You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12

KEY PLAN
MIA UNDERPASS

T20 @125 VERT OF 3 T20 HOR AT TOP


T20 @125mm T1 T20 @125mm T2
T16 @250X250 LINKS T20 @125mm T2 T16 @250X250 LINKS
T20 @125mm T2
℄MIA UNDERPASS T20 @125mm T1 T20 @125 VERT OF T20 @125 VERT IF
A T20 @125mm T1
T20 @150mm HOR OF T20 @150mm HOR IF
A
℄MIA UNDERPASS T20 @125mm T1
PRECAST SLAB T20 @125mm T2

T20 @125mm B2 T20 @100mm HOR OF


T20 @100mm HOR IF T20 @125mm B1 T20 @125mm B2 T20 @100mm HOR IF
T20 @125mm VERT IF T20 @125mm B2
T20 @125mm VERT IF T20 @125mm B1
T20 @125mm B1
T20 @100mm HOR OF
T20 @100mm HOR IF T20 @100mm HOR IF
T20 @100mm HOR OF COLUMN 500X500
T20 @100mm HOR OF
T20 @125mm VERT IF T20 @125mm VERT IF

T20 @125mm VERT OF


COLUMN 500X500
COLUMN 500X500
T20 @125mm VERT OF NOTES:
T20 @125mm VERT IF T20 @125mm VERT IF 1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS
STATED OTHERWISE. ALL DIMENSIONS TO BE VERIFIED ON SITE AND
B T20 @125mm VERT OF T20 @125mm VERT OF APPROVED BY THE ENGINEER. B
T20 @100mm HOR IF ADD'L T20 @100mm HOR IF ADD'L 2. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH RELEVANT
ARCHITECTURAL, MECHANICAL AND ELECTRICAL DRAWINGS AND ALL
T20 @125mm VERT IF ADD'L T20 @125mm VERT IF ADD'L RELEVANT SECTIONS OF THE SPECIFICATIONS.

3. MASS CONCRETE/SCREED SLOPES SHALL BE COORDINATED WITH MECHANICAL


DRAWINGS.

4. GROUND WATER TABLE SHALL BE MAINTAINED AT LEAST 500mm BELOW


FORMATION LEVEL TILL THE CONCRETE STRUCTURES OF THE ATTENUATION
TANK IS FULLY CONSTRUCTED.

5. PILES DESIGN WAS PERFORMED CONSIDERING THE LOADING EITHER FORM


THE CAR PARK OR THE WATER TREATMENT SYSTEM, SEPARATELY AND NOT
COMBINED.

01 6. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH DRAWINGS NO.


CDCBP-P2A-PIL-ST-1010 AND 1011.

1045 SECTION - 4 SUMP PIT 7. THE GEOTECHNICAL DATA USED IN THE DESIGN EXTRACTED FROM REPORT
300X300X150 CDCBP-P086-CP02A-JEC-RP-0003-01 AND IT ITS AMENDMENTS DATED 14-10-2020.
1 SCALE 1:75 01
C
SECTION - 5 01
LEGENDS: C
1045
1 SCALE 1:75 1045 SECTION - 9 T.O.F =TOP OF FOOTING
B.O.F =BOTTOM OF FOOTING
B.O.P =BOTTOM OF PILE
1 SCALE 1:75 2000 INDICATES SLAB THICKNESS

T20 @125 VERT OF 3 T20 HOR AT TOP GENERAL NOTES:


* ALL DIMENSIONS ARE IN MILLIMETERS.
* ALL LEVELS ARE IN METERS (m) .
* BARS CAN BE BUNDLED INLAPPING LOCATIONS TO AVOID CONJESTION
T20 @125 VERT OF T20 @125 VERT IF
T20 @125 VERT OF 3 T20 HOR AT TOP ℄MIA UNDERPASS -THE CONCRETE COVER FOR BOTTOM RFT 100 MM
T20 @150mm HOR OF T20 @150mm HOR IF
-THE CONCRETE COVER FOR SIDES 75 MM AND TOP RFT 50 MM
T20 @125mm T1
-THE CONCRETE COVER FOR COLUMNS ARE 50 MM
T20 @125 VERT OF T20 @125 VERT IF * BARS REINFORCEMENT NAMES : 22 T25-20-150 (T1)
T20 @150mm HOR OF T20 @150mm HOR IF NO. OF BARS
T20 @125mm T1
T20 @125mm T2 BAR DIA
PRECAST SLAB BAR MARK
D SPACING
D
BAR POSITION
T20 @125mm B2
T20 @100mm HOR IF
T20 @125mm B1
STRUCTURE IFC REFERENCE
CDCBP-P2A-PIL-ST-3001 (D02)
T20 @125mm B2 T20 @125mm VERT IF T20 @125mm VERT IF
T20 @100mm HOR OF T20 @125mm T2 CDCBP-P2A-PIL-ST-3200(D03)
T20 @125mm B1 T20 @100mm HOR IF T20 @100mm HOR IF
CDCBP-P2A-PIL-ST-3210 (D02)
T20 @100mm HOR IF T20 @100mm HOR OF T20 @100mm HOR OF CDCBP-P2A-PIL-ST-3211 (D02)
COLUMN 500X500
T20 @125mm VERT IF T20 @100mm HOR OF CDCBP-P2A-PIL-ST-3220(D03)
T20 @125mm VERT IF CDCBP-P2A-PIL-ST-3230 (D02)
T25 @125mm VERT OF T20 @125mm VERT IF
T25 @125mm VERT OF
T25 @125mm VERT OF
T20 @125mm VERT IF

T25 @125mm VERT OF


DRAW PIT
T20 @100mm HOR IF ADD'L 1480X1000X500 T20 @100mm HOR IF ADD'L
T20 @125mm VERT IF ADD'L T20 @125mm VERT IF ADD'L
E REV. E
DATE DESCRIPTION APPR.
NO.

Public Works Authority


P.O.Box 22188
Tel. : (0974) 44950000
Fax. : (0974) 44950999
www.ashghal.gov.qa Qatar Deserves The Best

PROJECT AFFAIRS
GENERAL ENGINEERING CONSULTANT
01 01

1045 SECTION - 6 1045 SECTION - 10 F


F 1 SCALE 1:75 1 SCALE 1:75

01 CONTRACTOR
T20 @125mm HOR AT TOP
1045 SECTION - 7
16 @250x250 16 @250x250 1 SCALE 1:75 * REFER MEP DRAWINGS FOR PIPE SLEEVE/OPENING
T20@125 T20@125 T32 @125mm VERT IF
℄MIA UNDERPASS AND DUCT LOCATIONS AND LEVELS
T20 @125mm HOR OF
T20@125 PROJECT
T20 @125mm HOR IF
T20 @125mm VERT OF
ALL REVISIONS ARE REVISED AS PER THE LATEST CENTRAL DOHA & CORNICHE
REVISION D03 OF STRUCTURAL IFC DRAWINGS
T20 @125mm VERT IF
BEAUTIFICATION PROJECT
T20 @100mm HOR IF T20@125 T20 @100mm HOR IF PACKAGE 2A
G T20 @100mm HOR OF G
T20 @100mm HOR OF PROJECT CODE PA 2019 C 113 G

T20 @125mm VERT IF T20 @125mm VERT IF TITLE


T20 @125mm VERT OF T20 @125mm VERT OF STRUCTURE MIA UNDERPASS
T20 @100mm HOR IF ADD'L
T20 @125mm VERT IF ADD'L
T20 @100mm HOR IF ADD'L
T20 @125mm VERT IF ADD'L
CITY SIDE ENTRANCE
WALL,ROOF SLAB & UPSTAND REINF.
SECTION A-A PHASE-1 (PART-2) SHEET 04 OF 04
SCALE 1:20

DESIGNED STATUS
I. MAKKEYAH DETAILED DESIGN

H CHECKED M. AHMED APPROVAL Z. EL-BALBISI H

02 01 DATE SEPTEMBER 2021 SCALE


1045 SECTION - 4A 1045 SECTION - 8 DWG. NO.
1:100
REV. NO.
1 SCALE 1:75
1 SCALE 1:75
CDCBP-P086-CP02A-JEC-SD-STR-1045
02
1 2 3 4 5 6 7 8 9 10 11 12