Q0 - CB
Q1 – DS upper bus
Q2 – DS lower bus
Q9 – line DS
Q53 – line ES
Q8 – HES
Q0 interlock condition
To close a CB there are two conditions:
I) To close the CB, we should energise relay K12 . In order to energise K12 we should follow the
below interlock conditions
II) Close block : CB SF6 low stage 1 relay should energise (K84)(ie. At normal pressure 630 kpa)
Q1 interlock condition
To operate Q2 , Relay K4 should energise, in either 3 condtions :
II) Q51,Q52,Q53,Q15B(Bus section Upper Bus bar earth s/w), Q0, and Q2 should open.
III) If both bus section and bus coupler is energized( ie. Both section and buses)
Q51, Q52, Q53,and Q15B (Bus coupler Upper Bus bar earth s/w) should Open and
Bus section Q0, Bus coupler Q0 , bay Q0, and Q2 should Close.
II) Q52, Q51, Q53 , Q25B(Bus coupler earth switch), Q0, and Q2 should Open.
III) If both bus section and bus coupler is energized( ie. Both section and buses)
Q51, Q52, Q53 and Q25B (Bus coupler lower Bus bar earth s/w) should Open and
Bus section Q0, Bus coupler Q0 , bay Q0, and Q1 should Close.
Q9 interlock condition
To operate Q9 , Relay K7 should energise, in either 2 condtions:
I) Q53 open and after Interlock override key to release , energises K1, directly energises K7.
II) Q53, Q51, Q52, Q8, and Q0 should open to energise K7. Sometimes Status of 13.8KV earth
switch of transformer feeder is also considered.
I) Q9 open and after Interlock override key to release , energises K1, directly energises K8.
Q8 interlock condition
To operate Q8 , Relay K9 should energise, in either 2 condtions:
II) Q9 Open, Q6 closed.Relays K27R, K27Y, K27B (VT voltage status) should de-energise, K49
(VT MCB status) should energise, K406 (VT fuse failure) should de-energise. Sometimes Status
of 13.8KV DS of transformer feeder is also considered.