Professional Documents
Culture Documents
NTPC Limited
(A Govt. of India Enterprise)
~ IRammam
Ref. No. :Rammam 111/18-19/2 Date:11 thOctober 2018
To,
Joint Director,
Ministry of Environment & Forests,
NE Regional Office,
Shillong.
Sub: - Rammam Stage - III Hydro Power Project (120 MW) in West Bengal and
Sikkim - Environmental Clearance - Regarding.
Dear Sir,
With reference to environmental clearance obtained vide no. J-12011/42/2007-IA.I, dated: 1ih
August 2007; enclosed please find herewith six monthly compliance report from 01.04.2018 to
30.09.2018 for your information & necessary action please. It may please be noted that main
plant activities has been awarded and initial site work is in progress.
Thanking You,
Encl: As above
Copy to:
1. Director, MOEF (IA Division),Paryavaran Bhavan, CGO Complex, Lodi Road, New
Delhi - 110 003.
2. CCF-cum-Nodal Officer (FCA),Forest, Environment & WM Department,
Forest secretariat, Deorali, Gangtok- 737102
3. Conservator of Forests,LU & E Circle,FE & WM Department,
Forest Secretariat, Deorali, Gangtok -737102
4. The Principal Chief Conservator of Forests, West Bengal, Aranya Bhawan, LA - lOA
, Sector - III, 4th to 6th floor, Salt Lake City, Kolkata - 98, Ph - 2335-8581
5. HOP Ramrnam- for Kind information
Regd. Office: NTPC Bhawan, SCOPE Complex, 7, Institutional Area, Lodhi Road, New Delhi-I l 0003
Website: www.ntpc.co.in CIN - L40101DL1975GO/o07966
NTPC Limited
(Govt. of India Enterprise)
Rammam Stage -11/ HPP
(Page.Z)
(ii) Considering the landslide prone area, Due care is being taken during
tunnelling!road construction should be tunnelling/construction of project road. Expert
done with great care under close agency CIMFR (Central Institute of Mining and
supervision. Fuel Research) has been engaged by both the
Major Civil Contractors, as a part of their
contractual obligation, for design of blast
pattern and monitoring of tunnelling works.
Another expert agency, Geological Survey of
India (GSI), is also associated with NTPC,
Rammam, vide MoU dated 8th Feb' 2015, for
supervision and advice on tunnelling! road
construction andl or any other vulnerable area
of construction.
(iii) The construction activities would All care is being taken to remove the suspended
require a crusher to crush large lumps of solids from crusher effluent before allowing it
rock to the requisite site of coarse as to enter into natural streaml river. The Crusher
well as fine aggregates. The effluent Plant Effluent is passed through Settling Tank
generated from these crushers will have and only the sediment free water is allowed to
high suspended solids. The effluents enter the natural stream.
need to be treated before disposal.
Settling tank of appropriate size for
treatment of effluent from various
crushers should be provided.
(iv) A mmimum flow of 1 cumec shall Minimum flow of 1 cumec shall be allowed
always be released from the barrage. during operational stage of the project.
The minimum flow to be released is At present, during the construction stage, no
about 22% of the minimum flow of 4.47 impoundingl stoppage of river water flow is
cumec recorded in river. being done. The river has been diverted through
diversion channel to facilitate the construction
of Barrage.
(v) All the equipment which is likely to The utmost care is being taken at site. Silent
generate high noise levels are to be fully Generator is being used to reduce noise level.
modified (noise reduction measure). All reports for Noise level are within normal
limits.
(vi) Clearance from national committee of Seismic study has been conducted by lIT
Seismic Design parameters (NCSDP) of Roorkee. The suggested Earth Quake (EQ)
CWC should be obtained. design parameters have been cleared from
National Committee of Seismic Design
Parameters (NCSDP) of CWC and are being
adopted for design of the project components.
(Report already submitted to MOEF, Shillong
through e-mail in May 2011) (Ref. Compliance
Report submitted vide NHLlRammamIII/11-
12/01 dated 9th May 2011).
(vii) Total 216 families from nine villages One time settlement for R&R package to
will be affected. The affected families affected PAPs has been agreed during VDAC
should be rehabilitated as per NPRR- meeting as per R&R policy. Total of Rs. 3.35
2003. crores disbursed as per R&R policy till
30.09.2018.
Regd. Office: NTPC Bhawan, SCOPE Complex, 7, Institutional Area, Lodhi Road, New Delhi-Tl 0003
WebSite: www.ntpc.co.in CIN - L401OlDL1975GO/o07966
NTPC Limited
(Govt. of India Enterprise)
Rammam Stage -1/1 HPP
(Page.B]
(viii) All the assurance/commitments given by Being implemented.
project authority in the Public hearing
must be implemented in letter and spirit.
(ix) The Singalila National Park is located at The cost for Wildlife Conservation plan as
a distance of 5 km from the project site. proposed in EMP have been submitted to the
The wild life conservation plan office ofPCCF, Govt. ofW.B. as part of the
proposed for protection of wild life in CAT Plan vide Letter NO.NHU10/Rammam-
protected area on page 155 of EMP, 111/34 dated 17/5/2010.
should be followed in too.
(x) The implementation of fish management The matter has been taken up with fisheries
plan including construction of a department, Govt. of West Bengal as well as
hatchery should be carried out In with the Fisheries Department of Sikkim.
consultation with the fisheries West Bengal Fisheries Department officers re-
department, state Govt-.of West Bengal visited site On 22/3/2017. Comprehensive Fish
and submitted to MoEF within three Management Plan is awaited from Govt. of
month from date of issue of this letter. W.B.
(xi) Any other clearance from any other Other relevant clearances have been obtained.
organisation if required should be
obtained.
Part-B: General Conditions:
(i) Adequate free fuel arrangement should be LPG gas is being used for officers & staff
made for the labour force engaged in the engaged in the construction work.
construction work at project cost so that Around 400 labours are engaged III the
indiscriminate felling of trees is Project works out of which about 200 labours
prevented. are local residents.' Adequate fuel for labour
camp (30 LPG cylinders, Kerosene, etc) is
provided by the contractor.
(ii) Environment clearance IS subjected to Wildlife clearance has been obtained from
obtaining clearing under the wildlife Directorate of Forest, Govt. of W.B. vide
(Protection) Act, 1972 from the competent letter No. 352IWL/2W-59 1107 dated
authority. 1/2/2008. (Submitted through e-mail to
MOEF &CC, Shillong).
(iii) Fuel depot may be opened at the site to Available fuel depot at Jorethang (South
provide the fuel (kerosene / wood / LPG). Sikkim) is within accessible reach from site.
Medical facilities as well as recreation Medical! First Aid facilities along with
facilities should also be provided to the Ambulance are available at all the working
labourers. sites for 24x7 for providing medical
assistance in case any accident at site during
construction.
Indoor gaming facilities, reading rooms and
Colour Television have been provided by the
agencies in the Labour Camps, Staff Rooms
for recreation of labour force. 4
Regd. Office: NTPC Bhawan, SCOPE Complex, 7, Institutional Area, Lodhi Road, New Delhi-I I 0003
Website: www.ntpc.co.in CIN - L401OIDLI975GO/o07966
NTPC Limited
(Govt. of India Enterprise)
Rammam Stage - /II HPP
(Page.a)
(iv) All the labourers to be engaged for Thorough health check-up of all labour is
construction works should be thoroughly done before issuing the work permit. In
examined by health personnel and addition to this, Doctor is available on
adequately treated before issuing them permanent! weekly basis at Power Housel
work permit. Barrage site respectively.
(v) Restoration of construction area including Dumping sites are already identified for muck
dumping site of excavated materials disposal. Landscaping & plantation shall be
should be ensured by levelling, filling up done subsequently.
of borrow pits, landscaping etc. The area
should be properly treated with suitable
plantation.
(vi) Financial provision should be made in the Financial provision of Rs. 20.14 Crores has
total budget of the project for kept for Environment & Ecology in the
implementation of the above suggested Investment Approval of the Project.
safeguard measures.
(vii) A monitoring committee for R&R should VDAC (Village Development Advisory
be constituted which must include committee) for monitoring R&R activities
representatives of project-affected person have been constituted by DM of concerned
from a woman beneficiary. districts which include representatives of
Project Affected Persons.
(viii) A multidisciplinary committee m Multidisciplinary Committee for Sikkim has
consultation with the Ministry should be been formed vide Notification No.
constituted with Ecologists, 10IFEWMD/2007 dt. 30106/20080f the Govt.
of Sikkim. The Committee has visited site in
Environmental scientists, conservationists
September 2016.
and experienced administrators etc. To
oversee the effective implementation of
the suggested safeguard measures.
Regd. Office: NTPC Bhawan, SCOPE Complex, 7, Institutional Area, Lodhi Road, New Delbi-Tl 0003
Website: www.ntpc.co.in CIN - L40I0IDL1975GOlO07966
NTPC Limited
(...
~II. "'."'
....
N'rPC·· ·.fI. )
(Govt. of India Enterprise)
Rammam Stage - 11/ HPP
(Page:S)
6 In case of change in the scope of the project, Noted and the same shall be obtained, if
project would require a fresh appraisal. required.
Regd. Office: NTPC Bhawan, SCOPE Complex, 7, Institutional Area, Lodhi Road, New Delhi-I l 0003
Website: www.ntpc.co.in CIN - L40101DL197SGO/o07966