1.

12 ALL INSTRUMENTS SPECIFIED IN THE P&ID, WHICH


FALL WITHIN THE SKID BOUNDARY LIMITS SHALL BE
PROVIDED, INSTALLED, CALIBRATED AND TESTED AS A
PART OF SKID UNIT.

1.13 INSTRUMENTATION CABINETS AND CONTROLS


PANELS AS PER 34-SAMSS-820.

1.14 PRESSURE INDICATORS, DIFFERENTIAL PRESSURE


INDICATORS, TEMPERATURE INDICATOR, LEVEL
SWITCHES, PRESSURE SWITCHES, LEVEL TRANSMITTER,
LEVEL GAUGE, THERMOWELL, HAND SWITCHES FOR
PUMPS, H2S/LEL DETECTORS, H2S/LEL BECONS AND
HORN, LOCAL GAS MONITORING PANEL AND SAFETY
RELIEF VALVES.

1.15 ELECTRICAL JUNCTION BOX, SKID MOUNTED.

1.16 INSTRUMENTATION JUNCTION BOX, SKID MOUNTED.

1.17 INSTRUMENTATION CABLES WIRED TO JUNCTION


BOXES.

1.18 SKID AND ELECTRICAL EQUIPMENT GROUNDING.

1.19 SKID FRAME, PLATFORM, LADDER AND ASSOCIATED


WALKWAY FOR EACH UNIT.

1.20 LIFTING LUGS AND LIFTING BEAMS TO LIFT THE


ENTIRE SKID WITH SINGLE LIFT.

1.21 NAMEPLATES AND TAGS.

1.22 SPECIAL TOOLS, FIXTURES, AND MAINTENANCE


EQUIPMENT (AS APPLICABLE).

1.23 COMPLETE SET OF START-UP AND COMMISSIONING


SPARE PARTS FOR THE SKID PACKAGE.

1.24 SKID SHELTER FOR OVERALL SKID.

1.25 DRIP PAN COVERING ENTIRE AREA OF THE SKID.

1.26 VENDOR SHALL (WHERE REQUIRED) MAKE


PROVISION FOR SUITABLY QUALIFIED AND
EXPERIENCED PERSONNEL TO BE AVAILABLE FOR THE
SUPERVISION OF FIELD SERVICES.

1.27 THE FIELD SERVICES SHALL CONSIST OF ANY OR


ALL OF THE FOLLOWING:
 INSTALLATION
 COMMISSIONING
TRAINING OF OPERATING PERSONNEL IN EQUIPMENT
USE AND MAINTENANCE.

1.28 PIPING, PIPE SUPPORTS, VALVES, TUBING,


GASKETS, FLANGES, FITTINGS AND VALVES WITHIN THE
CONFINES OF THE SKID

1.29 FLANGED PIPING TERMINATIONS FOR ALL


CUSTOMER PIPING CONNECTIONS

1.30 SKID DRIP PAN WITH ISOLATION VALVE