Direct Charge Purchase Requisition Purchase Requisition (PR) #

ERDD Maintenance Division


Date Equipment Tag Number Subject
NA Provide Detergent Skid for PG-91 & PG-95 at DHBP
Requestor's Name Badge No. Telephone

Charging Account Unloading Point: Plant:

Recommended Vendor Number & Name:

User Justification
This request is needed to provide detergent skid for PG-91 & PG-95 at DHBP.

Handling Priority Ship Mode

Single Source Emergency NMR Inspection Cataloging


Single Source justification is required when selected.

Item 9COM Material Description Issue Cost $ Total $


Qty
# Unit (USD) (USD)
PROVIDE DCA (DEPOSIT CONTROL ADDITIVE)
DETERGENT INJECTION SKID, SHOP FABRICATED, TYPE;
THE SKID SHALL BE SUPPLIED IN ACCORDANCE TO THE
ATTACHED TECHNICAL SPECIFICATION EWO–19L110 AND
DATASHEET FOR PUMPS PE-G7XXX3, PE-G7XXX2 AND
TANK PE-D7XXX1-001.

THE UNIT SHALL BE SKID MOUNTED AND SHALL INCLUDE


STRUCTURAL STEEL SHELTER, A STORAGE TANK OF 29859
GAL (113.03 M3) WORKING CAPACITY AND SIZE OF 19.34
FT DIA x 19.34 FT HEIGHT, TWO (2EA) DCA INJECTION
PUMPS FOR GASOLINE-91 OF RATED CAPACITY 19.92 GPH,
DIFFERENTIAL PRESSEURE 65 PSIG DRIVEN BY 2.0 HP
MOTOR (VTC), TWO (2EA) DCA INJECTION PUMPS FOR
GASOLINE-95 OF RATED CAPACITY 19.92 GPH,
DIFFERENTIAL PRESSEURE 65 PSIG DRIVEN BY 0.50 HP
001 6000002309 MOTOR (VTC) 1 EA

MOTORS, PIPING, INSTRUMENTATION, LOCAL CONTROL


PANEL AND ELECTRICAL CABLES COMPLETE WITH ALL
ACCESSORIES. ALL COMPONENTS SHALL BE INSIDE THE
SKID LIMIT, AS INDICATED IN P&ID. SUPPLY, DISCHARGE,
OVERFLOW, AND SKID DRAINS SHALL ALL TERMINATE
WITH FLANGE AT THE EDGE OF SKID LIMIT.
NO EQUIPMENT, PIPING, JUNCTION BOX AND OTHER ITEM
SHALL PROJECT BEYOND THE SKID’S EDGE.

MAJOR ITEMS:

1.1 ONE (1) EACH, TANK, 29859 GAL (113.03 M3)


WORKING CAPACITY, 316L MATERIAL, 19.34 FT DIA
AND 19.34 FT HEIGHT, CYLINDRICAL GEOMETERY
AND VERTICAL ORIENTATION, 175˚F MAXIMUM
Saudi Aramco: Company General Use