You are on page 1of 3

INTERLOCK CONDTIONS

Q0 - CB

Q1 – DS upper bus

Q51 – ES upper bus

Q2 – DS lower bus

Q52 - ES lower bus

Q9 – line DS

Q53 – line ES

Q8 – HES
Q0 interlock condition
To close a CB there are two conditions:

I) To close the CB, we should energise relay K12 . In order to energise K12 we should follow the
below interlock conditions

1) Test condition : Q1 , Q2, Q9 should open to energise relay K2


2) Service condition : Q1 and Q9 should close Or} to energise relay K3
Q2 and Q9 should close } to energise relay K3 and
a) K1(interlock release key) should close or
b) Emrgency manual (S25) and visual check synchronism or
c) Emrgency manual (S25) and manual sync relay closes and VT fuse failure relay
K406 and bus VT fuse failure relay K407 should denergise

II) Close block : CB SF6 low stage 1 relay should energise (K84)(ie. At normal pressure 630 kpa)

To open a CB ( trip 1 and trip 2) we have two conditions:

I) Trip block relay K85 should energise

II) Trip block relay K04 should energise

Q1 interlock condition
To operate Q2 , Relay K4 should energise, in either 3 condtions :

I) Interlock override key to release , energises K1, directly energises K4

II) Q51,Q52,Q53,Q15B(Bus section Upper Bus bar earth s/w), Q0, and Q2 should open.

III) If both bus section and bus coupler is energized( ie. Both section and buses)
Q51, Q52, Q53,and Q15B (Bus coupler Upper Bus bar earth s/w) should Open and
Bus section Q0, Bus coupler Q0 , bay Q0, and Q2 should Close.

Q51 interlock condition


To operate Q51 we need to energise relay K6, and we have 2 conditions:

I) Interlock override key to release , energises K1, directly energises K6.

II) Q1, Q2, and Q9 should open to energise K6.


Q2 interlock condition
To operate Q2 , Relay K5 should energise, in either 3 condtions :

I) Interlock override key to release , energises K1, directly energises K5.

II) Q52, Q51, Q53 , Q25B(Bus coupler earth switch), Q0, and Q2 should Open.

III) If both bus section and bus coupler is energized( ie. Both section and buses)
Q51, Q52, Q53 and Q25B (Bus coupler lower Bus bar earth s/w) should Open and
Bus section Q0, Bus coupler Q0 , bay Q0, and Q1 should Close.

Q52 interlock condition


To operate Q52 we need to energise relay K6, and we have 2 conditions:

I) Interlock override key to release , energises K1, directly energises K6.

II) Q2, Q1, and Q9 should open to energise K6.

Q9 interlock condition
To operate Q9 , Relay K7 should energise, in either 2 condtions:

I) Q53 open and after Interlock override key to release , energises K1, directly energises K7.

II) Q53, Q51, Q52, Q8, and Q0 should open to energise K7. Sometimes Status of 13.8KV earth
switch of transformer feeder is also considered.

Q53 interlock condition


To operate Q53 we need to energise relay K8, and we have 2 conditions:

I) Q9 open and after Interlock override key to release , energises K1, directly energises K8.

II) Q9, Q1, and Q2 should open to energise K8.

Q8 interlock condition
To operate Q8 , Relay K9 should energise, in either 2 condtions:

I) Interlock override key to release , energises K1, directly energises K9.

II) Q9 Open, Q6 closed.Relays K27R, K27Y, K27B (VT voltage status) should de-energise, K49
(VT MCB status) should energise, K406 (VT fuse failure) should de-energise. Sometimes Status
of 13.8KV DS of transformer feeder is also considered.