Vendor shall be responsible for the design, procurement, installation, testing and
pre-commissioning of all Instrumentation, Junction Boxes, cables, wires and tubing
required to produce a fully functioning Corrosion Inhibitor Injection Skid that complies
with the standards, specifications and drawings referenced within this document.
Vendor shall ensure that all instrumentation and control devices supplied and used in
the manufacturing of the Corrosion Inhibitor Injection Skid are rated for the
19000-9284
JO/EWO
CER 11-
Vendor shall select all instrumentation and control equipment suppliers based upon
DATE
00
Vendor’s scope shall include but not be limited to the instrumentation and control
DISCIPLINE
ENGINEER
devices shown on P&ID’s, instrument specifications, datasheets and drawings
NSA contained as attachments to this specification.
07/16/19
04/14/13
DATE:
PROJECT
ENGINEER Vendor shall be responsible for the complete engineering package, producing final
HMA design drawings for the Corrosion Inhibitor Injection Skid comprises but not be
04/14/13
DATE:
07/16/19 limited to:
CERTIFIED
CIB
04/14/13
i. Instrument equipment layout drawings.
07/16/19
DATE:
CONSTRUCTION ii. Instrument installation details (mounting and hook up).
AGENCY
WAB
iii. Instrument cable routing and final termination details.
07/16/19
DATE:
OPERATIONS
iv. Interconnection diagrams
ABB v. Instrument specification sheets.
07/16/19
DATE:
vi. Junction boxes layout drawings
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
x. Control Narratives
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
11-19000-9284-001
TECHNICAL SPECIFICATIONS FOR CORROSION INHIBITOR INJECTION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION