1. Outline of design-------------------------------- 1
1. Design standard
2. Soil boring log and planned section
3. Soil parameters
4. Allowable stress
Hirose(Thailand)LTD.
P-1
1.Outline of design
1-1 Design standard As per「Recommendation for Design and Construction Practice of
Earth Retaining for Excavation」by Architectural Institute of Japan.
10
11.000
8.750
2
15 15.000
3
16.000
20
21.000 Surcharge
q1= 15.00 kN/m 2
5
Earth retaining wall
25 25.000 SP-4
L= 16.000 m
(Protrusion -0.050 m)
Stress
σmax=
173 N/mm 2≦ fb = 225 N/mm 2
-OK-
30
Active side
Unit weight Internal Cohesion Modulus of Average Water
Soil friction subgrade unconfined pressure
Soil layer property N-value Wet Underwater angle reaction compressive coefficient
name strength
NO. (kN/m3) (kN/m3) ( ゚) (kN/m2) (kN/m3) (kN/m2)
1 Cohesive soil 1.0 15.3 5.3 0 11.5 1150 12.5 1.00
2 Cohesive soil 4.0 16.3 6.3 0 25.5 2550 50.0 1.00
3 Cohesive soil 6.0 16.8 6.8 0 40.0 4000 75.0 1.00
4 Cohesive soil 13.0 18.7 8.7 0 78.0 7800 162.5 1.00
5 Cohesive soil 22.0 20.0 10.0 0 132.0 13200 200.0 1.00
Passive side
Soil layer Unit weight Internal Cohesion Modulus of Average Water
change friction subgrade unconfined pressure
Soil layer position Wet Underwater angle reaction compressivecoefficient
strength
NO. DesignGL- (kN/m3) (kN/m3) ( ゚) (kN/m2) (kN/m3) (kN/m2)
1 11.000 15.3 5.3 0 11.5 1150 ---- 1.00
2 15.000 16.3 6.3 0 25.5 2550 ---- 1.00
3 16.000 16.8 6.8 0 40.0 4000 ---- 1.00
4 21.000 18.7 8.7 0 78.0 7800 ---- 1.00
5 25.000 20.0 10.0 0 132.0 13200 ---- 1.00
Hirose(Thailand)LTD.
P-2
Use the average of the stress for short term loading and stress for long term loading as the
allowable stress, since this calculation is for steel materials for temporary structures.
1.11×10 5
fb2=
(Lb・h)/Af
Use the larger one of the values obtained from the above formula.
However,it must be less than the allowable tensile stress.
81.3
fc =
(λ/120) 2 (λ>120)
Hirose(Thailand)LTD.
P-4
1)
Each Lm Ln W θ Na Nt Wd M N
stage (m) (m) (kN/m) (゚) (kN) (kN) (kN/m) (kN・m) (kN)
1st stage 5.000 2.000 68.98 45 137.95 0.00 5.00 15.63 195.09
2nd stage 5.000 2.000 169.50 45 339.01 0.00 5.00 15.63 479.43
3rd stage 5.000 2.000 253.36 45 506.71 0.00 5.00 15.63 716.60
Mounting bolt
Hirose(Thailand)LTD.
P-5
Decide the wet unit weight by the soil parameters explained in the outline of design.
The lateral pressure distribution diagram shows the lateral pressure per meter.
2.100 2.100
2.700 2.700
GL- 7.300 m
Final excavation level 82.35 ( 103.69) 0.65 15.300
Hirose(Thailand)LTD.
P-6
At 1st excavation
= 0.2790 m -1
Ld=π/β= 11.262 m
Dp=1/β+H= 4.985 m
Hirose(Thailand)LTD.
P-7
Active earth pressure : Set by using the triangular distribution formula shown in
(Recommendation for Design and Construction Practice of Earth Retaining for
Excavation) presented by Architectural Institute of Japan.
Pa=K(q+γ・h)
The lateral pressure distribution diagram shows the lateral pressure per meter.
q1= 15.00 kN/m 2
GL
9.75
500
14.72
3400
2900 1
2024
4268 1 2
88.29 43.56
Hirose(Thailand)LTD.
P-8
Hirose(Thailand)LTD.
P-9
The lateral pressure distribution diagram shows the lateral pressure per meter.
q1= 15.00 kN/m 2
GL
9.75
500 14.72
2000
34.61
5500
Y
3000 1
3362
1 2
6320
107.15 64.45
135.15
2 3
148.52 64.45
Hirose(Thailand)LTD.
P-10
The lateral pressure distribution diagram shows the lateral pressure per meter.
q1= 15.00 kN/m 2
GL
500 9.75
14.72
2000
34.61
7300 2100
55.50
Y
2700 1
3765 1 2
2 3
162.88 82.35
Hirose(Thailand)LTD.
P-11
Excavation side
Depth Δθ C Su'c Su'φ Δθ
No. GL-(m) (゚) (kN/m2 ) (kN/m) (kN/m)
1 7.300~11.000 20.43 11.5 46.79 0.00
2 11.000~15.000 31.59 25.5 160.43 0.00 C
ΔL
3 15.000~16.000 21.89 40.0 174.37 0.00
4 16.000~16.010 2.40 78.0 37.26 0.00
Total: 418.85 0.00
Sliding moment ※All values are based on the wet unit weight.
From 0.0~ 7.300m on the rear side, Σγt・Hn= 111.69 kN/m2
Md=(q+γt・H)・X 2 /2 =( 15.00+ 111.69) ・ 11.410 2 /2 = 8246.77 kN・m/m
N
3 1.000 11.636 78.81 38.18 48.72 0 0.000 0.00 Wn
4 1.000 12.758 85.88 45.76 61.52 0 0.000 0.00
5 1.000 13.630 91.37 52.43 72.42 0 0.000 0.00
6 1.000 14.321 95.72 58.55 81.65 0 0.000 0.00
7 0.753 14.813 74.38 63.60 66.62 0 0.000 0.00
8 1.000 15.198 101.35 68.41 94.24 0 0.000 0.00
9 1.000 15.542 103.68 73.73 99.53 0 0.000 0.00
Hirose(Thailand)LTD.
P-12
b
N Wn
Excavation side ΔSu’φ=N・tanφ=Wn・sinθn・tanφ
θn :Angle from horizontal line on
b h Wn θn Wn・sinθn φ tanφ ΔSu'φ
rear side to point of interest
No. (m) (m) (kN/m) (゚) (kN/m) (゚) (kN/m)
A1、A2:Area of lump of earth
13 0.478 8.705 24.67 91.20 24.66 0 0.000 0.00
h :Length of split piece
14 1.216 8.642 62.27 95.47 61.98 0 0.000 0.00
h1、h2:Length of split piece of
15 1.000 8.486 50.15 101.09 49.21 0 0.000 0.00
each soil layer
16 1.000 8.242 48.49 106.27 46.55 0 0.000 0.00
17 1.000 7.898 46.16 111.59 42.92 0 0.000 0.00 Weight of split piece
18 0.753 7.513 32.84 116.40 29.42 0 0.000 0.00 Wn=γ1・A1+γ2・A2+q・b
19 1.000 7.021 40.53 121.45 34.57 0 0.000 0.00 =b(γ1・h1+γ2・h2+q)
20 1.000 6.330 36.18 127.57 28.68 0 0.000 0.00
21 1.000 5.458 30.69 134.24 21.98 0 0.000 0.00
22 1.000 4.336 23.62 141.82 14.60 0 0.000 0.00
23 0.640 3.167 10.74 149.00 5.53 0 0.000 0.00
24 1.000 1.317 6.98 159.22 2.48 0 0.000 0.00
Hirose(Thailand)LTD.
11410
2
Design cross section
q= 15.00 kN/m
γ φ
15.3 0
12 11 10 9 8 7 6 5 4 3 2 1 150
5.3 0
4450
7300
R=11410
γ φ 4671 5.3 0
24 23 22 21 20 19 18 17 16 15 14 13
5.3 0 2635
1729 5.3 0
5.3 0 1065
6.3 0 1272 1272 6.3 0
8710
6.3 0 974 974 6.3 0
6.3 0 769 769 6.3 0
6.3 0 612 612 6.3 0
6.3 0 6.3 0
6.8 0 374 374 6.8 0
6.8 396 396 6.8 0
6.8
6.8
8.7
00
0 292
196 292
196 6.8
6.8
8.7 0
0
116
10 116
10
P-13
Hirose(Thailand)LTD.
P-14
Ld
Hirose(Thailand)LTD.
P-15
Use the triangular distribution formula shown in (Recommendation for Design and
Construction Practice of Earth Retaining for Excavation)presented by Architectural
Institute of Japan.
Decide the wet unit weight by the soil parameters explained in the outline of design.
The lateral pressure distribution diagram shows the lateral pressure per meter.
2.100 2.100
2.700 2.700
GL- 7.300 m
Final excavation level 82.35 ( 103.69) 0.65 15.300
Hirose(Thailand)LTD.
P-24
M
Bending stress σb = = 173 N/mm 2 ≦ 225 N/mm 2
-OK-
Z・α Z
Hirose(Thailand)LTD.
P-25
Hirose(Thailand)LTD.
P-26
5.Examination of waler
b
1) Span examined Lm m
Axial compression tributary width Ln m t2
Reaction force of waler W kN/m
Bending moment M =W・Lm 2 / 8 kN・m t1
Axial compression N =W・Ln kN h Af
Shearing force S =W・Lm/2 kN
Each Lm Ln W M N S
stage (m) (m) (kN/m) (kN・m) (kN) (kN)
1st stage 4.500 0.000 68.98 174.60 0.00 155.20
2nd stage 3.000 0.000 169.50 190.69 0.00 254.26
3rd stage 3.000 0.000 253.36 285.03 0.00 380.03
Hirose(Thailand)LTD.
P-27
6.Examination of strut
1) Span examined Lm m
Axial compression tributary width Ln m
Reaction force of waler W kN/m
Axial compression(Lateral pressure) Na=W・Ln kN
Axial compression(Temperature) Nt kN
Surcharge load(including self weight) Wd kN/m
Bending moment M =Wd・Lm 2 /8 kN・m
Axial compression(Lateral pressure and temperature) N =Na+Nt kN
Hirose(Thailand)LTD.
P-28
7.Examination of splay
1) Span examined Lm m
Axial compression tributary width Ln m θ
Reaction force of waler W kN/m
Axial compression(Lateral pressure) Na=W・Ln kN
Axial compression(Temperature) Nt kN
Surcharge load(including self weight) Wd kN/m
Bending moment M =Wd・Lm 2 /8 kN・m
Axial compression(Lateral pressure and temperature)
N =Na/sinθ+Nt kN
Mounting bolt
Hirose(Thailand)LTD.
P-29
Hirose(Thailand)LTD.