Local Control panel shall be procured from Aramco Approved Vendors.


ENGG CERT

CIB

13.0 INSTRUMENTATION AND CONTROL


NSA

Vendor to Supply all required instrumentation and control as a package in compliance


with 34-SAMSS-831 Saudi Aramco Standards

Vendor shall include all Instrumentation works necessary to provide a complete,


functional facility in accordance with the Drawings, Codes, Standards and Specifications
as detailed in section 2 to the satisfaction of SAUDI ARAMCO representative.
DESCRIPTION

13.1 Scope of Work


ISSUED FOR CONSTRUCTION

Vendor shall be responsible for the design, procurement, installation, testing and
pre-commissioning of all Instrumentation, Junction Boxes, cables, wires and tubing
required to produce a fully functioning Corrosion Inhibitor Injection Skid that complies
with the standards, specifications and drawings referenced within this document.

Vendor shall ensure that all instrumentation and control devices supplied and used in
the manufacturing of the Corrosion Inhibitor Injection Skid are rated for the
19000-9284
JO/EWO
CER 11-

environmental conditions stated in SAES-J-003.


07/16/19

Vendor shall select all instrumentation and control equipment suppliers based upon
DATE

the Saudi Aramco technically approved Vendors list.


NO.
REV

00

Vendor’s scope shall include but not be limited to the instrumentation and control
DISCIPLINE
ENGINEER
devices shown on P&ID’s, instrument specifications, datasheets and drawings
NSA contained as attachments to this specification.
07/16/19
04/14/13
DATE:
PROJECT
ENGINEER Vendor shall be responsible for the complete engineering package, producing final
HMA design drawings for the Corrosion Inhibitor Injection Skid comprises but not be
04/14/13
DATE:
07/16/19 limited to:
CERTIFIED
CIB
04/14/13
i. Instrument equipment layout drawings.
07/16/19
DATE:
CONSTRUCTION ii. Instrument installation details (mounting and hook up).
AGENCY
WAB
iii. Instrument cable routing and final termination details.
07/16/19
DATE:
OPERATIONS
iv. Interconnection diagrams
ABB v. Instrument specification sheets.
07/16/19
DATE:
vi. Junction boxes layout drawings
CONTROL NUMBER
VERIFICATION

vii. Final as-built logic drawings / control schematics


EDSD

viii. Cause & Effect Diagrams


DATE:
BY:

ix. I/O list


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

x. Control Narratives
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00 A

11-19000-9284-001

xi. Logic Diagram


(DCC) NO. _____________________

TECHNICAL SPECIFICATIONS FOR CORROSION INHIBITOR INJECTION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

SKID TIE-IN HRML-824 WS WELL TO HRML PWI DOC


434 TE- 126923 23
GOSP A OF 00
HARMALIYAH SAUDI ARABIA JO / EWO:
11-19000-9284 31
EDSD/2616-0399.doc