FALL WITHIN THE SKID BOUNDARY LIMITS SHALL BE PROVIDED, INSTALLED, CALIBRATED AND TESTED AS A PART OF SKID UNIT.
1.13 INSTRUMENTATION CABINETS AND CONTROLS
PANELS AS PER 34-SAMSS-820.
1.14 PRESSURE INDICATORS, DIFFERENTIAL PRESSURE
INDICATORS, TEMPERATURE INDICATOR, LEVEL SWITCHES, PRESSURE SWITCHES, LEVEL TRANSMITTER, LEVEL GAUGE, THERMOWELL, HAND SWITCHES FOR PUMPS, H2S/LEL DETECTORS, H2S/LEL BECONS AND HORN, LOCAL GAS MONITORING PANEL AND SAFETY RELIEF VALVES.
1.15 ELECTRICAL JUNCTION BOX, SKID MOUNTED.
1.16 INSTRUMENTATION JUNCTION BOX, SKID MOUNTED.
1.17 INSTRUMENTATION CABLES WIRED TO JUNCTION
BOXES.
1.18 SKID AND ELECTRICAL EQUIPMENT GROUNDING.
1.19 SKID FRAME, PLATFORM, LADDER AND ASSOCIATED
WALKWAY FOR EACH UNIT.
1.20 LIFTING LUGS AND LIFTING BEAMS TO LIFT THE
ENTIRE SKID WITH SINGLE LIFT.
1.21 NAMEPLATES AND TAGS.
1.22 SPECIAL TOOLS, FIXTURES, AND MAINTENANCE
EQUIPMENT (AS APPLICABLE).
1.23 COMPLETE SET OF START-UP AND COMMISSIONING
SPARE PARTS FOR THE SKID PACKAGE.
1.24 SKID SHELTER FOR OVERALL SKID.
1.25 DRIP PAN COVERING ENTIRE AREA OF THE SKID.
1.26 VENDOR SHALL (WHERE REQUIRED) MAKE
PROVISION FOR SUITABLY QUALIFIED AND EXPERIENCED PERSONNEL TO BE AVAILABLE FOR THE SUPERVISION OF FIELD SERVICES.
1.27 THE FIELD SERVICES SHALL CONSIST OF ANY OR
ALL OF THE FOLLOWING: INSTALLATION COMMISSIONING TRAINING OF OPERATING PERSONNEL IN EQUIPMENT USE AND MAINTENANCE.
1.28 PIPING, PIPE SUPPORTS, VALVES, TUBING,
GASKETS, FLANGES, FITTINGS AND VALVES WITHIN THE CONFINES OF THE SKID