GV01
Requisition No.
CONDENSATE TANK
Client PO :
DATA SHEET 1 of 2
Client Job No.
Page No.
Client GasVesubio Prepared OB
Plant LNG production plant Rev. Proc. RR
Unit Rev. Mech. OB
Document No. GV0001-267-00 Rev. Qlt.
Approved
Date 9/11/2017
Issue no. 0
Tag No.: 26-V8000 P&ID No.: GV0001-110-26 Issued for: RFQ
# row Rev. PARAMETER UNIT
1 Location : Bajo Alto, Provincia de El Oro, Ecuador
2 Absolute Coordinates : -3.121129, -79.865637
3 Elevation : Sea Level
4 MIN ºC 18
Ambient temperature
5 MAX ºC 37
6 MIN mbar (a) 980
Ambient Pressure
7 MAX mbar (a) 1020
8 MIN % 10
Relative Humidity
9 MAX % 90
10 Wet bulb temperature ºC 26,5
GENERAL DATA
11 MED m/s 4
12 Windspeed MAX m/s 10
13 MAX Str. Design km/h 80
14 Winter Prevailing Wind Direction NW
15 Summer Prevailing Wind Direction NW
16 Earthquake Zone Zone III according to UBC
17 Area Classification Zone 2, Gas Group IIa (Methane)
19
20 Condensate tank, complete with connections, instrumentation, manhole, according P&ID
Scope definition below. Scope includes valves and instrumentation installation, self-stand supports included.
21 See scope indication limit indicated in the P&ID detail.
25 m3
Volume
26 Dead min. m3 0.25
27 Min ºC 10
Temperature
28 Max ºC 35
29 Min bar (g) atm
Pressure
30 Max bar (g) 0,5
31 Specific Weight kg/m3 1
32 Vapor Pressure Pv bara 0.02
33 Viscosity mPa*s 0.9
# row Rev. PARAMETER UNIT
35 Orientation V/H Horizontal
36 Total Volume m3 5
37 Diameter m 1.00
38 Length / height m *
39 Length between tangent lines m *
40 Design pressure barg 1
41 Design temperature min / max °C -29 / 70
DESIGN DATA
42 Weight Empty kg *
43 Weight of Internals kg N/A
44 Weight Full kg *
45 Weight Filled with water kg *
46 Weight of Insulation kg N/A
47 Type of Support / Skirt Support on both ends (saddles)
48 Manhole required Y/N Yes
49 Lifting lugs Y/N 2x
50 Earthing 2x
51 Headroom Clearance m N/A
52 Design Life yr 20
# row Rev. PARAMETER UNIT
53 Design Code ASME BPV Sect. VIII, Div 1
54 U-Stamp Required No
CODE REQUIREMENTS
55 PED Applicable No
56 Wind speed km/h 80
57 Earthquake Zone III acc. UBC
58 Snow N/A
59 Corossion Alowance Shell / Heads mm 1.6
60 Corossion Alowance Nozzles mm 1.6
61 Joint Efficiency - 0.7
62 Test pressure % Acc. Code (1.3 bar)
63 Radiographic Examination % None
64 Material Certificates % 100%, pressure retaining parts
Project No. GV01
Requisition No.
CONDENSATE TANK
Client PO :
DATA SHEET 2 of 2
Client Job No.
Page No.
Client GasVesubio Prepared OB
Plant LNG production plant Rev. Proc. RR
Unit Rev. Mech. OB
Document No. GV0001-267-00 Rev. Qlt.
Approved
Date 9/11/2017
Issue no. 0
Tag No.: 26-V8000 P&ID No.: GV0001-110-26 Issued for: RFQ
# row Rev. PARAMETER
65 Heads ( + shape) A516 Gr. 60
66 Shell A516 Gr. 60
67 Stiffening rings N/A
68 Supports / Skirt S235JRG2
69 Nozzles A 106 B
70 Flanges A 105
MATERIALS
98
99
100
101
102
TANK P&ID
103
104
105
106
107
108
109
110
111
112
# row Rev. PARAMETER
113 Inspection Authority None
114 General Arrangement Drawing Required For Approval, before start of production
INSPECTION, TESTING,
115 Lifting Lugs Drawing Required For Approval, before start of production
116 Mechanical Calculations Required for Approval before start of production
DOCUMENTS
drawings. Furthermore, the manufacturer is responsible for ensuring that the design is satisfactory for the design conditions indicated on the requisition and/or
drawings. Calculations and thickness of material supplied to the manufacturer are for information and tendering purposes only. The manufacturer shall make
his own calculations for which he is fully responsible. The manufacturer shall ensure that the supply conforms to all applicable codes and regulations and he
shall obtain all necessary approvals from statutory authorities.