Materials Supply rate Currency Unit

1 Supply of temporary fencing 80.00 AED per m


2 Supply of imported backfilling sand 40.00 AED per m3
3 Supply of concrete 20/20 190.00 AED per m3
4 Supply of concrete 40/20 205.00 AED per m3
5 Temprature control 15.00 AED per m3
6 Concrete pump charges 15.00 AED per m3
7 Sypply of reiforcement steel 2,800.00 AED per ton
8 Solid block 200 mm thk 3.00 AED per piece
9 Hollow block 100 mm thk 1.50 AED per piece
10 Hollow block 200 mm thk 1.90 AED per piece
11 Hollow block 250 mm thk 2.40 AED per piece
12 Hollow block 300 mm thk 3.00 AED per piece
13 Thermal block 200 mm thk 3.50 AED per piece
14 Thermal block 250 mm thk 4.50 AED per piece
15 Thermal block 300 mm thk 5.50 AED per piece
16 Cement sand mortar (including water & mixing) 170.00 AED per m3
17 Flooring type F01 50.00 AED per m2
18 Flooring type F02 100.00 AED per m2
19 Flooring type F03 150.00 AED per m2
20 Flooring type F05 35.00 AED per m2
21 Flooring type F06 35.00 AED per m2
22 Staircase landing 150.00 AED per m2
23 Thresholds 150.00 AED per m
24 External steps 100.00 AED per m
25 Family room steps 150.00 AED per m
26 Staircase straight steps 150.00 AED per m
27 Staircase circular steps 300.00 AED per m
28 Filling white sand mixed with cement 80.00 AED per m3
29 Plaster rush coat materials 3.00 AED per m2
30 Interlocking tiles 25.00 AED per m2
31 Black sand 65.00 AED per m3
32 Water tanker 5,000 Galon 500.00 AED per tanker
33 Water tanker 10,000 Galon 900.00 AED per tanker
34 Aggregate 20 mm 3/4" 60.00 AED per m3
35 Water stopper 16.00 AED per m
36 Marine plywood 80.00 AED per no.
37 White wood 950.00 AED per m3
38 AAC block 145.00 AED per m3
Project Name
Location

Sr. Item description Unit Qty Rate Amount

Bill # (1) Preliminaries

Temporary site hording m 143.00 100.00 14,300.00

Project signboard nos. 1.00 5,000.00 5,000.00

Site office nos. 1.00 15,000.00 15,000.00

Temporary services months 14.00 1,500.00 21,000.00

Material sample and shop drawings LS 1.00 10,000.00 10,000.00

Site housekeeping and cleaning months 14.00 1,000.00 14,000.00

Site supervision months 14.00 5,000.00 70,000.00

Total Page 1 AED 149,300.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Bill # (1) Preliminaries (Cont'd)

Additional Items
Project Name
Location

Sr. Item description Unit Qty Rate Amount

Total Page 2 AED 0.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Bill # (1) Preliminaries (Cont'd)

Summary

Page (1) 149,300.00

Page (2) 0.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Total Page 3 AED 149,300.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Bill # (2) Earth Works

Excavation m3 633.00 15.00 9,495.00

Backfilling with selected excavated materials m3 633.00 15.00 9,495.00

Backfilling with imported filling materials m3 44.00 80.00 3,520.00

Anti termite treatment m2 988.00 3.00 2,964.00

Total Page 1 AED 25,474.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Bill # (2) Earth Works (Cont'd)

Additional Items
Project Name
Location

Sr. Item description Unit Qty Rate Amount

Total Page 2 AED 0.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Bill # (2) Earth Works (Cont'd)

Summary

Page (1) 25,474.00

Page (2) 0.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Total Page 3 AED 25,474.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Bill # (3) Concrete Works

Substructure

Plain cement concrete

50 mm thk m2 414.00 25.00 10,350.00

100 mm thk m2 353.00 45.00 15,885.00

Reinforced concrete

RC strip footing m3 83.00 1,100.00 91,300.00

RC foundation beams m3 34.00 1,150.00 39,100.00

RC plinth walls m3 35.00 1,150.00 40,250.00

RC ground beams m3 15.00 1,150.00 17,250.00

RC slab on grade m3 42.00 800.00 33,600.00

RC external steps m3 3.00 800.00 2,400.00

RC neck columns m3 7.00 1,200.00 8,400.00

Super structure

RC drop beams m3 41.00 1,150.00 47,150.00

RC slabs m3 274.00 1,100.00 301,400.00

RC staircase m3 9.00 1,100.00 9,900.00

RC parapets m3 46.00 1,100.00 50,600.00

RC columns m3 37.00 1,250.00 46,250.00

Total Page 1 AED 713,835.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Bill # (3) Concrete Works (Cont'd)

Additional Items
Project Name
Location

Sr. Item description Unit Qty Rate Amount

Total Page 2 AED 0.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Bill # (3) Concrete Works (Cont'd)

Summary

Page (1) 713,835.00

Page (2) 0.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Total Page 3 AED 713,835.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Bill # (3) Concrete Works

Substructure

Plain cement concrete

50 mm thk m2 414.00 25.00 10,350.00


100 mm thk m2 353.00 45.00 15,885.00

Reinforced concrete

RC strip footing m3 83.00 1,100.00 91,300.00


RC foundation beams m3 34.00 1,150.00 39,100.00
RC plinth walls m 3
35.00 1,150.00 40,250.00
RC ground beams m3 15.00 1,150.00 17,250.00
RC slab on grade m 3
42.00 800.00 33,600.00
RC external steps m3 3.00 800.00 2,400.00
RC neck columns m 3
7.00 1,200.00 8,400.00

Sreel reinforcement

RC strip footing kg 8,300.00 0.00


RC foundation beams kg 4,250.00 0.00
RC plinth walls kg 5,250.00 0.00
RC ground beams kg 1,875.00 0.00
RC slab on grade kg 3,360.00 0.00
RC external steps kg 240.00 0.00
RC neck columns kg 1,400.00 0.00

Form work

RC strip footing m2 106.00 0.00


RC foundation beams m2 0.00
RC plinth walls m 2
0.00
RC ground beams m2 287.00 0.00
RC slab on grade m 2
0.00
RC external steps m2 0.00
RC neck columns m 2
0.00
Project Name
Location

Sr. Item description Unit Qty Rate Amount

Total Page 1 AED 258,535.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Bill # (3) Concrete Works (Cont'd)

Super structure

RC drop beams m3 41.00 1,150.00 47,150.00


RC slabs m 3
274.00 1,100.00 301,400.00
RC staircase m3 9.00 1,100.00 9,900.00
RC parapets m 3
46.00 1,100.00 50,600.00
RC columns m3 37.00 1,250.00 46,250.00

Sreel reinforcement

RC drop beams kg 5,125.00 0.00


RC slabs kg 34,250.00 0.00
RC staircase kg 900.00 0.00
RC parapets kg 4,600.00 0.00
RC columns kg 7,400.00 0.00

Form work

RC drop beams m2 453.00 0.00


RC slabs m2 917.00 0.00
RC staircase m2 0.00
RC parapets m2 0.00
RC columns m2 0.00
Project Name
Location

Sr. Item description Unit Qty Rate Amount

Total Page 2 AED 455,300.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Bill # (3) Concrete Works (Cont'd)

Summary

Page (1) 258,535.00

Page (2) 455,300.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Total Page 3 AED 713,835.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Bill # (4) Block Works

Solid block

200 mm thk m2 14.00 100.00 1,400.00

Thermal block

200 mm thk m2 789.00 130.00 102,570.00

Hollow block

100 mm thk m2 131.00 80.00 10,480.00

200 mm thk m2 605.00 90.00 54,450.00

300 mm thk m2 46.00 100.00 4,600.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Total Page 1 AED 173,500.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Bill # (4) Block Works (Cont'd)

Additional Items
Project Name
Location

Sr. Item description Unit Qty Rate Amount

Total Page 2 AED 0.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Bill # (4) Block Works (Cont'd)

Summary

Page (1) 173,500.00

Page (2) 0.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Total Page 3 AED 173,500.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Bill # (5) Joinery Works

Vanity counters

a Vanity counters m 8.00 1,500.00 12,000.00

Wardrobes

b Wardrobes m2 89.00 1,000.00 89,000.00

Kitchen Cabinets

c Base units m 16.00 1,500.00 24,000.00

d Wall units m 15.00 1,000.00 15,000.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Total Page 1 AED 140,000.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Bill # (5) Joinery Works (Cont'd)

Additional Items
Project Name
Location

Sr. Item description Unit Qty Rate Amount

Total Page 2 AED 0.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Bill # (5) Joinery Works (Cont'd)

Summary

Page (1) 140,000.00

Page (2) 0.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Total Page 3 AED 140,000.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Bill # (6) Metal Works

Staircase handrail

a Floor mounted m 27.00 800.00 21,600.00

b Wall mounted m 21.00 500.00 10,500.00

Balcony handrail

c Floor mounted m 10.00 800.00 8,000.00

Access ladders

d To top roof nos. 1.00 2,500.00 2,500.00

e To electrical room roof nos. 1.00 2,000.00 2,000.00

Total Page 1 AED 44,600.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Bill # (6) Metal Works (Cont'd)

Additional Items

Total Page 2 AED 0.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Bill # (6) Metal Works (Cont'd)

Summary

Page (1) 44,600.00

Page (2) 0.00

Total Page 3 AED 44,600.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Bill # (7) Thermal & Moisture Protection

Substructure waterproofing
a betumine painting m2 1,668.00 15.00 25,020.00

Wet area waterproofing


b Horizontal m2 123.00 35.00 4,305.00
c Vertical, 300 mm height m 158.00 12.00 1,896.00

Roof thermal insulation and waterproofing


Combo roofing m2 455.00 125.00 56,875.00

Total Page 1 AED 88,096.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Bill # (7) Thermal & Moisture Protection (Cont'd)

Additional Items

Total Page 2 AED 0.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Bill # (7) Thermal & Moisture Protection (Cont'd)

Summary

Page (1) 88,096.00

Page (2) 0.00

Total Page 3 AED 88,096.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Bill # (8) Doors & Windows

Wooden Doors
a Wooden door type D01, size 1.80 x 2.30 m nos. 2.00 5,000.00 10,000.00
b Wooden door type D02, size 1.30 x 2.20 m nos. 3.00 1,500.00 4,500.00
c Wooden door type D03, size 1.00 x 2.20 m nos. 11.00 1,500.00 16,500.00
d Wooden door type D04, size 0.80 x 2.20 m nos. 9.00 1,500.00 13,500.00

Sliding Doors
e Sliding door type SD01, size 1.50 x 2.20 m nos. 1.00 3,500.00 3,500.00

Archs
f Arch type ARCH01, size 1.20 x 2.50 m nos. 2.00 1,500.00 3,000.00
g Arch type ARCH02, size 1.00 x 2.50 m nos. 5.00 1,500.00 7,500.00

Aluminum Doors
h Aluminum door type AD01, size 1.00 x 2.20 m nos. 3.00 2,200.00 6,600.00

Aluminum Louver Doors


i Aluminum louver door type AL01, size 0.80 x 2.20 m nos. 1.00 2,000.00 2,000.00

Aluminum Windows
j Aluminum window type W01, size 2.90 x 2.10 m nos. 2.00 6,090.00 12,180.00
k Aluminum window type W02, size 2.00 x 2.10 m nos. 11.00 4,200.00 46,200.00
l Aluminum window type W03, size 1.20 x 2.10 m nos. 2.00 2,520.00 5,040.00
m Aluminum window type W04, size 0.60 x 1.10 m nos. 12.00 660.00 7,920.00
n Aluminum window type W05, size 1.20 x 1.50 m nos. 2.00 1,800.00 3,600.00
o Aluminum window type W06, size 1.00 x 1.50 m nos. 1.00 1,500.00 1,500.00
p Aluminum window type W07, size 1.30 x 1.50 m nos. 2.00 1,950.00 3,900.00
q Aluminum window type W08, size 2.40 x 2.60 m nos. 3.00 6,240.00 18,720.00
r Aluminum window type W09, size 1.50 x 2.10 m nos. 1.00 3,150.00 3,150.00
s Aluminum window type W10, size 1.50 x 4.20 m nos. 1.00 6,300.00 6,300.00
Project Name
Location

Sr. Item description Unit Qty Rate Amount

Total Page 1 AED 175,610.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Bill # (8) Doors & Windows (Cont'd)

Additional Items

Total Page 2 AED 0.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Bill # (8) Doors & Windows (Cont'd)

Summary

Page (1) 175,610.00

Page (2) 0.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Total Page 3 AED 175,610.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Bill # (9) Finishes

Flooring
Flooring type F01 m2 296.00 100.00 29,600.00
Flooring type F02 m2 36.00 100.00 3,600.00
Flooring type F03 m2 365.00 100.00 36,500.00
Flooring type F05 m2 455.00 80.00 36,400.00
Flooring type F06 m2 134.00 100.00 13,400.00
Staircase landing m2 4.00 250.00 1,000.00

Thresholds
Thresholds, various width m 39.00 150.00 5,850.00

External steps
External steps m 36.00 200.00 7,200.00

Internal steps and staircase


Family room steps m 21.00 250.00 5,250.00
Staircase straight steps m 34.00 250.00 8,500.00
Staircase circular steps m 40.00 300.00 12,000.00

Skirting
Skirting type S01 m 218.00 35.00 7,630.00
Skirting type S02 m 202.00 35.00 7,070.00
Skirting type S05 m 151.00 30.00 4,530.00
Staircase skirting m 21.00 45.00 945.00

Ceiling
Ceiling spray plaster m2 737.00 25.00 18,425.00
Ceiling emulsion paint C01 m2 737.00 25.00 18,425.00
Aluminum false ceiling 60 x 60 cm m2 134.00 135.00 18,090.00
Atifungus paint above suspended ceiling m2 134.00 15.00 2,010.00

Walls
Wall plaster m2 2,194.00 35.00 76,790.00
Wall emulsion painting W01 m 2
1,517.00 25.00 37,925.00
Wall tiles W02 m2 557.00 100.00 55,700.00
Wall oil painting W03 m 2
120.00 25.00 3,000.00
Project Name
Location

Sr. Item description Unit Qty Rate Amount

Total Page 1 AED 409,840.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Bill # (9) Finishes (Cont'd)

Elevations

Stone cladding for elevations


Stone cladding for elevations m2 787.00 250.00 196,750.00

Elevation plaster
Elevation plaster m2 278.00 55.00 15,290.00

Elevation painting
Elevation painting m2 412.00 35.00 14,420.00

Elevation decorative elements

Decoration GRC around the windows


For W01 nos. 2.00
For W02 nos. 11.00
For W03 nos. 2.00
For W04 nos. 12.00
For W05 nos. 2.00 25,000.00
For W06 nos. 1.00
For W07 nos. 2.00
For W08 nos. 3.00
For W09 nos. 1.00
For W10 nos. 1.00

Decorative GRC parapets


For roof parapet m 101.00 300.00 30,300.00
For top roof parapet m 23.00 150.00 3,450.00
Project Name
Location

Sr. Item description Unit Qty Rate Amount

Total Page 2 AED 285,210.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Bill # (9) Finishes (Cont'd)

Summary

Page (1) 409,840.00

Page (2) 285,210.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Total Page 3 AED 695,050.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Bill # (10) Accessories

Shower partitions

a Shower partitions m2 16.00 800.00 12,800.00

Total Page 1 AED 12,800.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Bill # (10) Accessories (Cont'd)

Additional Items

Total Page 2 AED 0.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Bill # (10) Accessories (Cont'd)

Summary

Page (1) 12,800.00

Page (2) 0.00

Total Page 3 AED 12,800.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Bill # (11) External Works

Shower partitions

a Interlocking tiles 60 mm thk m2 428.00 65.00 27,820.00

b Interlocking tiles 80 mm thk m2 114.00 75.00 8,550.00

c Curbstone m 23.00 60.00 1,380.00

d Car gate 4.00 x 2.90 m (including motor) nos. 1.00 18,120.00 18,120.00

e Pedistrian gate 1.50 x 3.00 m nos. 1.00 3,150.00 3,150.00

f Car parking shade nos. 1.00 7,500.00 7,500.00

g Boundary wall m 124.00 1,000.00 124,000.00

Total Page 1 AED 190,520.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Bill # (11) External Works (Cont'd)

Additional Items

Total Page 2 AED 0.00


Project Name
Location

Sr. Item description Unit Qty Rate Amount

Bill # (11) External Works (Cont'd)

Summary

Page (1) 190,520.00

Page (2) 0.00

Total Page 3 AED 190,520.00


Project Name
Location

Project summary:

Bill # BOQ Division Amount

Bill 1 Preliminaries 149,300.00

Bill 2 Earth Works 25,474.00

Bill 3 Concrete Works 713,835.00

Bill 4 Block Works 173,500.00

Bill 5 Joinery Works 140,000.00

Bill 6 Metal Works 44,600.00

Bill 7 Thermal & Moisture Protection 88,096.00

Bill 8 Doors & Windows 175,610.00

Bill 9 Finishes 695,050.00

Bill 10 Accessories 12,800.00

Bill 11 External Works 190,520.00

Bill 12

Bill 13

Total amount 2,408,785.00