195.80 3.03 0.00 0.00 0.00
127 5.23 167.85 3.20 0.00 0.00 0.00
128 -21.24 248.14 14.96 0.00 0.00 0.00
129 -22.40 251.09 16.65 0.00 0.00 0.00
130 -1.13 213.97 15.50 0.00 0.00 0.00
131 -1.14 213.98 16.03 0.00 0.00 0.00
132 -1.13 213.92 16.36 0.00 0.00 0.00
133 -1.14 213.93 16.88 0.00 0.00 0.00
151 -20.65 246.59 15.21 0.00 0.00 0.00
152 -23.00 252.65 16.50 0.00 0.00 0.00
153 -20.64 246.58 14.96 0.00 0.00 0.00
154 -23.00 252.66 16.74 0.00 0.00 0.00
3 101 18.19 256.44 7.17 0.00 0.00 0.00
102 17.14 261.33 9.06 0.00 0.00 0.00
103 -70.41 44.54 5.38 0.00 0.00 0.00
104 67.78 394.40 5.43 0.00 0.00 0.00
105 -9.66 194.33 5.25 0.00 0.00 0.00
106 10.08 244.65 5.32 0.00 0.00 0.00
107 0.64 220.28 4.88 0.00 0.00 0.00
108 -0.16 218.70 5.69 0.00 0.00 0.00
109 -70.42 50.17 7.33 0.00 0.00 0.00
110 66.98 398.58 6.55 0.00 0.00 0.00
111 -10.03 199.34 6.85 0.00 0.00 0.00
112 9.61 249.46 6.81 0.00 0.00 0.00
113 0.23 225.20 6.42 0.00 0.00 0.00
114 -0.58 223.60 7.23 0.00 0.00 0.00
115 -69.71 -55.06 3.36 0.00 0.00 0.00
116 67.49 288.82 2.95 0.00 0.00 0.00
117 -9.51 100.39 3.29 0.00 0.00 0.00
118 10.11 149.93 3.31 0.00 0.00 0.00
119 0.74 125.96 2.87 0.00 0.00 0.00
120 -0.08 124.36 3.73 0.00 0.00 0.00
121 -6.49 99.58 3.04 0.00 0.00 0.00
122 7.24 134.22 3.05 0.00 0.00 0.00
123 0.68 117.46 2.74 0.00 0.00 0.00
124 0.11 116.34 3.35 0.00 0.00 0.00
125 -3.06 281.64 1.37 0.00 0.00 0.00
126 -15.21 209.65 1.23 0.00 0.00 0.00
127 9.84 273.17 1.17 0.00 0.00 0.00
128 18.92 261.12 7.15 0.00 0.00 0.00
129 16.57 257.90 9.08 0.00 0.00 0.00
130 0.77 222.85 5.24 0.00 0.00 0.00
131 -0.30 216.11 5.32 0.00 0.00 0.00
132 0.38 227.80 6.79 0.00 0.00 0.00
133 -0.74 220.98 6.87 0.00 0.00 0.00
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 43 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
151 18.50 256.89 7.07 0.00 0.00 0.00
152 16.83 260.88 9.16 0.00 0.00 0.00
153 19.01 260.23 7.06 0.00 0.00 0.00
154 16.26 257.45 9.18 0.00 0.00 0.00
4 101 -17.08 307.27 7.73 0.00 0.00 0.00
102 -18.57 302.49 8.64 0.00 0.00 0.00
103 -67.35 438.71 5.82 0.00 0.00 0.00
104 70.68 88.80 5.76 0.00 0.00 0.00
105 -9.70 288.88 5.72 0.00 0.00 0.00
106 10.02 238.56 5.64 0.00 0.00 0.00
107 0.52 262.90 5.27 0.00 0.00 0.00
108 -0.28 264.54 6.08 0.00 0.00 0.00
109 -67.81 433.07 6.28 0.00 0.00 0.00
110 69.63 84.67 6.73 0.00 0.00 0.00
111 -10.41 283.90 6.40 0.00 0.00 0.00
112 9.24 233.77 6.40 0.00 0.00 0.00
113 -0.21 258.00 6.00 0.00 0.00 0.00
114 -1.02 259.67 6.80 0.00 0.00 0.00
115 -67.71 314.32 3.01 0.00 0.00 0.00
116 69.68 -29.56 3.27 0.00 0.00 0.00
117 -10.24 176.05 3.31 0.00 0.00 0.00
118 9.41 126.51 3.27 0.00 0.00 0.00
119 -0.04 150.46 2.85 0.00 0.00 0.00
120 -0.85 152.10 3.73 0.00 0.00 0.00
121 -7.36 159.66 3.05 0.00 0.00 0.00
122 6.39 125.03 3.02 0.00 0.00 0.00
123 -0.22 141.77 2.73 0.00 0.00 0.00
124 -0.79 142.92 3.34 0.00 0.00 0.00
125 -3.41 320.25 1.52 0.00 0.00 0.00
126 -15.39 306.26 1.32 0.00 0.00 0.00
127 9.63 242.74 1.38 0.00 0.00 0.00
128 -16.70 302.57 7.46 0.00 0.00 0.00
129 -18.88 305.96 8.82 0.00 0.00 0.00
130 0.40 260.35 5.46 0.00 0.00 0.00
131 -0.17 267.12 5.88 0.00 0.00 0.00
132 -0.31 255.41 6.19 0.00 0.00 0.00
133 -0.93 262.29 6.60 0.00 0.00 0.00
151 -16.77 306.79 7.66 0.00 0.00 0.00
152 -18.88 302.98 8.71 0.00 0.00 0.00
153 -16.50 303.44 7.46 0.00 0.00 0.00
154 -19.20 306.46 8.90 0.00 0.00 0.00
5 101 12.29 706.63 4.93 0.00 0.00 0.00
102 16.20 78.40 -29.67 0.00 0.00 0.00
103 -98.93 209.57 0.08 0.00 0.00 0.00
104 87.58 940.44 15.39 0.00 0.00 0.00
105 -13.49 529.06 6.70 0.00 0.00 0.00
106 11.02 619.84 8.38 0.00 0.00 0.00
107 -1.41 630.13 10.25 0.00 0.00 0.00
108 -0.91 518.77 4.84 0.00 0.00 0.00
109 -101.06 -263.14 -24.19 0.00 0.00 0.00
110 95.24 466.04 -10.32 0.00 0.00 0.00
111 -11.44 55.67 -18.20 0.00 0.00 0.00
112 14.41 146.13 -16.69 0.00 0.00 0.00
113 1.31 156.54 -14.89 0.00 0.00 0.00
114 1.82 45.26 -19.99 0.00 0.00 0.00
115 -99.49 -173.07 -9.52 0.00 0.00 0.00
116 91.71 544.32 4.62 0.00 0.00 0.00
117 -12.26 151.93 -3.60 0.00 0.00 0.00
118 12.90 241.01 -2.06 0.00 0.00 0.00
119 0.14 252.03 -0.23 0.00 0.00 0.00
120 0.65 140.91 -5.43 0.00 0.00 0.00
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 44 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
121 -8.40 153.95 -3.17 0.00 0.00 0.00
122 9.21 216.23 -2.10 0.00 0.00 0.00
123 0.26 223.98 -0.81 0.00 0.00 0.00
124 0.62 146.20 -4.45 0.00 0.00 0.00
125 1.64 397.43 -9.59 0.00 0.00 0.00
126 -16.16 274.31 -9.53 0.00 0.00 0.00
127 18.68 407.02 -6.89 0.00 0.00 0.00
128 10.98 900.02 14.65 0.00 0.00 0.00
129 17.18 -59.60 -35.99 0.00 0.00 0.00
130 -1.99 712.30 14.10 0.00 0.00 0.00
131 -0.31 436.66 1.09 0.00 0.00 0.00
132 0.72 238.74 -11.26 0.00 0.00 0.00
133 2.43 -36.87 -23.53 0.00 0.00 0.00
151 12.13 745.57 7.19 0.00 0.00 0.00
152 16.36 39.49 -31.77 0.00 0.00 0.00
153 11.19 883.71 14.14 0.00 0.00 0.00
154 17.34 -98.50 -38.07 0.00 0.00 0.00
6 101 -15.23 624.45 -0.35 0.00 0.00 0.00
102 -12.47 198.05 -23.57 0.00 0.00 0.00
103 -90.42 871.63 11.10 0.00 0.00 0.00
104 97.37 141.06 -4.03 0.00 0.00 0.00
105 -13.33 551.46 4.19 0.00 0.00 0.00
106 11.38 460.73 2.53 0.00 0.00 0.00
107 -1.29 574.19 6.38 0.00 0.00 0.00
108 -0.80 437.98 0.35 0.00 0.00 0.00
109 -90.89 565.84 -5.23 0.00 0.00 0.00
110 102.88 -164.17 -19.51 0.00 0.00 0.00
111 -11.17 245.88 -11.78 0.00 0.00 0.00
112 14.34 155.31 -13.33 0.00 0.00 0.00
113 1.26 268.66 -9.64 0.00 0.00 0.00
114 1.76 132.51 -15.44 0.00 0.00 0.00
115 -91.23 555.18 4.86 0.00 0.00 0.00
116 99.49 -162.41 -9.37 0.00 0.00 0.00
117 -12.62 252.17 -1.83 0.00 0.00 0.00
118 12.48 163.06 -3.39 0.00 0.00 0.00
119 -0.39 275.52 0.32 0.00 0.00 0.00
120 0.10 139.70 -5.52 0.00 0.00 0.00
121 -8.96 227.29 -1.89 0.00 0.00 0.00
122 8.61 165.00 -2.97 0.00 0.00 0.00
123 -0.38 243.67 -0.38 0.00 0.00 0.00
124 -0.04 148.61 -4.47 0.00 0.00 0.00
125 1.75 459.62 -18.83 0.00 0.00 0.00
126 -15.64 460.56 -14.79 0.00 0.00 0.00
127 18.94 327.87 -17.44 0.00 0.00 0.00
128 -15.73 773.05 7.49 0.00 0.00 0.00
129 -12.10 91.98 -28.83 0.00 0.00 0.00
130 -1.52 612.00 8.66 0.00 0.00 0.00
131 -0.57 400.14 -1.89 0.00 0.00 0.00
132 1.05 306.39 -7.44 0.00 0.00 0.00
133 1.98 94.74 -17.61 0.00 0.00 0.00
151 -15.32 660.62 1.70 0.00 0.00 0.00
152 -12.38 161.91 -25.53 0.00 0.00 0.00
153 -15.67 766.77 7.31 0.00 0.00 0.00
154 -12.01 55.84 -30.76 0.00 0.00 0.00
238 101 4.24 -64.57 -243.72 0.00 0.00 0.00
102 1.63 555.49 220.54 0.00 0.00 0.00
103 -39.20 -30.61 -89.45 0.00 0.00 0.00
104 40.30 -19.39 -298.69 0.00 0.00 0.00
105 -3.48 -28.45 -182.17 0.00 0.00 0.00
106 5.46 -20.49 -205.16 0.00 0.00 0.00
107 0.84 -81.07 -232.58 0.00 0.00 0.00
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 45 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
108 1.15 32.13 -154.77 0.00 0.00 0.00
109 -37.17 437.33 263.22 0.00 0.00 0.00
110 33.84 447.11 54.17 0.00 0.00 0.00
111 -5.13 438.82 170.55 0.00 0.00 0.00
112 2.66 446.67 147.64 0.00 0.00 0.00
113 -1.38 386.17 120.33 0.00 0.00 0.00
114 -1.07 499.33 197.85 0.00 0.00 0.00
115 -38.19 113.17 93.52 0.00 0.00 0.00
116 37.51 125.64 -111.30 0.00 0.00 0.00
117 -4.16 122.00 1.98 0.00 0.00 0.00
118 4.26 130.11 -20.46 0.00 0.00 0.00
119 -0.09 69.56 -48.02 0.00 0.00 0.00
120 0.22 182.55 29.52 0.00 0.00 0.00
121 -2.85 117.08 -0.66 0.00 0.00 0.00
122 3.04 122.76 -16.34 0.00 0.00 0.00
123 -0.01 80.38 -35.64 0.00 0.00 0.00
124 0.21 159.46 18.63 0.00 0.00 0.00
125 1.58 285.58 17.59 0.00 0.00 0.00
126 -5.44 243.83 34.10 0.00 0.00 0.00
127 8.14 245.66 -3.94 0.00 0.00 0.00
128 4.69 -262.48 -368.19 0.00 0.00 0.00
129 1.34 696.81 308.86 0.00 0.00 0.00
130 1.25 -165.57 -282.15 0.00 0.00 0.00
131 0.74 116.59 -105.31 0.00 0.00 0.00
132 -1.00 301.61 70.92 0.00 0.00 0.00
133 -1.45 583.84 247.15 0.00 0.00 0.00
151 4.13 -103.12 -270.53 0.00 0.00 0.00
152 1.76 594.04 247.22 0.00 0.00 0.00
153 4.45 -244.49 -359.44 0.00 0.00 0.00
154 1.47 735.34 335.50 0.00 0.00 0.00
239 101 -2.35 86.26 -167.27 0.00 0.00 0.00
102 -4.00 520.71 143.06 0.00 0.00 0.00
103 -37.25 108.85 -234.23 0.00 0.00 0.00
104 39.88 97.38 -25.07 0.00 0.00 0.00
105 -3.45 107.41 -140.88 0.00 0.00 0.00
106 5.17 99.40 -117.90 0.00 0.00 0.00
107 0.70 36.27 -173.16 0.00 0.00 0.00
108 1.00 170.55 -85.63 0.00 0.00 0.00
109 -36.21 419.41 -11.36 0.00 0.00 0.00
110 35.00 410.46 198.60 0.00 0.00 0.00
111 -4.95 419.08 82.34 0.00 0.00 0.00
112 2.87 411.34 105.38 0.00 0.00 0.00
113 -1.22 348.14 50.22 0.00 0.00 0.00
114 -0.90 482.31 137.50 0.00 0.00 0.00
115 -37.40 149.92 -111.55 0.00 0.00 0.00
116 37.86 137.67 93.62 0.00 0.00 0.00
117 -4.36 156.52 -20.72 0.00 0.00 0.00
118 3.99 148.44 1.77 0.00 0.00 0.00
119 -0.36 85.53 -53.08 0.00 0.00 0.00
120 -0.04 219.45 34.12 0.00 0.00 0.00
121 -3.14 146.90 -16.58 0.00 0.00 0.00
122 2.72 141.24 -0.87 0.00 0.00 0.00
123 -0.33 97.21 -39.24 0.00 0.00 0.00
124 -0.11 190.93 21.79 0.00 0.00 0.00
125 1.50 363.03 0.90 0.00 0.00 0.00
126 -5.35 311.87 -18.40 0.00 0.00 0.00
127 7.98 310.02 19.68 0.00 0.00 0.00
128 -2.11 -57.81 -269.66 0.00 0.00 0.00
129 -4.16 623.41 215.83 0.00 0.00 0.00
130 1.07 0.75 -202.18 0.00 0.00 0.00
131 0.62 206.08 -56.62 0.00 0.00 0.00
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 46 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
132 -0.84 312.74 21.33 0.00 0.00 0.00
133 -1.27 517.71 166.38 0.00 0.00 0.00
151 -2.53 49.75 -192.85 0.00 0.00 0.00
152 -3.81 557.15 168.52 0.00 0.00 0.00
153 -2.36 -53.15 -265.99 0.00 0.00 0.00
154 -3.97 659.86 241.27 0.00 0.00 0.00

1065. LOAD LIST 201 TO 233 251 TO 254


1066. PRINT SUPPORT REACTION

SUPPORT REACTIONS -UNIT KN METE STRUCTURE TYPE = SPACE


-----------------

JOINT LOAD FORCE-X FORCE-Y FORCE-Z MOM-X MOM-Y MOM Z

1 201 16.05 146.55 10.37 0.00 0.00 0.00


202 15.20 144.39 12.06 0.00 0.00 0.00
203 -21.29 97.15 13.11 0.00 0.00 0.00
204 22.93 193.77 12.58 0.00 0.00 0.00
205 -3.24 135.82 12.86 0.00 0.00 0.00
206 5.11 155.11 12.80 0.00 0.00 0.00
207 0.95 145.46 12.64 0.00 0.00 0.00
208 0.93 145.47 13.03 0.00 0.00 0.00
209 -21.29 97.20 14.68 0.00 0.00 0.00
210 22.93 193.79 14.05 0.00 0.00 0.00
211 -3.23 135.85 14.39 0.00 0.00 0.00
212 5.11 155.14 14.31 0.00 0.00 0.00
213 0.95 145.50 14.16 0.00 0.00 0.00
214 0.93 145.49 14.54 0.00 0.00 0.00
215 -21.21 55.40 9.36 0.00 0.00 0.00
216 22.94 151.48 8.73 0.00 0.00 0.00
217 -3.29 89.80 8.85 0.00 0.00 0.00
218 5.04 108.99 8.78 0.00 0.00 0.00
219 0.89 99.40 8.61 0.00 0.00 0.00
220 0.87 99.40 9.02 0.00 0.00 0.00
221 -2.09 86.25 8.16 0.00 0.00 0.00
222 3.86 99.94 8.10 0.00 0.00 0.00
223 0.89 93.09 7.99 0.00 0.00 0.00
224 0.88 93.09 8.28 0.00 0.00 0.00
225 0.95 107.60 2.46 0.00 0.00 0.00
226 -5.46 93.66 2.55 0.00 0.00 0.00
227 7.33 121.54 2.36 0.00 0.00 0.00
228 16.06 146.56 10.28 0.00 0.00 0.00
229 15.20 144.39 12.15 0.00 0.00 0.00
230 0.94 145.47 12.74 0.00 0.00 0.00
231 0.94 145.46 12.92 0.00 0.00 0.00
232 0.95 145.50 14.27 0.00 0.00 0.00
233 0.94 145.49 14.43 0.00 0.00 0.00
251 16.45 147.58 10.29 0.00 0.00 0.00
252 14.79 143.36 12.14 0.00 0.00 0.00
253 16.46 147.59 10.20 0.00 0.00 0.00
254 14.79 143.36 12.23 0.00 0.00 0.00
2 201 -15.20 177.22 10.73 0.00 0.00 0.00
202 -16.05 179.39 11.63 0.00 0.00 0.00
203 -22.85 226.62 12.89 0.00 0.00 0.00
204 21.20 130.00 13.36 0.00 0.00 0.00
205 -5.10 187.96 13.09 0.00 0.00 0.00
206 3.22 168.66 13.14 0.00 0.00 0.00
207 -0.96 178.31 12.91 0.00 0.00 0.00
208 -0.93 178.31 13.31 0.00 0.00 0.00
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 47 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
209 -22.85 226.58 13.62 0.00 0.00 0.00
210 21.20 129.98 14.15 0.00 0.00 0.00
211 -5.09 187.93 13.84 0.00 0.00 0.00
212 3.22 168.63 13.91 0.00 0.00 0.00
213 -0.95 178.27 13.67 0.00 0.00 0.00
214 -0.93 178.28 14.07 0.00 0.00 0.00
215 -22.87 177.00 8.70 0.00 0.00 0.00
216 21.14 80.93 9.26 0.00 0.00 0.00
217 -5.03 133.07 8.72 0.00 0.00 0.00
218 3.28 113.87 8.79 0.00 0.00 0.00
219 -0.89 123.47 8.54 0.00 0.00 0.00
220 -0.87 123.47 8.96 0.00 0.00 0.00
221 -3.85 122.92 8.05 0.00 0.00 0.00
222 2.08 109.22 8.10 0.00 0.00 0.00
223 -0.89 116.07 7.92 0.00 0.00 0.00
224 -0.88 116.07 8.22 0.00 0.00 0.00
225 -0.95 151.53 2.61 0.00 0.00 0.00
226 -7.30 165.47 2.53 0.00 0.00 0.00
227 5.42 137.59 2.70 0.00 0.00 0.00
228 -15.20 177.21 10.45 0.00 0.00 0.00
229 -16.06 179.39 11.91 0.00 0.00 0.00
230 -0.94 178.31 12.83 0.00 0.00 0.00
231 -0.95 178.32 13.39 0.00 0.00 0.00
232 -0.94 178.28 13.60 0.00 0.00 0.00
233 -0.95 178.28 14.15 0.00 0.00 0.00
251 -14.80 176.19 10.65 0.00 0.00 0.00
252 -16.46 180.43 11.70 0.00 0.00 0.00
253 -14.80 176.18 10.38 0.00 0.00 0.00
254 -16.46 180.43 11.98 0.00 0.00 0.00
3 201 13.07 183.19 4.98 0.00 0.00 0.00
202 12.27 186.63 6.51 0.00 0.00 0.00
203 -43.47 74.23 4.44 0.00 0.00 0.00
204 42.69 291.58 4.41 0.00 0.00 0.00
205 -6.70 165.41 4.36 0.00 0.00 0.00
206 7.09 200.42 4.40 0.00 0.00 0.00
207 0.49 183.47 4.09 0.00 0.00 0.00
208 -0.07 182.36 4.67 0.00 0.00 0.00
209 -43.63 78.68 6.02 0.00 0.00 0.00
210 42.13 295.28 5.56 0.00 0.00 0.00
211 -7.04 169.54 5.76 0.00 0.00 0.00
212 6.70 204.44 5.73 0.00 0.00 0.00
213 0.13 187.55 5.45 0.00 0.00 0.00
214 -0.44 186.43 6.03 0.00 0.00 0.00
215 -43.06 22.21 3.55 0.00 0.00 0.00
216 42.75 237.56 3.30 0.00 0.00 0.00
217 -6.55 107.82 3.30 0.00 0.00 0.00
218 7.18 142.50 3.31 0.00 0.00 0.00
219 0.62 125.72 3.00 0.00 0.00 0.00
220 0.05 124.60 3.60 0.00 0.00 0.00
221 -4.52 104.53 3.04 0.00 0.00 0.00
222 5.29 129.27 3.05 0.00 0.00 0.00
223 0.60 117.30 2.83 0.00 0.00 0.00
224 0.19 116.50 3.26 0.00 0.00 0.00
225 -2.20 201.18 1.02 0.00 0.00 0.00
226 -14.75 169.62 1.05 0.00 0.00 0.00
227 10.24 232.74 0.99 0.00 0.00 0.00
228 13.60 186.56 4.93 0.00 0.00 0.00
229 11.70 183.21 6.57 0.00 0.00 0.00
230 0.74 186.28 4.32 0.00 0.00 0.00
231 -0.34 179.52 4.44 0.00 0.00 0.00
232 0.40 190.39 5.68 0.00 0.00 0.00
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 48 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
233 -0.72 183.57 5.81 0.00 0.00 0.00
251 13.27 183.49 4.91 0.00 0.00 0.00
252 12.06 186.33 6.59 0.00 0.00 0.00
253 13.80 186.85 4.85 0.00 0.00 0.00
254 11.49 182.90 6.65 0.00 0.00 0.00
4 201 -12.26 219.46 5.39 0.00 0.00 0.00
202 -13.30 216.09 6.17 0.00 0.00 0.00
203 -42.39 328.47 4.76 0.00 0.00 0.00
204 43.77 111.09 4.76 0.00 0.00 0.00
205 -6.78 237.27 4.74 0.00 0.00 0.00
206 7.01 202.26 4.69 0.00 0.00 0.00
207 0.38 219.19 4.42 0.00 0.00 0.00
208 -0.18 220.34 5.01 0.00 0.00 0.00
209 -42.84 324.02 5.28 0.00 0.00 0.00
210 43.01 107.41 5.55 0.00 0.00 0.00
211 -7.36 233.16 5.38 0.00 0.00 0.00
212 6.38 198.25 5.37 0.00 0.00 0.00
213 -0.22 215.12 5.08 0.00 0.00 0.00
214 -0.79 216.29 5.67 0.00 0.00 0.00
215 -42.92 265.86 3.33 0.00 0.00 0.00
216 42.97 50.49 3.49 0.00 0.00 0.00
217 -7.31 168.62 3.30 0.00 0.00 0.00
218 6.44 133.94 3.28 0.00 0.00 0.00
219 -0.16 150.71 2.98 0.00 0.00 0.00
220 -0.73 151.85 3.60 0.00 0.00 0.00
221 -5.40 154.71 3.05 0.00 0.00 0.00
222 4.42 129.97 3.03 0.00 0.00 0.00
223 -0.30 141.94 2.82 0.00 0.00 0.00
224 -0.70 142.75 3.26 0.00 0.00 0.00
225 -2.45 228.74 1.16 0.00 0.00 0.00
226 -14.89 260.31 1.13 0.00 0.00 0.00
227 10.09 197.18 1.19 0.00 0.00 0.00
228 -11.97 216.10 5.15 0.00 0.00 0.00
229 -13.63 219.54 6.40 0.00 0.00 0.00
230 0.38 216.39 4.49 0.00 0.00 0.00
231 -0.20 223.17 4.95 0.00 0.00 0.00
232 -0.19 212.28 5.15 0.00 0.00 0.00
233 -0.83 219.16 5.60 0.00 0.00 0.00
251 -12.05 219.15 5.33 0.00 0.00 0.00
252 -13.52 216.41 6.24 0.00 0.00 0.00
253 -11.76 215.79 5.09 0.00 0.00 0.00
254 -13.84 219.87 6.46 0.00 0.00 0.00
5 201 8.90 504.79 3.10 0.00 0.00 0.00
202 11.60 55.28 -21.25 0.00 0.00 0.00
203 -61.22 251.90 1.60 0.00 0.00 0.00
204 55.82 705.58 10.98 0.00 0.00 0.00
205 -9.62 446.99 5.64 0.00 0.00 0.00
206 7.61 510.07 6.79 0.00 0.00 0.00
207 -1.14 517.47 8.09 0.00 0.00 0.00
208 -0.79 439.58 4.34 0.00 0.00 0.00
209 -61.47 -141.87 -18.77 0.00 0.00 0.00
210 60.63 310.94 -10.13 0.00 0.00 0.00
211 -7.73 52.87 -15.04 0.00 0.00 0.00
212 10.27 115.77 -14.00 0.00 0.00 0.00
213 1.12 123.25 -12.73 0.00 0.00 0.00
214 1.49 45.40 -16.30 0.00 0.00 0.00
215 -60.98 -18.88 -7.29 0.00 0.00 0.00
216 58.56 430.59 1.58 0.00 0.00 0.00
217 -8.44 165.29 -3.37 0.00 0.00 0.00
218 9.16 227.64 -2.30 0.00 0.00 0.00
219 0.22 235.36 -1.01 0.00 0.00 0.00
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 49 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
220 0.57 157.57 -4.65 0.00 0.00 0.00
221 -5.86 162.85 -3.02 0.00 0.00 0.00
222 6.71 207.33 -2.25 0.00 0.00 0.00
223 0.31 212.87 -1.33 0.00 0.00 0.00
224 0.57 157.31 -3.93 0.00 0.00 0.00
225 1.17 283.86 -6.84 0.00 0.00 0.00
226 -16.38 217.99 -8.14 0.00 0.00 0.00
227 18.42 349.76 -5.53 0.00 0.00 0.00
228 7.99 642.66 9.82 0.00 0.00 0.00
229 12.55 -82.49 -27.52 0.00 0.00 0.00
230 -1.79 616.28 12.71 0.00 0.00 0.00
231 -0.12 340.84 -0.18 0.00 0.00 0.00
232 0.46 222.07 -8.33 0.00 0.00 0.00
233 2.17 -53.35 -20.61 0.00 0.00 0.00
251 8.80 530.69 4.56 0.00 0.00 0.00
252 11.70 29.39 -22.64 0.00 0.00 0.00
253 7.90 668.57 11.31 0.00 0.00 0.00
254 12.65 -108.36 -28.89 0.00 0.00 0.00
6 201 -11.02 446.16 -0.59 0.00 0.00 0.00
202 -8.90 140.44 -16.95 0.00 0.00 0.00
203 -57.99 648.53 7.47 0.00 0.00 0.00
204 59.70 194.99 -1.82 0.00 0.00 0.00
205 -9.52 453.19 3.32 0.00 0.00 0.00
206 7.82 390.14 2.19 0.00 0.00 0.00
207 -1.06 469.28 4.85 0.00 0.00 0.00
208 -0.71 374.04 0.66 0.00 0.00 0.00
209 -57.38 393.98 -5.95 0.00 0.00 0.00
210 63.39 -59.28 -14.80 0.00 0.00 0.00
211 -7.60 198.74 -9.91 0.00 0.00 0.00
212 10.21 135.77 -10.98 0.00 0.00 0.00
213 1.10 214.86 -8.41 0.00 0.00 0.00
214 1.45 119.65 -12.47 0.00 0.00 0.00
215 -58.13 442.82 1.83 0.00 0.00 0.00
216 61.07 -6.78 -7.10 0.00 0.00 0.00
217 -8.89 238.80 -2.07 0.00 0.00 0.00
218 8.68 176.43 -3.15 0.00 0.00 0.00
219 -0.32 255.15 -0.56 0.00 0.00 0.00
220 0.03 160.07 -4.65 0.00 0.00 0.00
221 -6.47 218.39 -2.05 0.00 0.00 0.00
222 6.08 173.90 -2.82 0.00 0.00 0.00
223 -0.34 230.09 -0.97 0.00 0.00 0.00
224 -0.09 162.19 -3.89 0.00 0.00 0.00
225 1.24 328.71 -13.42 0.00 0.00 0.00
226 -15.90 394.59 -12.11 0.00 0.00 0.00
227 18.68 262.84 -14.72 0.00 0.00 0.00
228 -11.42 552.05 4.85 0.00 0.00 0.00
229 -8.49 34.60 -22.13 0.00 0.00 0.00
230 -1.36 527.46 8.02 0.00 0.00 0.00
231 -0.40 315.82 -2.45 0.00 0.00 0.00
232 0.80 272.96 -5.34 0.00 0.00 0.00
233 1.75 61.50 -15.49 0.00 0.00 0.00
251 -11.08 470.21 0.75 0.00 0.00 0.00
252 -8.83 116.41 -18.24 0.00 0.00 0.00
253 -11.48 576.10 6.20 0.00 0.00 0.00
254 -8.42 10.56 -23.41 0.00 0.00 0.00
238 201 3.03 -46.22 -173.93 0.00 0.00 0.00
202 1.21 397.53 158.14 0.00 0.00 0.00
203 -24.01 -24.15 -96.56 0.00 0.00 0.00
204 25.33 -16.73 -226.28 0.00 0.00 0.00
205 -2.27 -23.05 -153.29 0.00 0.00 0.00
206 3.93 -17.42 -169.23 0.00 0.00 0.00
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 50 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
207 0.73 -59.83 -188.47 0.00 0.00 0.00
208 0.94 19.35 -134.06 0.00 0.00 0.00
209 -23.68 365.19 197.12 0.00 0.00 0.00
210 21.28 371.86 67.49 0.00 0.00 0.00
211 -3.80 365.95 140.40 0.00 0.00 0.00
212 1.73 371.51 124.50 0.00 0.00 0.00
213 -1.14 329.15 105.33 0.00 0.00 0.00
214 -0.92 408.31 159.57 0.00 0.00 0.00
215 -23.69 129.25 54.60 0.00 0.00 0.00
216 23.57 136.86 -73.79 0.00 0.00 0.00
217 -2.89 123.22 -1.38 0.00 0.00 0.00
218 3.01 128.89 -17.09 0.00 0.00 0.00
219 -0.04 86.51 -36.38 0.00 0.00 0.00
220 0.17 165.60 17.90 0.00 0.00 0.00
221 -2.01 117.89 -2.90 0.00 0.00 0.00
222 2.20 121.95 -14.10 0.00 0.00 0.00
223 0.02 91.68 -27.88 0.00 0.00 0.00
224 0.18 148.16 10.88 0.00 0.00 0.00
225 1.14 203.95 12.59 0.00 0.00 0.00
226 -5.69 202.94 31.43 0.00 0.00 0.00
227 7.94 204.93 -6.28 0.00 0.00 0.00
228 3.32 -187.35 -262.55 0.00 0.00 0.00
229 0.93 538.62 246.34 0.00 0.00 0.00
230 1.09 -161.25 -249.67 0.00 0.00 0.00
231 0.58 120.72 -72.99 0.00 0.00 0.00
232 -0.80 227.69 44.30 0.00 0.00 0.00
233 -1.26 509.72 220.48 0.00 0.00 0.00
251 2.94 -71.87 -191.75 0.00 0.00 0.00
252 1.30 423.18 175.90 0.00 0.00 0.00
253 3.24 -213.01 -280.40 0.00 0.00 0.00
254 1.02 564.26 264.07 0.00 0.00 0.00
239 201 -1.68 61.52 -119.37 0.00 0.00 0.00
202 -2.93 372.94 102.99 0.00 0.00 0.00
203 -23.18 89.94 -172.70 0.00 0.00 0.00
204 24.96 82.40 -42.99 0.00 0.00 0.00
205 -2.29 89.10 -115.72 0.00 0.00 0.00
206 3.73 83.45 -99.78 0.00 0.00 0.00
207 0.60 39.33 -138.35 0.00 0.00 0.00
208 0.82 133.23 -77.15 0.00 0.00 0.00
209 -23.26 348.92 13.01 0.00 0.00 0.00
210 21.83 342.68 143.13 0.00 0.00 0.00
211 -3.66 348.65 70.18 0.00 0.00 0.00
212 1.90 343.16 86.15 0.00 0.00 0.00
213 -1.00 298.99 47.64 0.00 0.00 0.00
214 -0.78 392.83 108.69 0.00 0.00 0.00
215 -23.54 163.71 -74.10 0.00 0.00 0.00
216 23.41 156.24 54.53 0.00 0.00 0.00
217 -3.11 155.31 -17.35 0.00 0.00 0.00
218 2.73 149.66 -1.60 0.00 0.00 0.00
219 -0.31 105.62 -39.99 0.00 0.00 0.00
220 -0.09 199.36 21.04 0.00 0.00 0.00
221 -2.31 146.09 -14.34 0.00 0.00 0.00
222 1.88 142.05 -3.11 0.00 0.00 0.00
223 -0.30 110.60 -30.52 0.00 0.00 0.00
224 -0.14 177.54 13.07 0.00 0.00 0.00
225 1.10 258.95 0.43 0.00 0.00 0.00
226 -5.60 259.95 -18.45 0.00 0.00 0.00
227 7.82 257.94 19.30 0.00 0.00 0.00
228 -1.49 -41.11 -192.24 0.00 0.00 0.00
229 -3.10 475.43 175.60 0.00 0.00 0.00
230 0.93 -16.26 -180.45 0.00 0.00 0.00
FOSTER WHEELER
SUBJECT : PIPE RACK AREA, WA15 - DESIGN CALCULATIONS Sheet No : 51 of 51
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
231 0.49 188.83 -35.08 0.00 0.00 0.00
232 -0.68 243.52 5.68 0.00 0.00 0.00
233 -1.10 448.31 150.63 0.00 0.00 0.00
251 -1.80 37.25 -136.36 0.00 0.00 0.00
252 -2.80 397.18 119.92 0.00 0.00 0.00
253 -1.61 -65.38 -209.24 0.00 0.00 0.00
254 -2.98 499.68 192.52 0.00 0.00 0.00

************** END OF LATEST ANALYSIS RESULT **************

1067. FINISH
FOSTER WHEELER
SUBJECT : WA15 PIPERACK- DESIGN CALCULATIONS Sheet No : H11 OF H13
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 16-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001

APPENDIX H
BASE PLATE DESIGN (BP1)
FOSTER WHEELER
SUBJECT : WA15 PIPERACK- DESIGN CALCULATIONS Sheet No : H12 OF H13
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 16-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001

BASE PLATE DESIGN (FOR WA15)


BASE PLATE -BP1
E) For WA15- For Column base of HE400A Section
GRID: 0
From Staad output, the following combination is considered as critical for Base Plate design.
Node Load comb Fx (kN) Fy (kN) Fz (kN) Mx (kNm) My (kNm) Mz (kNm)
5 104 88 941 16 0 0 0
MEMBER PROPERTIES
Column Size: HE400A yb
Base PL
Area 0.24645 in² 159 mm²
Depth d 15.35 in 390.00 mm
Flange Width bf 11.81 in 300.00 mm
Web Thickness tw 0.43 in 11.00 mm
Flange Thickness tf 0.75 in 19.00 mm
d5
Clear Web Depth d' 13.86 in 352.00 mm
9. N
0
MATERIAL PROPERTIES
Yield Stress Fy 39.89 ksi 275.0 N/mm²
Comp. Strgth f'c 5.08 ksi 35.0 N/mm²
0.80bf
PIER DIMENSIONS
Pier Dim 23.62 x 23.62 in 600 x 600 mm
B
Area of concrete support A2 = 558 in² 360000 mm²

BASE PLATE DIMENSIONS


Distance between bolts d 7.87 in 200 mm

LOADING CONDITION
Compression Pu 211.5 kip 941.00 kN
Tension T -59.6 kip -265.00 kN
Shear parallel to Flange VF 19.8 kip 88.00 kN
Shear parallel to Web VW 3.6 kip 16.00 kN

No of Anchor Bolt Rows 2.0

BASE PLATE DESIGN


Base Plate Dimensions
The allowable bearing capacity on the concrete
Pp = 0.85 x f'c xA1x √(A2/A1) < 1.7 x f'c xA1 (Specification Sec. J9 AISC-LRFD )
2
where A1 = Area of base plate , in
2
A2 = Area of pedestal , in
and √(A2/A1) < 2
The design bearing strength = φcxPp
φcxPp > Pu
φc = 0.6
2
1 Pu
A1 Req. = φxA 0.85f'c = 7.18 in² 4632 mm²
2

A1 Req. = Pu /(1.7f'c*φ) = 40.9 in² 26359 mm²


A1 Req. = bf x d = 181.4 in² 117000 mm²
Maximum of the above = 181 in² 117000 mm²
FOSTER WHEELER
SUBJECT : WA15 PIPERACK- DESIGN CALCULATIONS Sheet No : H13 OF H13
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 16-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001

Δ = 0.5 x (0.95 x d - 0.8 x bf) = 2.57 in 65.25 mm


N Req. = √A1 + Δ = 16.0 in 407.303 mm Provide ------> N = 17.7 in 450 mm
B Req. = A1 / N = 11.3 in 287.256 mm Provide ------> B = 13.8 in 350 mm
A1 Req. = 181.35 in² 1E+05 mm² A1 Provided = 244 in² 2E+05 mm²

Act. capacity = Pu = 211.5 kip 941.0 kN


Allowable Bearing capacity Pp = Minimum of (φ x 1.7 x f'c x A1, φ x 0.85 x f'c x A1 x √(A2 / A1))
φ x 1.7 x f'c x A1 = 1264.0 kip 5622.47 kN
φ x 0.85 x f'c x A1 x √(A2 / A1) = 955.528 kip 4250.19 kN

Pp = 956 kip 4250.19 kN Pp > Pu --> ok


Thickness
Base pate projection from the column face
m = (N-0.95xd)/2 = 1.56 in 39.8 mm
n = (B-0.8xbf)/2 = 2.17 in 55.0 mm
Resistance factor for bending φb = 0.90 M

Actual base pressure at edge, fc" = Pu/A


= 5.97 N/mm2
= 0.87 ksi
The design bearing pressure,fcm = φ x 0.85 x f'c x √(A2 / A1)
= 3.91 ksi Safe
= 26.98 N/mm2
a) Cantilever projection
Baseplate projection from
column face, lb = 0.5*(N-0.95*d) or 0.5*(B-0.8*bf) (Maximum)
= 39.8 mm or 55 mm
= 55.0 mm = 21.65 inch.
So Mu = fc"*(lb)2/2
= 0.203 kip in = 0.023 kNm
Thk.of base Plate Req. tp = √(4*Mu / φFy)
tp = 0.15 in 3.8211 mm
Use Plate Thickness = 1.18 in 30 mm Safe

b) Middle part
a

a = 352.00 mm
b = 169.50 mm

a*0.5/b = 1.04
β = 0.270 From Moody's chart
So Mu = β*fc"*(b)2
= 46346.0 Nmm
Allowable bending stress Fb = φ∗Fy
= 247.50 N/mm²
Thk.of base Plate Req. tp = √(4*Mu / φFy)
= 27.37 mm
Use Plate Thickness = 1.18 in 30 mm Safe
FOSTER WHEELER
SUBJECT : WA15 PIPERACK- DESIGN CALCULATIONS Sheet No : H14 OF H13
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 16-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001

Check for Tension


Dist b/n bolts L 7.9 200 mm
Tension per bolt row T -29.8 Kips -132 kN
yb' = 76.0 mm

T' T'

yb' yb'

M = T*yb'*(a-yb')/A
= 7895402.1 Nmm

0.5
Thk.of base Pl Req. tp = (6M/φ(Fy*N)
t = 0.9 in 22.59 mm

Use Plate Thickness = 1.18 in 30 mm


FOSTER WHEELER
SUBJECT : WA15 PIPERACK- DESIGN CALCULATIONS Sheet No : H11 OF H13
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 16-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001

APPENDIX H
BASE PLATE DESIGN(BP2)
FOSTER WHEELER
SUBJECT : WA15 PIPERACK- DESIGN CALCULATIONS Sheet No : H12 OF H13
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 16-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001

BASE PLATE DESIGN (FOR WA15)


BASE PLATE -BP2
E) For WA15- For Column base of HE400A Section
GRID: 0
From Staad output, the following combination is considered as critical for Base Plate design.
Node Load comb Fx (kN) Fy (kN) Fz (kN) Mx (kNm) My (kNm) Mz (kNm)
238 129 1.5 697 309 0 0 0
MEMBER PROPERTIES
Column Size: HE400A yb
Base PL
Area 0.24645 in² 159 mm²
Depth d 15.35 in 390.00 mm
Flange Width bf 11.81 in 300.00 mm
Web Thickness tw 0.43 in 11.00 mm
Flange Thickness tf 0.75 in 19.00 mm
d5
Clear Web Depth d' 13.86 in 352.00 mm
9. N
0
MATERIAL PROPERTIES
Yield Stress Fy 39.89 ksi 275.0 N/mm²
Comp. Strgth f'c 5.08 ksi 35.0 N/mm²
0.80bf
PIER DIMENSIONS
Pier Dim 23.62 x 23.62 in 600 x 600 mm
B
Area of concrete support A2 = 558 in² 360000 mm²

BASE PLATE DIMENSIONS


Distance between bolts d 7.87 in 200 mm

LOADING CONDITION
Compression Pu 156.7 kip 697.00 kN
Tension T -58.9 kip -262.00 kN
Shear parallel to Flange VF 0.3 kip 1.50 kN
Shear parallel to Web VW 69.5 kip 309.00 kN

No of Anchor Bolt Rows 2.0

BASE PLATE DESIGN


Base Plate Dimensions
The allowable bearing capacity on the concrete
Pp = 0.85 x f'c xA1x √(A2/A1) < 1.7 x f'c xA1 (Specification Sec. J9 AISC-LRFD )
2
where A1 = Area of base plate , in
2
A2 = Area of pedestal , in
and √(A2/A1) < 2
The design bearing strength = φcxPp
φcxPp > Pu
φc = 0.6
2
1 Pu
A1 Req. = φxA 0.85f'c = 3.94 in² 2541 mm²
2

A1 Req. = Pu /(1.7f'c*φ) = 30.3 in² 19524 mm²


A1 Req. = bf x d = 181.4 in² 117000 mm²
Maximum of the above = 181 in² 117000 mm²
FOSTER WHEELER
SUBJECT : WA15 PIPERACK- DESIGN CALCULATIONS Sheet No : H13 OF H13
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 16-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001

Δ = 0.5 x (0.95 x d - 0.8 x bf) = 2.57 in 65.25 mm


N Req. = √A1 + Δ = 16.0 in 407.303 mm Provide ------> N = 17.7 in 450 mm
B Req. = A1 / N = 11.3 in 287.256 mm Provide ------> B = 13.8 in 350 mm
A1 Req. = 181.35 in² 1E+05 mm² A1 Provided = 244 in² 2E+05 mm²

Act. capacity = Pu = 156.7 kip 697.0 kN


Allowable Bearing capacity Pp = Minimum of (φ x 1.7 x f'c x A1, φ x 0.85 x f'c x A1 x √(A2 / A1))
φ x 1.7 x f'c x A1 = 1264.0 kip 5622.47 kN
φ x 0.85 x f'c x A1 x √(A2 / A1) = 955.528 kip 4250.19 kN

Pp = 956 kip 4250.19 kN Pp > Pu --> ok


Thickness
Base pate projection from the column face
m = (N-0.95xd)/2 = 1.56 in 39.8 mm
n = (B-0.8xbf)/2 = 2.17 in 55.0 mm
Resistance factor for bending φb = 0.90 M

Actual base pressure at edge, fc" = Pu/A


= 4.43 N/mm2
= 0.64 ksi
The design bearing pressure,fcm = φ x 0.85 x f'c x √(A2 / A1)
= 3.91 ksi Safe
= 26.98 N/mm2
a) Cantilever projection
Baseplate projection from
column face, lb = 0.5*(N-0.95*d) or 0.5*(B-0.8*bf) (Maximum)
= 39.8 mm or 55 mm
= 55.0 mm = 21.65 inch.
So Mu = fc"*(lb)2/2
= 0.150 kip in = 0.017 kNm
Thk.of base Plate Req. tp = √(4*Mu / φFy)
tp = 0.13 in 3.28859 mm
Use Plate Thickness = 1.18 in 30 mm Safe

b) Middle part
a

a = 352.00 mm
b = 169.50 mm

a*0.5/b = 1.04
β = 0.267 From Moody's chart
So Mu = β*fc"*(b)2
= 33947.1 Nmm
Allowable bending stress Fb = φ∗Fy
= 247.50 N/mm²
Thk.of base Plate Req. tp = √(4*Mu / φFy)
= 23.42 mm
Use Plate Thickness = 1.18 in 30 mm Safe
FOSTER WHEELER
SUBJECT : WA15 PIPERACK- DESIGN CALCULATIONS Sheet No : H14 OF H13
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 16-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001

Check for Tension


Dist b/n bolts L 7.9 200 mm
Tension per bolt row T -29.4 Kips -131 kN
yb' = 76.0 mm

T' T'

yb' yb'

M = T*yb'*(a-yb')/A
= 7806020.2 Nmm

0.5
Thk.of base Pl Req. tp = (6M/φ(Fy*N)
t = 0.9 in 22.46 mm

Use Plate Thickness = 1.18 in 30 mm


FOSTER WHEELER
SUBJECT : ANCHOR BOLT DESIGN-WA15 Sheet No : 1 of 3
PROJECT: PETRORabigh UOU Rev Date Originator Checker Approver

CONTRACT NO : 1-14-2410/59 O1 24-Nov-06 TPR Ashokan

SAFETY CALC. YES


CALC. NO 2411-8320-CA-WA15-0001

APPENDIX J
ANCHOR BOLT DESIGN FOR BP1
Company Foster Wheeler
Project PETRORabigh UOU Project # 1-14-2410/59
Subject PIPERACK WA15
Name TPR Date 11/24/2006 Sheet Number 2 of 3
Checked by Ashokan Check Date Total Sheets 3

LOADING CONDITIONS DESIGN CONSIDERATIONS


Note: Calculations are per ACI 318-02 Appendix D. Ductility required? Tension No Shear No

Nu and Vu were factored using factors from ACI 318-02? Appendix C Intermediate or high seismic risk? No

Factored tensile load (kips) = N u = 59.18 Specified concrete strength (psi) = f' c = 5000
Factored shear load (kips) = V u = perpendicular to edge 23.40 Cracking
Is there a built-up grout pad? Yes modification 1.4 - Located in region where there isn't cracking at service loads (ft < fr)
factor,Ψ 7
ANCHOR DATA, EMBEDMENT, AND THICKNESS OF MEMBER
Anchor material type = A36, Fu = 58 Adequate supplementary reinf. provided to resist tension loads in anchors? Yes

Nominal anchor diameter (in.) = 1 Adequate reinforcement provided to resist shear loads in anchors? Yes
Effective anchor embedment depth (in.) = hef 3.94 = hef ECCENTRICITY
Thickness of member in which anchor is anchored, (in.) = h 74.80 = h Eccentricity of tensile force on group of tensile anchors (in.)
Number of anchors in tension = n (tension) = 4 eN' = 4.9213 (0=single anchor)
Number of anchors in shear = n (shear) = 4 Eccentricity of shear force on group of anchors (in.)
CONCRETE FAILURE AREAS (Note ev' must be less than s perpendicular to shear) eV'= 4.9213
Do you want to manually input the value of A n? No
no EDGE DISTANCES AND SPACING
An = 418.4283 TENSION SHEAR
Note: Units for A n and Av are sq. in.
An= 388.012276 Edge Distance, in. Spacing, in. Edge Distance, in. Spacing, in.
Do you want to manually input the value of A v? No
no c1 = 7.9 c3 = 7.9 s1 = 7.9 c1 = 7.9 s2 = 7.9
c1 Av = 515.361 c2 = 7.9 c4 = 7.9 s2 = 7.9 c2 = 7.9
NU Av= 280.845 c4 = 7.9
1.5hef 1.5hef 35 o c1 = minimum edge distance c1 = edge distance in direction of V n (perp.)
1.5c1

c2 = least edge distance perpendicular to c 1 c2 = least edge distance perpendicular to c 1


VU (perpendicular)
c1 s1 c 3 c1

h or 1.5c1
VU
hef

c2 s2 c4
1.5c1

VU (parallel)
c2 s2 c4

35o VU c1
c4 s2 c2
Breakout cone for tension Breakout cone for shear
SUMMARY OF RESULTS
DUCTILITY INTERACTION OF TENSILE AND SHEAR FORCES RESULTS
φNn = 112.5 kips < Nu = 59.18 Using supplemental reinf to carry Tension
φVn = 50.6 kips < Vu = 23.40 Using supplemental reinf to carry Shear
Nu/(φNn) + Vu/(φVn) = 0.53 + 0.46 = 0.99 <=1.2 ANCHOR OK !
Applied Tension > than Steel Capacity of Anchor, NG 0.99
Applied Shear > than Steel Capacity of Anchor, NG
Company Foster Wheeler Sheet 3 of 3
Project PETRORabigh UOU Project 1-14-2410/59
Subject PIPERACK WA15
Name TPR Date 11/24/2006
Checked by Ashokan Check Date

BOLT PARAMETERS
Grade A36, Fu = 58 fy 36 ksi hef 3.94 in.
Size 1 in. fut 58 ksi n(tension) 4
do 1.000 in. Ase 0.606 sq. in. n(shear) 4
Ab 1.501 sq. in.

LOAD CONDITIONS REINFORCEMENT


LOAD FACTORS Appendix C ADEQUATE SUPPL REINF PROVIDED TO RESIST TENSION
TENSILE LOAD, Nu 59.18 ADEQUATE REINF PROVIDED TO RESIST SHEAR
SHEAR LOAD, Vu 23.40

DESIGN CONSIDERATIONS
DUCTILITY NOT REQD IN TENSION CONCRETE STRENGTH, f'c 5000 psi
DUCTILITY NOT REQD FOR SHEAR CRACKING MOD FACTOR, Ψ7 1.4
LOW SEISMIC RISK GROUT PAD
ECCENTRICITIES eN' = 4.92 in. eV' = 4.92 in.

DESIGN FOR TENSION DESIGN FOR SHEAR


STEEL STRENGTH Ns 140.6 kips STEEL STRENGTH Vs 67.5 kips

CONCRETE BREAKOUT CONCRETE BREAKOUT


STRENGTH OF STRENGTH OF ANCHOR,
ANCHOR(S) Perpendicular to edge
Ncb or Ncbg 25.1 kips Vcb or Vcbg 12.9 kips

PULLOUT STRENGTH CONCRETE PRYOUT


OF ANCHOR(S) nNpn 336.3 kips STRENGTH OF ANCHOR Vcp 92.2 kips
CONCRETE SIDE-FACE
BLOWOUT STRENGTH
OF HEADED Nsb or Nsbg
ANCHOR(S) (governing) NA

EDGE DISTANCES, SPACINGS, SUMMARY OF RESULTS


FAILURE AREAS TENSION
Steel Capacity 112.5 kips
TENSION SHEAR Concrete Capacity 21.4 kips
c1 7.90 in. 7.90 in.
c2 7.90 in. 7.90 in. SHEAR
c3 7.90 in. Steel Capacity 50.6 kips
c4 7.90 in. 7.90 in. Concrete Capacity 10.9 kips
s1 7.87 in.
s2 7.90 in. 7.90 in. INTERACTION OF TENSILE AND SHEAR FORCES
An or Av 388.0 sq. in. 280.8 sq. in. 112.5 kips = φNn* < Nu = 59.18
Calculated Calculated 50.6 kips = φVn* < Vu = 23.40
Nu/(φNn*) + Vu/(φVn*) = 0.53 + 0.46 <= 1.2
OK
*Multiplied by 0.75 if intermediate or high seismic area

Page
FOSTER WHEELER
SUBJECT : ANCHOR BOLT DESIGN-WA15 Sheet No : 1 of 3
PROJECT: PETRORabigh UOU Rev Date Originator Checker Approver

CONTRACT NO : 1-14-2410/59 O1 24-Nov-06 TPR Ashokan

SAFETY CALC. YES


CALC. NO 2411-8320-CA-WA15-0001

APPENDIX J
ANCHOR BOLT DESIGN FOR BP2
Company Foster Wheeler
Project PETRORabigh UOU Project # 1-14-2410/59
Subject PIPERACK WA15
Name TPR Date 11/24/2006 Sheet Number 2 of 3
Checked by Ashokan Check Date Total Sheets 3

LOADING CONDITIONS DESIGN CONSIDERATIONS


Note: Calculations are per ACI 318-02 Appendix D. Ductility required? Tension No Shear No

Nu and Vu were factored using factors from ACI 318-02? Appendix C Intermediate or high seismic risk? No

Factored tensile load (kips) = N u = 59.18 Specified concrete strength (psi) = f' c = 5000
Factored shear load (kips) = V u = perpendicular to edge 0.00 Cracking
Is there a built-up grout pad? Yes modification 1.4 - Located in region where there isn't cracking at service loads (ft < fr)
factor,Ψ 7
ANCHOR DATA, EMBEDMENT, AND THICKNESS OF MEMBER
Anchor material type = A36, Fu = 58 Adequate supplementary reinf. provided to resist tension loads in anchors? Yes

Nominal anchor diameter (in.) = 1 Adequate reinforcement provided to resist shear loads in anchors? Yes
Effective anchor embedment depth (in.) = hef 3.94 = hef ECCENTRICITY
Thickness of member in which anchor is anchored, (in.) = h 71.85 = h Eccentricity of tensile force on group of tensile anchors (in.)
Number of anchors in tension = n (tension) = 4 eN' = 4.9213 (0=single anchor)
Number of anchors in shear = n (shear) = 0 Eccentricity of shear force on group of anchors (in.)
CONCRETE FAILURE AREAS (Note ev' must be less than s perpendicular to shear) eV'= 4.9213
Do you want to manually input the value of A n? No
no EDGE DISTANCES AND SPACING
An = 418.4283 TENSION SHEAR
Note: Units for A n and Av are sq. in.
An= 388.012276 Edge Distance, in. Spacing, in. Edge Distance, in. Spacing, in.
Do you want to manually input the value of A v? No
no c1 = 7.9 c3 = 7.9 s1 = 7.9 c1 = 7.9 s2 = 7.9
c1 Av = 515.361 c2 = 7.9 c4 = 7.9 s2 = 7.9 c2 = 7.9
NU Av= 0 c4 = 7.9
1.5hef 1.5hef 35 o c1 = minimum edge distance c1 = edge distance in direction of V n (perp.)
1.5c1

c2 = least edge distance perpendicular to c 1 c2 = least edge distance perpendicular to c 1


VU (perpendicular)
c1 s1 c 3 c1

h or 1.5c1
VU
hef

c2 s2 c4
1.5c1

VU (parallel)
c2 s2 c4

35o VU c1
c4 s2 c2
Breakout cone for tension Breakout cone for shear
SUMMARY OF RESULTS
DUCTILITY INTERACTION OF TENSILE AND SHEAR FORCES RESULTS
φNn = 112.5 kips < Nu = 59.18 Using supplemental reinf to carry Tension
φVn = 0.0 kips < Vu = 0.00 Using supplemental reinf to carry Shear
Nu/(φNn) + Vu/(φVn) = 0.53 + 0.00 = 0.53 <=1.2 ANCHOR OK !
Applied Tension > than Steel Capacity of Anchor, NG 0.53
Applied Shear > than Steel Capacity of Anchor, NG
Company Foster Wheeler Sheet 3 of 3
Project PETRORabigh UOU Project 1-14-2410/59
Subject PIPERACK WA15
Name TPR Date 11/24/2006
Checked by Ashokan Check Date

BOLT PARAMETERS
Grade A36, Fu = 58 fy 36 ksi hef 3.94 in.
Size 1 in. fut 58 ksi n(tension) 4
do 1.000 in. Ase 0.606 sq. in. n(shear) 0
Ab 1.501 sq. in.

LOAD CONDITIONS REINFORCEMENT


LOAD FACTORS Appendix C ADEQUATE SUPPL REINF PROVIDED TO RESIST TENSION
TENSILE LOAD, Nu 59.18 ADEQUATE REINF PROVIDED TO RESIST SHEAR
SHEAR LOAD, Vu 0.00

DESIGN CONSIDERATIONS
DUCTILITY NOT REQD IN TENSION CONCRETE STRENGTH, f'c 5000 psi
DUCTILITY NOT REQD FOR SHEAR CRACKING MOD FACTOR, Ψ7 1.4
LOW SEISMIC RISK GROUT PAD
ECCENTRICITIES eN' = 4.92 in. eV' = 4.92 in.

DESIGN FOR TENSION DESIGN FOR SHEAR


STEEL STRENGTH Ns 140.6 kips STEEL STRENGTH Vs 0.0 kips

CONCRETE BREAKOUT CONCRETE BREAKOUT


STRENGTH OF STRENGTH OF ANCHOR,
ANCHOR(S) Perpendicular to edge
Ncb or Ncbg 25.1 kips Vcb or Vcbg 0.0 kips

PULLOUT STRENGTH CONCRETE PRYOUT


OF ANCHOR(S) nNpn 336.3 kips STRENGTH OF ANCHOR Vcp 92.2 kips
CONCRETE SIDE-FACE
BLOWOUT STRENGTH
OF HEADED Nsb or Nsbg
ANCHOR(S) (governing) NA

EDGE DISTANCES, SPACINGS, SUMMARY OF RESULTS


FAILURE AREAS TENSION
Steel Capacity 112.5 kips
TENSION SHEAR Concrete Capacity 21.4 kips
c1 7.90 in. 7.90 in.
c2 7.90 in. 7.90 in. SHEAR
c3 7.90 in. Steel Capacity 0.0 kips
c4 7.90 in. 7.90 in. Concrete Capacity 0.0 kips
s1 7.87 in.
s2 7.90 in. 7.90 in. INTERACTION OF TENSILE AND SHEAR FORCES
An or Av 388.0 sq. in. 280.8 sq. in. 112.5 kips = φNn* < Nu = 59.18
Calculated Calculated 0.0 kips = φVn* < Vu = 0.00
Nu/(φNn*) + Vu/(φVn*) = 0.53 + 0.00 <= 1.2
OK
*Multiplied by 0.75 if intermediate or high seismic area

Page
FOSTER WHEELER
SUBJECT : SHEAR KEY DESIGN-WA15 Sheet No :
PROJECT: PETRORabigh UOU Rev Date Originator Checker Approver

CONTRACT NO : 1-14-2410/59 O1 24-Nov-06 TPR Ashokan

SAFETY CALC. YES


CALC. NO 2411-8320-CA-WA15-0001

APPENDIX K
SHEAR KEY DESIGN FOR BP2
FOSTER WHEELER
SUBJECT : FOOTING DESIGN FOR WA15-F1 Sheet No : 1 OF 5
PROJECT: PETRORabigh UOU Rev Date Originator Checker Approver
CONTRACT NO : 1 - 14 - 2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001

APPENDIX G
FOUNDATION DESIGN - TYPE F1 & CF1

PIPERACK-WA15
FOSTER WHEELER
SUBJECT : FOOTING DESIGN FOR WA15-F1 Sheet No : 2 OF 5
PROJECT: PETRORabigh UOU Rev Date Originator Checker Approver
CONTRACT NO : 1 - 14 - 2410/59 O1 17-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001

Fy x1
A C X
I) NOTES Mx Mz
1) Sign convention of forces as per Right Hand Thumb Rule. Fx
2) Cells with italic font and/or marked with are inputs. 0.9 z1
3) In check for sliding, passive pressure along sides of the Footing is NOT considered.
4) Overturning check is valid only for footings with pedestal is located at CG of footing in both directions. 0.60 1.2
5) Forces are reactions of STAAD output. Program internally calculates support loads. Fz
1.50 0.60
II) FOOTING DATA
STAAD support No's: 1234
2 0.6
Net safe bearing capacity 150 kN/m B D
2
Surcharge pressure 0 kN/m Z
Factor of safety for sliding 1.5 3.75
Factor of safety for overturning 1.5 X Dir Z Dir Depth Weight
Minimum allowable % of contact area 70 % (m) (m) (m) (kN)
Final net safe bearing capacity 150 kN/m2 Col. size 0.60 0.60 1.83 16
Height of the pedestal above G.L 0.925 m Footing size 3.75 1.20 0.6 68
Bottom of footing below G.L 1.50 m soil 3.75 1.20 0.9 67 < = [1.2*3.75-0.6*0.6]*0.9*18
Density of soil above the footing γs 18 kN/m3
Density of footing concrete 25 kN/m3 151.0 kN

Friction coefficient μ 0.4


Coordinates of the column x1 = 1.88 m Height of steel support 0.000 m
from point "A" z1 = 0.60 m
III) CHECK FOR BEARING PRESSURE FOR UNFACTORED LOADS
Sl. No Critical case Bearing Resultant Total Horiz Check Total Total
Load factor FOS for
(LC,node) capacity for Dead
Fx Fy Fz Mx My Mz Horiz. Fy Resistant For Mx Mz
Slide
Inc. Factor Load (kN) (kN) (kN) (kN-m) (kN-m) (kN-m) Load(kN) (kN) (kN) Slide (kN-m) (kN-m)
1 Critical sliding (215,3) 1.0 1.0 43.1 22.2 -3.6 0.0 0.0 0.0 43 173 69 1.60 Okay 8.6 104.4
2 Critical Overturning (209,1) 1.0 1.0 21.3 97.2 -14.7 0.0 0.0 0.0 26 248 99 3.84 Okay 35.6 51.6
3 Critical Overturning (215,3) 1.0 1.0 43.1 22.2 -3.6 0.0 0.0 0.0 43 173 69 1.60 Okay 8.6 104.4
4 Max. Pressure(209,4) 1.0 1.0 42.8 324.0 -5.3 0.0 0.0 0.0 43 475 190 4.40 Okay 12.8 103.9
FOSTER WHEELER
SUBJECT : FOOTING DESIGN FOR WA15-F1 Sheet No : 3 OF 5
PROJECT: PETRORabigh UOU Rev Date Originator Checker Approver
CONTRACT NO : 1 - 14 - 2410/59 O1 17-Nov-06 TPR Ashokan 0
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
Total Pressure (kN/m 2)
2
Loss of % of Loss of Max.Pr.(kN/m ) [For Gross safe Check for Check for
Sl. No % of cases ex/lx+ez/lz >1/6,
Overturning
Contact contact area bearing capacity Bearing Loss of
PA PB PC PD Contact Roark's Tables are
2 pressure contact Restoring Moment FOS
area (m2) used] (kN/m )
Area
Area X Dir Z Dir X Dir Z Dir Check
1 66 85 -8 11 0.10 2.2 97.8 85.8 177 Okay Okay 325 104 3.1 12.1 Okay
2 34 113 -3 76 0.04 0.9 99.1 113.4 177 Okay Okay 465 149 9.0 4.2 Okay
3 66 85 -8 11 0.10 2.2 97.8 85.8 177 Okay Okay 325 104 3.1 12.1 Okay

IV) DESIGN OF FOOTING FOR FACTORED LOADS


Sl. No Load case Load factor
Total Total Total Total
(node) for Dead Fx Fy Fz Mx My Mz Fy Mx My Mz
Load (kN) (kN) (kN) (kN-m) (kN-m) (kN-m) (kN) (kN-m) (kN-m) (kN-m)
1 109(4) 1.2 67.8 433.1 -6.3 0.0 0.0 0.0 614 15 0.0 164
0 0 0.0 0

Sl. No Total Pressure (kN/m2) Design Pressure(kN/m 2) Design Pr. at Face of Pedestal side (kN/m 2)

Pa Pb Pc Pd Pa Pb Pc Pd AB CD AC BD

1 178 212 61 95 141 174 24 58 108 90 91 108


FOSTER WHEELER
SUBJECT : FOOTING DESIGN FOR WA15-F1 Sheet No : 4 OF 5
PROJECT: PETRORabigh UOU Rev Date Originator Checker Approver
CONTRACT NO : 1 - 14 - 2410/59 O1 17-Nov-06 TPR Ashokan 0
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001

Clear cover for bottom reinf.- X Dir 75mm Eff. depth for bot. reinf. -X Dir (d) = 0.515 m
Clear cover for bottom reinf. - Z Dir 95mm Eff. depth for bot reinf. -Z Dir = 0.495 m
Clear cover to top reinf.- X Dir 75mm Eff. depth for top reinf. -X Dir = 0.517 m
Clear cover to top reinf.- Z Dir 85mm Eff. depth for top reinf. - Z Dir = 0.507 m
2
f1c-Specified compressive strength of concrete 34.4 N/mm = 4989.3 PSI
2
fy-Specified yield strength of steel 412.6 N/mm = 59842.8 PSI
Min. ratio of reinforcement for footings 0.0018 As per Cl. No:10.5.4 & 7.12.2.1 of ACI-318
Hence Ast min =0.0018*600*1000 = 1080.0 mm2/m
2
Bottom X Dir reinf. diameter(Prov) 20 mm @ 150 mm c/c @ bot => 2094 mm /m > 1080 Hence okay
2
Bottom Z Dir reinf. diameter(Prov) 20 mm @ 150 mm c/c @ bot => 2094 mm /m > 1080 Hence okay
2
Top X Dir reinf. diameter (Prov) 16 mm @ 150 mm c/c @ Top => 1340 mm /m > 1080 Hence okay
2
Top Z Dir reinf. diameter (Prov) 16 mm @ 150 mm c/c @ Top => 1340 mm /m > 1080 Hence okay
IV-A- FLEXURE CHECK
Sl. No Bending moment at face of pedestal(kN-m) Ultimate moments (kN-m) Reqd. reinf. in X dir(mm2) Reqd. reinf. In Z dir(mm 2) Reinforcement check
AB CD AC BD AB CD AC BD Bottom Top Bottom Top X dir Bot Top Z dir Bot. Top
1 175 71 4 5 175 71 4 5 1233 0 28 0 Okay Okay Okay Okay

REINFORCEMENT ARRANGEMENT (Bottom)

20 Dia @ 150 C/C


20Dia @150 C/C
FOSTER WHEELER
SUBJECT : FOOTING DESIGN FOR WA15-F1 Sheet No : 5 OF 5
PROJECT: PETRORabigh UOU Rev Date Originator Checker Approver
CONTRACT NO : 1 - 14 - 2410/59 O1 17-Nov-06 TPR Ashokan 0
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
IV-B- ONE WAY SHEAR CHECK
One way shear check at "d" from Face of Pedestal
Allowable shear stress = φ 2 f1c0.5 As per Cl No: 11.1.1 and Cl. No: 11.3.1 of ACI-318-2002
= 0.75* 2 * 4989^0.5 * 0.00689 = 0.731 N/mm2
2
Sl.No Pressure at "d" distance from face of pedestal (kN/m ) Shear force ( kN) Shear stress( N/mm 2) Shear check
AB CD AC BD AB CD AC BD AB CD AC BD X Dir Z Dir
1 124.48 73.65 section osection outs 149 61 No shea No shear 0.29 0.12 0.00 0.00 Okay Okay

IV-C-TWO WAY SHEAR CHECK


Punching shear check at 0.5 d from face of pedestal PUNCHING SHEAR PATTERN
Permissible shear stress is minimum of following As per Cl:11.12.2.1 of ACI-318-2002
1) 0.75* 4* f 1c0.5 = 1.461 N/sq.mm Xc
2) 0.75*[2+ 4/βc] *f1c0.5 = 2.192 N/sq.mm Xa
Hence Permissible shear stress = 1.461 N/sq.mm
Punching Perimeter = 4.46 m
Area of Fdn. under punching = 1.24 m
2
< = (Xc - Xa) * ( Zb- Za) a c
Co-ordinates of punching rectangular corner Xa = 1.3175 M Xc = 2.4325 M Za
Za = 0.0425 M Zb = 1.1575 M
Punching load = Col. load (i.e Fy+Load Fac* Ped. Wt) - Avg. press. of points a,b,c & d * Area of fdn. under punching Zb b d
Punching shear stress = Punching Load / [ Punching perimeter * Effective depth of footing ]
Sl. NO Pressure at punching corners (kN/sq.m) Punching Punching shear Shear
Shear (kN) stress (N/mm2)
a b c d check
1 101 132 66 97 330 0.14 Okay
FOSTER WHEELER
SUBJECT : FOOTING DESIGN FOR PIPERACK WA15 : CF1 Sheet No : 1 of 7
PROJECT: PETRORabigh UOU Rev Date Originator Checker Approver

CONTRACT NO : 1-14-2410/59 O1 16-Nov-06 TPR Ashokan


SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001

COMBINED FOOTING FOR COLUMNS AT BRACED BAY LOCATIONS


I) NOTES
1) Sign convention of forces as per Right Hand Thumb Rule.
2) Cells with italic font and/or marked with are inputs. Fy
3) In check for sliding, passive pressure along sides of the Footing is NOT considered.
Mx Mz
4) Forces are reactions of STAAD output. Program internally calculates support loads.
5) On a conservative side, the overturning checks are made. Fx
II) FOOTING DATA Left/Top Right/Bot.
STAAD Support Joint Numbers 238 239 56 Fz
Density of soil 18 kN/m3
Density of concrete 25 kN/m3 H1
Friction coefficient between soil & foundation 0.40 H3
Factor of safety for sliding 1.5
Factor of safety for overturning 1.5 d
Height of pedestal(H1) 3.35 m
Height of soil above footing (H3) 0.90 m L3
Length of pedestal (lx) 0.60 m Elevation Along X-Dir.
Width of pedestal (lz) 0.60 m
Depth of footing (d) 0.60 m x0 x1
Co-ordinates from Left/Top Pedestal CG.
Left-Top of Footing x0 -0.50 m
X
z0 -1.00 m z0

Elevation Along Z-Dir.


Right-Bot. of Footing x1 7.50 m z1 lz
z1 1.00 m Z
2nd Pedestal x2 7.00 m lx
z2 0.00 m
Length of footing (Lx) 8 m
Length of footing (Lz) 2.0 m
Height of steel column 0 m
Wt. of footing 240.00 kN
Wt. of soil over footing 247.54 kN
Net allowable bearing pressure 220 kN/m2
STAAD X AXIS
Longitudinal axis of footing parallel to 1
STAAD Z AXIS

FOSTER WHEELER
SUBJECT : FOOTING DESIGN FOR PIPERACK WA15 : CF1 Sheet No : 2 of 7
PROJECT: PETRORabigh UOU Rev Date Originator Checker Approver

CONTRACT NO : 1-14-2410/59 O1 16-Nov-06 TPR Ashokan


SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001

III) CHECK FOR BEARING PRESSURE & SLIDING

At Left Pedestal At Right Pedestal


Bearing capacity Dead Load
Load Case/Node nos. inc. factor Factor Fx1 Fy1 Fz1 Mx1 Mz1 Fx2 Fy2 Fz2 Mx2 Mz2
Sl. No.
1 209 / 238-5 1.00 1.00 -197.1 365.2 23.7 0.0 0.0 18.8 -141.9 61.5 0.0 0.0
2 228 / 238-5 1.00 1.00 262.6 -187.3 -3.3 0.0 0.0 -9.8 642.7 -8.0 0.0 0.0
3 215 / 238-5 1.00 1.00 -54.6 129.2 23.7 0.0 0.0 7.3 -18.9 61.0 0.0 0.0
4 204 / 238-5 1.00 1.00 226.3 -16.7 -25.3 0.0 0.0 -11.0 705.6 -55.8 0.0 0.0
5 1.00 0.90 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6 1.00 0.90 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7 1.00 1.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8 1.00 1.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9 1.00 1.00 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10 1.00 1.00 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Sl. No. Tot. Mz1 Tot. Fy2 Tot. Mx2 Tot. Mz2 Resultant Total vertical Hor. Resist. Check for CG of Loads from Ped-1 Eccentricity in
Tot. Fy1 (kN) Tot. Mx1 (kN) (kN) (kN) FOS
(kN) (kN) (kN) (kN) Horiz. (kN) Slide X Dir (m) Z Dir (m) X Dir (m) Z Dir (m)
1 395.3 -93.5 -778.6 -111.7 -242.8 74.1 197.6 771.2 308.5 1.56 Okay -2.76 0.00 -6.26 0.00
2 -157.2 13.1 1037.1 672.8 31.6 -38.8 253.0 1003.2 401.3 1.59 Okay 9.13 0.00 5.63 0.00
3 159.4 -93.6 -215.7 11.3 -240.9 28.8 97.0 658.2 263.3 2.71 Okay 0 0.00 -3 0.00
4 13.4 100.1 893.8 735.7 220.5 -43.4 230.1 1236.7 494.7 2.15 Okay 7 0.00 3 0.00
5 27.1 0.0 0.0 27.1 0.0 0.0 0.0 493.1 197.2 No Slide Okay 3.50 0.00 0.00 0.00
6 27.1 0.0 0.0 27.1 0.0 0.0 0.0 493.1 197.2 No Slide Okay 3.50 0.00 0.00 0.00
7 30.2 0.0 0.0 30.2 0.0 0.0 0.0 547.8 219.1 No Slide Okay 4 0.00 0 0.00
8 30.2 0.0 0.0 30.2 0.0 0.0 0.0 547.8 219.1 No Slide Okay 4 0.00 0 0.00
9 30.2 0.0 0.0 30.2 0.0 0.0 0.0 547.8 219.1 No Slide Okay 3.50 0.00 0.00 0.00
10 30.2 0.0 0.0 30.2 0.0 0.0 0.0 547.8 219.1 No Slide Okay 3.50 0.00 0.00 0.00
FOSTER WHEELER
SUBJECT : FOOTING DESIGN FOR PIPERACK WA15 : CF1 Sheet No : 3 of 7
PROJECT: PETRORabigh UOU Rev Date Originator Checker Approver

CONTRACT NO : 1-14-2410/59 O1 16-Nov-06 TPR Ashokan


SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001

Total-Mz Total- ex/Lx + Pressure at corners(in kN/m 2) Roark's Total gross Net All. Bearing Check

Sl. No. coefficient pr. (kN/m 2) pr.(kN/m2) pr. (kN bearing


Add. Moment in (kN-m) (kN-m) Mx (kN- ex (m) ez (m) ez/Lz Bottom Top Bottom
Top Left pr.
(Mz) (Mx) m) Left Right Right
1 1775 0.0 1070 -336 1.39 0.44 0.392 161.4 35.3 61.1 -65.0 4.04 194.9 167.9 220 Okay
2 -2905 0.0 -1907 45 1.90 0.04 0.260 -35.1 -18.3 143.7 160.5 2.73 171.1 144.1 220 Okay
3 518 0.0 332 -334 0.50 0.51 0.317 119.4 -6.0 88.3 -37.1 3.28 134.9 107.9 220 Okay
4 -2528 0.0 -1678 321 1.36 0.26 0.299 -61.5 58.8 95.8 216.0 2.98 230.4 203.4 220 Okay
5 0 0.0 0 0 0.00 0.00 0.000 30.8 30.8 30.8 30.8 1.00 30.8 3.8 220 Okay
6 0 0.0 0 0 0.00 0.00 0.000 30.8 30.8 30.8 30.8 1.00 30.8 3.8 220 Okay
7 0 0.0 0 0 0.00 0.00 0.000 34.2 34.2 34.2 34.2 1.00 34.2 7.2 220 Okay
8 0 0.0 0 0 0.00 0.00 0.000 34.2 34.2 34.2 34.2 1.00 34.2 7.2 220 Okay
9 0 0.0 0 0 0.00 0.00 0.000 34.2 34.2 34.2 34.2 1.00 34.2 7.2 220 Okay
10 0 0.0 0 0 0.00 0.00 0.000 34.2 34.2 34.2 34.2 1.00 34.2 7.2 220 Okay

Sl. No. Overturning Moment (kN-m) FOS


Restoring moment (kN-m) Check Overturning moment (kRestoring moment (kN- FOS Check
Right Left Right Left Right Left Right Left Top Bot. Top Bot. Top Bot. Top Bot.
1 760 1070 4915 3085 6.5 2.9 Okay Okay 448 112 883 1219 2.0 10.9 Okay Okay
2 1907 1077 4013 6996 2.1 6.5 Okay Okay 157 202 1205 1160 7.7 5.7 Okay Okay
3 187 332 3151 2633 16.9 7.9 Okay Okay 334 0 658 993 2.0 N.O.T Okay Okay
4 1678 850 4947 7475 2.9 8.8 Okay Okay 0 321 1557 1237 N.O.T 3.9 Okay Okay
0 0 1972 1972 N.O.T N.O.T Okay Okay 0 0 493 493 N.O.T N.O.T Okay Okay
6 0 0 1972 1972 N.O.T N.O.T Okay Okay 0 0 493 493 N.O.T N.O.T Okay Okay
7 0 0 2191 2191 N.O.T N.O.T Okay Okay 0 0 548 548 N.O.T N.O.T Okay Okay
8 0 0 2191 2191 N.O.T N.O.T Okay Okay 0 0 548 548 N.O.T N.O.T Okay Okay
9 0 0 2191 2191 N.O.T N.O.T Okay Okay 0 0 548 548 N.O.T N.O.T Okay Okay
10 0 0 2191 2191 N.O.T N.O.T Okay Okay 0 0 548 548 N.O.T N.O.T Okay Okay

N.O.T - No Overturning.
FOSTER WHEELER
SUBJECT : FOOTING DESIGN FOR PIPERACK WA15 : CF1 Sheet No : 4 of 7
PROJECT: PETRORabigh UOU Rev Date Originator Checker Approver

CONTRACT NO : 1-14-2410/59 O1 16-Nov-06 TPR Ashokan


SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
IV) STRENGTH DESIGN OF FOOTING
IV-A) INPUTS
Clear cover for reinforcement = 75 mm
Grade of concrete = 5000 PSI = 34.4 N/mm2
Grade of steel = 60000 PSI = 412.6 N/mm2
Eff. depth of footing X Dir -Bot. = 0.513 m
Eff. depth of footing Z Dir -Bot. = 0.488 m
Eff. depth of footing X Dir -Top = 0.517 m
Eff. depth of footing Z Dir -Top = 0.501 m
Min. ratio of reinf. for footings = 0.0018 As per Cl. No:10.5.4 & 7.12.2.1 of ACI-318
2
Hence Ast min =0.0018*600*1000 = 1080.0 mm /m
2
Bottom X Dir reinf. diameter(Prov) 25 mm @ 150 mm c/c @ bot => 3272 mm /m > 1080 Hence okay
2
Bottom Z Dir reinf. diameter(Prov) 25 mm @ 150 mm c/c @ bot => 3272 mm /m > 1080 Hence okay
2
Top X Dir reinf. diameter (Prov) 16 mm @ 150 mm c/c @ Top => 1340 mm /m > 1080 Hence okay
2
Top Z Dir reinf. diameter (Prov) 16 mm @ 150 mm c/c @ Top => 1340 mm /m > 1080 Hence okay

Allowable one way shear stress = φ 2 f1c0.5 Cl No: 11.1.1 and Cl. No: 11.3.1
= (0.75*2*5000^0.5)*0.006877
= 0.729 N/mm2

Dead
Fx1 Fy1 Fz1 Mx1 Mz1 Fx2 Fy2 Fz2 Mx2 Mz2
Sl. No. Load case/node nos load
1 115 (238-5) 0.90 -93.5 113.2 38.2 0.0 0.0 9.5 -173.1 99.5 0.0 0.0
2 109 (238-5) 1.20 -263.2 437.3 37.2 0.0 0.0 24.2 -263.1 101.1 0.0 0.0
3 115 (238-5) 0.90 -93.5 113.2 38.2 0.0 0.0 9.5 -173.1 99.5 0.0 0.0
4 109(238-5) 1.20 -263.2 437.3 37.2 0.0 0.0 24.2 -263.1 101.1 0.0 0.0
5 1.20 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6 0.90 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7 1.20 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8 1.40 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9 1.20 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10 0.90 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
FOSTER WHEELER
SUBJECT : FOOTING DESIGN FOR PIPERACK WA15 : CF1 Sheet No : 5 of 7
PROJECT: PETRORabigh UOU Rev Date Originator Checker Approver

CONTRACT NO : 1-14-2410/59 O1 16-Nov-06 TPR Ashokan


SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001

IV-B) DESIGN ALONG LONGITUDINAL DIRECTION FOR BM & ONE WAY SHEAR

Tot. Fy1 Tot Mx1 Tot Mz1 Tot. Fy2 Tot. Mx2 Tot Mz2 CG of loads
Eccentric Add. Moment Total Moment Pressure at(kN/m2)
Sl. No. from Left ped.
(kN) (kN-m) (kN-m) (kN) (kN-m) (kN-m) (m) ity (m) Mz (kN-m) Mz (kN-m) Left Right
1 140.3 -150.9 -369.4 -145.9 -393.0 37.6 181.526 178.026 1002 670 31.1 -31.8
2 473.5 -146.8 -1039.7 -227.0 -399.2 95.6 -6.443 -9.943 2452 1507 86.1 -55.3
3 140.3 -150.9 -369.4 -145.9 -393.0 37.6 181.526 178.026 1002 670 31.1 -31.8
4 473.5 -146.8 -1039.73 -227.0 -399.2 95.6 -6.443 -9.943 2452 1507 86.1 -55.3
5 36.2 0.0 0.00 36.2 0.0 0.0 3.500 0.000 0.0 0.0 4.5 4.5
6 27.1 0.0 0.0 27.1 0.0 0.0 3.500 0.000 0 0 3.4 3.4
7 36.2 0.0 0.00 36.2 0.0 0.0 3.500 0.000 0.0 0.0 4.5 4.5
8 42.2 0.0 0.00 42.2 0.0 0.0 3.500 0.000 0.0 0.0 5.3 5.3
9 36.2 0.0 0.00 36.2 0.0 0.0 3.500 0.000 0.0 0.0 4.5 4.5
10 27.1 0.0 0.00 27.1 0.0 0.0 3.500 0.000 0.0 0.0 3.4 3.4

Shear Force (kN) Bending Moment (kN-m)


Sl. No. Pr. At Ped. (kN/m2) At Left Ped. At Bot. Ped. At Left pedestal At Right Pedestal
Left Ped. Right Ped. Just Left At centre Just Left Just Right Just Left At centre Just Left Just Right
1 27.1 -27.8 29.1 -111.2 -116.1 29.8 7.4 376.8 30 -7.6
2 77.2 -46.4 81.7 -391.9 -176.1 50.8 20.8 1060.5 82 -13.1
3 27.1 -27.8 29.1 -111.2 -116.1 29.8 7.4 376.8 30 -7.6
4 77.2 -46.4 81.7 -391.9 -176.1 50.8 20.8 1060.5 82 -13.1
5 4.5 4.5 4.5 -31.7 31.7 -4.5 1.1 1.1 1 1.1
6 3.4 3.4 3.4 -23.7 23.7 -3.4 0.8 0.8 1 0.8
7 4.5 4.5 4.5 -31.7 31.7 -4.5 1.1 1.1 1 1.1
8 5.3 5.3 5.3 -36.9 36.9 -5.3 1.3 1.3 1 1.3
9 4.5 4.5 4.5 -31.7 31.7 -4.5 1.1 1.1 1 1.1
10 3.4 3.4 3.4 -23.7 23.7 -3.4 0.8 0.8 1 0.8
FOSTER WHEELER
SUBJECT : FOOTING DESIGN FOR PIPERACK WA15 : CF1 Sheet No : 6 of 7
PROJECT: PETRORabigh UOU Rev Date Originator Checker Approver

CONTRACT NO : 1-14-2410/59 O1 16-Nov-06 TPR Ashokan


SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001

Sl. No. Bot Moment Ast reqd (mm 2) Ast Check Top Ast reqd Ast Check Max. Shear Check
(kN-m) pro.(mm2) Moment (mm2) pro.(mm2) shear stress
(kN) (kN) (N/mm2)
1 376.8 2007.8 6545 Okay -7.6 39.7 2681 Okay 116.1 0.113 Okay
2 1060.5 5804.2 6545 Okay -13.1 68.1 2681 Okay 391.9 0.382 Okay
3 376.8 2007.8 6545 Okay -7.6 39.7 2681 Okay 116.1 0.113 Okay
4 1060.5 5804.2 6545 Okay -13.1 68.1 2681 Okay 391.9 0.382 Okay
5 1.1 5.9 6545 Okay 0.0 0.0 2681 Okay 31.7 0.031 Okay
6 0.8 4.5 6545 Okay 0.0 0.0 2681 Okay 23.7 0.023 Okay
7 1.1 5.9 6545 Okay 0.0 0.0 2681 Okay 31.7 0.031 Okay
8 1.3 6.9 6545 Okay 0.0 0.0 2681 Okay 36.9 0.036 Okay
9 1.1 5.9 6545 Okay 0.0 0.0 2681 Okay 31.7 0.031 Okay
10 0.8 4.5 6545 Okay 0.0 0.0 2681 Okay 23.7 0.023 Okay

IV-C) DESIGN ALONG TRANSVERSE DIRECTION FOR BM & ONE WAY SHEAR
Cantilever Projection of footing 0.7 m

Max. Pr due to Pr. Due to BM at


Ver. Load + Total Shear
Trans.Moment face of Ast reqd
Sl. No. Long. Moment 2 pressure Shear (kN) Stress Check
(kN/m ) ped. (kN- (mm2)
(kN/m 2) (kN/m2) m) (N/mm2)
Mx
1 31.1 101.97 133.03 32.59 180.50 93.12 0.19 Okay
2 86.1 102.38 188.45 46.17 255.98 131.92 0.27 Okay
3 31.1 101.97 133.03 32.59 180.50 93.12 0.19 Okay
4 86.1 102.38 188.45 46.17 255.98 131.92 0.27 Okay
5 4.5 0.00 4.52 1.11 6.12 3.17 0.01 Okay
6 3.4 0.00 3.39 0.83 4.59 2.37 0.00 Okay
7 4.5 0.00 4.52 1.11 6.12 3.17 0.01 Okay
8 5.3 0.00 5.28 1.29 7.14 3.69 0.01 Okay
9 4.5 0.00 4.52 1.11 6.12 3.17 0.01 Okay
10 3.4 0.00 3.39 0.83 4.59 2.37 0.00 Okay
FOSTER WHEELER
SUBJECT : FOOTING DESIGN FOR PIPERACK WA15 : CF1 Sheet No : 7 of 7
PROJECT: PETRORabigh UOU Rev Date Originator Checker Approver

CONTRACT NO : 1-14-2410/59 O1 16-Nov-06 TPR Ashokan


SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
III-C) TWO WAY SHEAR CHECK
Punching shear check at 0.5 d from face of pedestal
Permissible shear stress is minimum of following
2
1) 0.75* 4* f1c0.5 = (0.75*4*5000^0.5)*0.006877 = 1.459 N/mm
2
2) 0.75*[2+ 4/βc] *f1c0.5 = (0.75*(2+4/1.000)*5000^0.5)*0.006877 = 2.195 N/mm
Where β - Ratio of long side to short side of the column = 1.000
Hence allowable shear stress = 1.459 N/mm2
Length of punching periphery = 3.425 m
Sl. No. Max. col. Pun. Shear Check
stress (N/mm 2)
Load (kN)
1 140.3 0.08 Okay
2 473.5 0.27 Okay
3 140.3 0.08 Okay
4 473.5 0.27 Okay
5 36.2 0.02 Okay
6 27.1 0.02 Okay
7 36.2 0.02 Okay
8 42.2 0.02 Okay
9 36.2 0.02 Okay
10 27.1 0.02 Okay

Diagrams of 1st Load Case of Table.

Left Ped.
-116.1 30

140.3 - 29.1

7.4
29.8
-31.8 -7.6

31.1
-111.2
376.8
DESIGN PRESSURE DIAGRAM SHEAR FORCE DIAGRAM BENDING MOMENT DIAGRAM

[BM diagram is drawn as line, instead of curve, on an approximate]


FOSTER WHEELER
SUBJECT : PIPE RACK WA15 - DESIGN CALCULATIONS Sheet No : K1 OF K1
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 16-Nov-06 TPR ASHOKAN
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001

APPENDIX J
DESIGN OF PEDESTAL-PD1
FOSTER WHEELER
SUBJECT : PIPE RACK WA15 - DESIGN CALCULATIONS Sheet No :
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 16-Nov-06 TPR ASHOKAN
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
1 STRENGTH DESIGN OF PEDESTAL
(Ref. ACI 318-2005)
Critical STAAD file : WA15
Critical Node : 3
Critical Load Case : 115
Fx Fy Fz mx mz
(kN) (kN) (kN) (kNm) (kNm)
69.00 -55.00 4.00 0 0

Axial Force (Fy) at Pedestal level, Pu = -55.0 kN (From support reactions, Section 3)
Width of Pedestal, b = 600.0 mm
Depth of Pedestal, h = 600.0 mm
Effective depth, d = 540.0 mm
Area of cross section of Pedestal, Ag = 360000 mm²

Grade beam is designed as short column with axial force(tension/compression) with bending.

Yield Strength of Steel, fy = 420 N/mm² = 61073 psi


Characteristic strength of Concrete, f'c = 35 N/mm² = 5089 psi

Height of pedestal from centre of


Grade Beam, H = 1.825 m

a) Tension with bending

Resultant Shear Force (Fx) at Pedestal level = 69.1 kN (From support reactions, Section 3)
Mu = Fx*H = 126.14 kNm
Moment co-efficient, Φ = 0.90

Mn' = (Mu-Pu(d-h/2))/Φ = 61.88 kNm


Pn = Pu/Φ = 61.11 kN

K = Mn'/(bd²f'c) = 0.01
z/d = 0.5+(0.25-K/1.7)^0.5 = 0.99 Shall not exceed 0.95
z/d = 0.95
Area of steel required
Ast = Mn'/(fy*d(z/d)) + (Pn/fy) = 433 mm²

So longitudinal bars required,


Providing reinforcement of : 5 nos of 20 mm dia.
Area of steel required, Ast = 1570.8 mm2 Safe
Provide on sides the same reinforcement
Total no of bars required : 16 nos of 20 mm dia.
Minimum reinforcement, 0.5% Ag = 1800 2
mm
= 5027 2 Safe
So Ast provided mm

Ties reqired,
Providing 10.0 mm dia. bars
Spacing, as per ACI 318, Cl. 7.10.5.2
Minimum of
16 *Longitudinal bars = 320 mm
48*Tie dia. = 480 mm
Least lateral dimension = 600 mm

Provide 10.0 mm dia. Bars @ 150 mm c/c.


FOSTER WHEELER
SUBJECT : PIPE RACK WA15 - DESIGN CALCULATIONS Sheet No :
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 16-Nov-06 TPR ASHOKAN
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
b) Compression with bending

Fx Fy Fz mx mz
(kN) (kN) (kN) (kNm) (kNm)
70.00 440.00 6.00 0 0

Axial Force (Fy) at Pedestal level, Pu = 440.0 kN (From support reactions, Section 3)
Width of Pedestal, b = 600.0 mm
Depth of Pedestal, h = 600.0 mm
Effective depth, d = 540.0 mm
Area of cross section of Pedestal, Ag = 360000 mm²

Resultant Shear Force (Fx) at Pedestal level = 70.3 kN (From support reactions, Section 3)
Mu = Fx*H = 128.22 kNm
Moment co-efficient, Φ = 0.9-(0.2Pu/0.1f'cAg) = 0.83

Mn' = (Mu+Pu(d-h/2))/Φ = 174.8 kNm


Pn = Pu/Φ = 530.02 kN

K = Mn'/(bd²f'c) = 0.03
z/d = 0.5+(0.25-K/1.7)^0.5 = 0.98 Shall not exceed 0.95
z/d = 0.95
Area of steel required
Ast = Mn'/(fy*d(z/d)) - (Pn/fy) = 451 mm²

So longitudinal bars required,


Providing reinforcement of : 5 nos of 20 mm dia.
Area of steel required, Ast = 1570.8 mm2 Safe
Provide on sides the same reinforcement
Total no of bars required : 16 nos of 20 mm dia.
Minimum reinforcement, 0.5% Ag = 1800 2
mm
So Ast provided = 5027 mm2 Safe

Ties reqired,
Providing 10.0 mm dia. bars
Spacing, as per ACI 318, Cl. 7.10.5.2
Minimum of
16 *Longitudinal bars = 320 mm
48*Tie dia. = 480 mm
Least lateral dimension = 600 mm

Provide 10.0 mm dia. Bars @ 150 mm c/c.


FOSTER WHEELER
SUBJECT : PIPE RACK WA15 - DESIGN CALCULATIONS Sheet No : K1 OF K1
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 16-Nov-06 TPR Ashokan
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001

APPENDIX J
DESIGN OF PEDESTAL-PD2
FOSTER WHEELER
SUBJECT : PIPE RACK WA15 - DESIGN CALCULATIONS Sheet No :
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 16-Nov-06 TPR ASHOKAN
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
1 STRENGTH DESIGN OF PEDESTAL
(Ref. ACI 318-2005)
Critical STAAD file : WA15
Critical Node : 5
Critical Load Case : 109
Fx Fy Fz mx mz
(kN) (kN) (kN) (kNm) (kNm)
101.00 -263.00 24.00 0 0

Axial Force (Fy) at Pedestal level, Pu = -263.0 kN (From support reactions, Section 3)
Width of Pedestal, b = 600.0 mm
Depth of Pedestal, h = 600.0 mm
Effective depth, d = 537.5 mm
Area of cross section of Pedestal, Ag = 360000 mm²

Grade beam is designed as short column with axial force(tension/compression) with bending.

Yield Strength of Steel, fy = 420 N/mm² = 61073 psi


Characteristic strength of Concrete, f'c = 35 N/mm² = 5089 psi

Height of pedestal from centre of


Grade Beam, H = 3.35 m

a) Tension with bending

Resultant Shear Force (Fx) at Pedestal level = 103.8 kN (From support reactions, Section 3)
Mu = Fx*H = 347.77 kNm
Moment co-efficient, Φ = 0.90

Mn' = (Mu-Pu(d-h/2))/Φ = 85.17 kNm


Pn = Pu/Φ = 292.22 kN

K = Mn'/(bd²f'c) = 0.01
z/d = 0.5+(0.25-K/1.7)^0.5 = 0.99 Shall not exceed 0.95
z/d = 0.95
Area of steel required
Ast = Mn'/(fy*d(z/d)) + (Pn/fy) = 1093 mm²

So longitudinal bars required,


Providing reinforcement of : 5 nos of 25 mm dia.
Area of steel required, Ast = 2454.4 mm2 Safe
Provide on sides the same reinforcement
Total no of bars required : 16 nos of 25 mm dia.
Minimum reinforcement, 0.5% Ag = 1800 2
mm
= 7854 2 Safe
So Ast provided mm

Ties reqired,
Providing 10.0 mm dia. bars
Spacing, as per ACI 318, Cl. 7.10.5.2
Minimum of
16 *Longitudinal bars = 400 mm
48*Tie dia. = 480 mm
Least lateral dimension = 600 mm

Provide 10.0 mm dia. Bars @ 150 mm c/c.


FOSTER WHEELER
SUBJECT : PIPE RACK WA15 - DESIGN CALCULATIONS Sheet No :
PROJECT: PETRORabigh, UOU PROJECT Rev Date Originator Checker Approver
CONTRACT NO : 1-14-2410/59 O1 16-Nov-06 TPR ASHOKAN
SAFETY CALC. YES
CALC. NO 2411-8320-CA-WA15-0001
b) Compression with bending

Fx Fy Fz mx mz
(kN) (kN) (kN) (kNm) (kNm)
88.00 940.00 16.00 0 0

Axial Force (Fy) at Pedestal level, Pu = 940.0 kN (From support reactions, Section 3)
Width of Pedestal, b = 600.0 mm
Depth of Pedestal, h = 600.0 mm
Effective depth, d = 537.5 mm
Area of cross section of Pedestal, Ag = 360000 mm²

Resultant Shear Force (Fx) at Pedestal level = 89.4 kN (From support reactions, Section 3)
Mu = Fx*H = 299.63 kNm
Moment co-efficient, Φ = 0.9-(0.2Pu/0.1f'cAg) = 0.75

Mn' = (Mu+Pu(d-h/2))/Φ = 427.4 kNm


Pn = Pu/Φ = 1252.01 kN

K = Mn'/(bd²f'c) = 0.07
z/d = 0.5+(0.25-K/1.7)^0.5 = 0.96 Shall not exceed 0.95
z/d = 0.95
Area of steel required
Ast = Mn'/(fy*d(z/d)) - (Pn/fy) = 988 mm²

So longitudinal bars required,


Providing reinforcement of : 5 nos of 25 mm dia.
Area of steel required, Ast = 2454.4 mm2 Safe
Provide on sides the same reinforcement
Total no of bars required : 16 nos of 25 mm dia.
Minimum reinforcement, 0.5% Ag = 1800 2
mm
So Ast provided = 7854 mm2 Safe

Ties reqired,
Providing 10.0 mm dia. bars
Spacing, as per ACI 318, Cl. 7.10.5.2
Minimum of
16 *Longitudinal bars = 400 mm
48*Tie dia. = 480 mm
Least lateral dimension = 600 mm

Provide 10.0 mm dia. Bars @ 150 mm c/c.