You are on page 1of 1

Information Management System

Request for Information

RFI #: Status: Interface: Required Date:

157 Requester Review [PL3.02] LOT 3 - SPREAD 6 30-Sep-2015


Requesting Party: Responsible Party:
Serap Pehlivan [Engineer 1] [LOT 3 Pipeline Construction Contractor] David Bentley [NDT Specialist] [EPCM Materials]
For Information Only:

Title: Request for NDT (only RT) Acceptance for PQR Joints

Description:

Due to current issues with spiral welded pipe & ultrasonic testing, Contractor requests that NDT acceptance of PQR joints for only
Radiography testing

Please kindly confırm the acceptance of NDT(RT) for PQR Joints


Response:

RT is accepted as the main inspection method for PQR during the period of re qualification of AUT and manufacture of relevant calibration
blocks.

Once the AUT and blocks are available , AUT will then be additionally required as normal.
Attachments:

Comments:

Workflow Log:

RFI #157 was responded directly by LOT Management. [David Morgan] [30-Sep-2015]

Responsible Party has changed from [] to David Bentley [NDT Specialist] [David Morgan] [30-Sep-2015]

RFI #157 was approved by Requesting Party IC [Ayse Sonmez Taftali] [29-Sep-2015]

RFI submitted. [Serap Pehlivan] [29-Sep-2015]