ALFIL MILLERS LIMITED

DECEMBER 2019
MONTHLY OPERATIONS &
MAINTENANCE REPORT
Monthly Report of Operations and Maintenance
For Alfil millers for both mill A and B For the Month of
December 2019

January 6TH, 2020

GENERAL MANAGER

ALFIL MILLERS LTD

Dear Sir:

The maintenance team is pleased to present the attached Monthly report. Included is a detailed
report of operation and maintenance of both Mill A, Mill B and motor vehicle for the month of
December 2019. The maintenance team welcomes any comments or questions on this report.

Sincerely,

Maintenance team

Executive Summary
During last month (December), we experienced minor break downs on dampening machine,
bucket elevators and one Air-locker for B1 /B2 which were all rectified. We installed rubber
hummers on two bran finishers & micro dozer and scourer sieves on their respective frames.
The rest of the maintenance work has been preventive, corrective and daily mill routine work.
On motor vehicle side, we have carried out breakdown maintenance on several trucks majority
of which had brake systems faults. The maintenance team members also engage in daily
production activities during day and night production shifts respectively including daily and
weekly maintenance programs.

Break down maintenance done at mill B


Machine illustration Brief explanation
Dampener We installed two water
rubber seals fabricated
2-rubber at factory workshop to
seals stop water from leaking
fabricated at out of the dampener.
factory We also replaced old
workshop bearing and cleaned the
dampener thoroughly
well.

Bucket Last month we replaced


elevators many broken cups on 3
Broken bucket elevators that
elevator cups we checked. We found
out that elevators with
metallic cups were
severely affected due to
mostly rusting and
weakening and
consequentially
breaking down.
So we replaced metallic
Broken cups with plastic ones at
metallic only points where they
cups were exposed to water.
replaced On others, we replaced
with plastics with new metallic and
ones tighten the loose bolts
and nuts.
Checking and greasing
of elevators boots, this
was started last month
and few were done, and
by the end of this
month (JAN 2020) we
shall be thru.

Scourer for We installed two new


2nd cleaning scouring screens on
stage their respective frames
and installed back on
scouring machine.

Air locker for This was the second


sifter time the same air locker
compartmen Air locker failing to turn. It was
t B1/B2 during
removed and serviced
but this time we
service
repositioned it with
another air locker from
another position.

Roller R1 We dismantled roller R1


in mill A after complete
breakdown and we wait
till new roller brought
for assembly
Other maintenance work include;
 Renovation of compressor station and installation of electric generator

 Initiating the construction of wooden tool box for storing company tools

 Re-organizing of workshop stores


 Repairing of company wheel barrows
Corrective maintenance at mill B

Machine illustration Brief explanation

Bran We installed rubber


finisher hummers on two bran
and micro finishers to prevent
dozer the frequent chocking
of screened flour.

This was installed to


agitate the fortificants
at intervals so that it
Rubber can flow continuously.
hummer on
micro dozer
Preventive maintenance done at Mill B
We carried out daily, weekly and monthly prevent maintenance on mill B during the last month
(December), as follows;

1. Daily maintenance included blowing of mill B, draining of condensed vapor from


compressor and daily inspection of mill equipments during production to identify and
rectify any fault before intensification.
2. Weekly maintenance done in December includes;
 Cleaning of magnets in both mills
 Thorough Cleaning of intakes for both mill A and B
 Cleaning of air filters on blowers
 Cleaning of inspection glasses for rollers since these are mainly affected by
moisture.
 Cleaning dampening machine to remove rotten grain
 Blowing of low pressure fans inside mill B to avoid excessive vibrations that may
damage electric motor bearings
3. Other maintenance work done last month include;
 Clearing of water from intake of mill A, since last month has been rainy season,
water from underground raises above the intakes’ level and penetrates into the
intake.
 Maintenance of intake screw conveyor at mill B
 Clearing chocked elevators
 Sealing of water leakages on mill roofs, and clearing of debris from gutters
 Emptying choked cyclones and pipes
 Tightening of loose bolts on all equipments respectively such as vibrating motors
 Blowing inside mill B to remove all the cobwebs from the walls

Note

This month January 2020 we are starting general greasing of Mill B


Motor vehicle maintenance for the month of December

Vehicle NO_ Illustration Operation


UBB 866W Installing of new brake pads
Benz truck on four brake disks, 2 new
brake disks and Replacing Air
filter and fan belt,

UAW 603V Installing of new spare parts;


Super custom upper suspension plate both
right and left, tie rod ends,
lower ball joint both right and
left, new tyre and rim,
dumpers both right and left,
steering shaft, wheel
alignment and repairing
stabilizer clamps for rear axle.

UAH 866Y Servicing of cabin jack


UAW 758D Replacing of broken centre
Fuso Fighter bolt for lift spring
UAM 813Y Servicing of radiator,
replacing radiator mounting
and compressor water
cooling pipe.
UAN 987G Replacing fuel pump and
Toyota premio servicing control circuit for
cooling fun

UAQ 475B Replacing of brake pads on all


Canter four wheels, servicing of one
brake drum, brake pistons
and installing new piston
rubbers
PERSONNEL

The maintenance team includes one motor vehicle & one maintenance mechanic, one welder
and two technical helpers. One technical helpers also work in production shift changeovers as
well. The team work hand in hand to deliver precise results. The team also works hand in hand
with productions team to ensure proper mill maintenance