Title: Request for NDT (only RT) Acceptance for PQR Joints
Description:
Due to current issues with spiral welded pipe & ultrasonic testing, Contractor requests that NDT acceptance of PQR joints for only
Radiography testing
RT is accepted as the main inspection method for PQR during the period of re qualification of AUT and manufacture of relevant calibration
blocks.
Once the AUT and blocks are available , AUT will then be additionally required as normal.
Attachments:
Comments:
Workflow Log:
RFI #157 was responded directly by LOT Management. [David Morgan] [30-Sep-2015]
Responsible Party has changed from [] to David Bentley [NDT Specialist] [David Morgan] [30-Sep-2015]