You are on page 1of 1

Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
AAB SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• Electronic Stroke Controller
WAB

• One Pressure Vacuum relief valve and one flame arrester on storage tank.
ENGG CERT

CIB

Instruments shall be wired to skid edge mounted Local control panel as per P&ID.
Instruments which are connected to SCADA/RTU shall be terminated at Junction
NSA

Boxes provided at skid edge. These Junction boxes to be supplied by skid Vendor.

P&ID shows the Alarms required in Local Control Panel. Alarm for Diaphragm
detection also shall be provided in Local Control panel as well as in SCADA. Relay
based Interlock shall be provided to trip the pump, when the liquid level reaches
low low.
DESCRIPTION

The chemical injection pumps shall be provided with appropriate alarms and
ISSUED FOR CONSTRUCTION

automated controls to provide immediate switchover from running to standby pump,


in case of pump failure.

For Local Control Panel, individual indicating lights shall be semi-flush mounted on
the compartment door for each switching assemblies employing contactors. They
shall be red “RUNNING”, “ON”, “I” and green “STOPPED”, “OFF” or “O”. These
Lights shall be controlled through the contactor auxiliary contacts.
19000-9284
JO/EWO
CER 11-

All instruments/control panel etc shall be procured from Aramco approved Vendors.
07/16/19

14.0 COATING/PAINTING
DATE

Vendor shall include all Painting/Coating works necessary to provide a complete,


NO.
REV

00

functional facility in accordance with the drawings detailed in section 2.1 and Codes
DISCIPLINE
ENGINEER Standards and Specifications as detailed in section 2 to the satisfaction of COMPANY
NSA Representative.
07/16/19
04/14/13
DATE:
PROJECT
ENGINEER All coatings shall be shop-applied, except for field touchups as necessary after
HMA installation.
04/14/13
07/16/19
DATE:
CERTIFIED Manufacturer standard painting system may be accepted. Manufacturer‘s standard
CIB
04/14/13
painting and coating system shall be submitted to Saudi Aramco for review prior to use.
07/16/19
DATE:
CONSTRUCTION
AGENCY Vendor shall consider corrosion protection for additional stills in the Corrosion Inhibitor
WAB
Injection Skid.
07/16/19
DATE:
OPERATIONS
15.0 SPECIAL TOOLS
ABB

07/16/19
DATE: Vendor shall provide any special tools, test equipment, or fixtures that are required to
CONTROL NUMBER

properly install and maintain the equipment. These are items specifically designed for
VERIFICATION

the equipment that would not be available in plant standard maintenance tools
EDSD

inventory. These special tools shall be clearly identified in the Vendor’s proposal.
DATE:
BY:

When special tools are provided, they shall be packaged separately and marked
REVISIONCERTIFICATION

“special tools for (item number).” Each tool shall be stamped or tagged to indicate the
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


A

intended use.
00

11-19000-9284-001
(DCC) NO. _____________________

16.0 NAME PLATE

TECHNICAL SPECIFICATIONS FOR CORROSION INHIBITOR INJECTION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

SKID TIE-IN HRML-824 WS WELL TO HRML PWI DOC


434 TE- 126923 25
GOSP A OF 00
HARMALIYAH SAUDI ARABIA JO / EWO:
11-19000-9284 31
EDSD/2616-0399.doc