You are on page 1of 2

Project No.

GV01
Requisition No.
CONDENSATE TANK
Client PO :
DATA SHEET 1 of 2
Client Job No.
Page No.
Client GasVesubio Prepared OB
Plant LNG production plant Rev. Proc. RR
Unit Rev. Mech. OB
Document No. GV0001-267-00 Rev. Qlt.
Approved
Date 9/11/2017
Issue no. 0
Tag No.: 26-V8000 P&ID No.: GV0001-110-26 Issued for: RFQ
# row Rev. PARAMETER UNIT
1 Location : Bajo Alto, Provincia de El Oro, Ecuador
2 Absolute Coordinates : -3.121129, -79.865637
3 Elevation : Sea Level
4 MIN ºC 18
Ambient temperature
5 MAX ºC 37
6 MIN mbar (a) 980
Ambient Pressure
7 MAX mbar (a) 1020
8 MIN % 10
Relative Humidity
9 MAX % 90
10 Wet bulb temperature ºC 26,5
GENERAL DATA

11 MED m/s 4
12 Windspeed MAX m/s 10
13 MAX Str. Design km/h 80
14 Winter Prevailing Wind Direction NW
15 Summer Prevailing Wind Direction NW
16 Earthquake Zone Zone III according to UBC
17 Area Classification Zone 2, Gas Group IIa (Methane)

18 Special issues Close to Sea (vendor to inform special precautions to be observed)

19
20 Condensate tank, complete with connections, instrumentation, manhole, according P&ID
Scope definition below. Scope includes valves and instrumentation installation, self-stand supports included.
21 See scope indication limit indicated in the P&ID detail.

22 Guarantee Guarantee defects to be corrected on site at supplier expenses.


23 Type of vessel Atmospheric Vessel
# row Rev. PARAMETER UNIT
24 Fluid Condensate
Operating min. 5
SERVICE CONDITIONS

25 m3
Volume
26 Dead min. m3 0.25
27 Min ºC 10
Temperature
28 Max ºC 35
29 Min bar (g) atm
Pressure
30 Max bar (g) 0,5
31 Specific Weight kg/m3 1
32 Vapor Pressure Pv bara 0.02
33 Viscosity mPa*s 0.9
# row Rev. PARAMETER UNIT
35 Orientation V/H Horizontal
36 Total Volume m3 5
37 Diameter m 1.00
38 Length / height m *
39 Length between tangent lines m *
40 Design pressure barg 1
41 Design temperature min / max °C -29 / 70
DESIGN DATA

42 Weight Empty kg *
43 Weight of Internals kg N/A
44 Weight Full kg *
45 Weight Filled with water kg *
46 Weight of Insulation kg N/A
47 Type of Support / Skirt Support on both ends (saddles)
48 Manhole required Y/N Yes
49 Lifting lugs Y/N 2x
50 Earthing 2x
51 Headroom Clearance m N/A
52 Design Life yr 20
# row Rev. PARAMETER UNIT
53 Design Code ASME BPV Sect. VIII, Div 1
54 U-Stamp Required No
CODE REQUIREMENTS

55 PED Applicable No
56 Wind speed km/h 80
57 Earthquake Zone III acc. UBC
58 Snow N/A
59 Corossion Alowance Shell / Heads mm 1.6
60 Corossion Alowance Nozzles mm 1.6
61 Joint Efficiency - 0.7
62 Test pressure % Acc. Code (1.3 bar)
63 Radiographic Examination % None
64 Material Certificates % 100%, pressure retaining parts
Project No. GV01
Requisition No.
CONDENSATE TANK
Client PO :
DATA SHEET 2 of 2
Client Job No.
Page No.
Client GasVesubio Prepared OB
Plant LNG production plant Rev. Proc. RR
Unit Rev. Mech. OB
Document No. GV0001-267-00 Rev. Qlt.
Approved
Date 9/11/2017
Issue no. 0
Tag No.: 26-V8000 P&ID No.: GV0001-110-26 Issued for: RFQ
# row Rev. PARAMETER
65 Heads ( + shape) A516 Gr. 60
66 Shell A516 Gr. 60
67 Stiffening rings N/A
68 Supports / Skirt S235JRG2
69 Nozzles A 106 B
70 Flanges A 105
MATERIALS

71 Welding fittings N/A


72 Internal parts N/A
73 Insulation + Thickness N/A
74 Insulation supports N/A
75 Downcomers N/A
76 Cladding N/A
77 Reinforcing Pads N/A
78 Saddles S235JRG2
79 Manhole A 105
# row Rev. PARAMETER Mark Type Rating Size Remarks
80 A RF 150# 20" Manhole
81 B RF 150# 4" To Flare
82 C RF 150# 2" Drain
83 D RF 150# 1" Level sensor
84 E RF 150# 1" Level sensor
85 F RF 150# 1" Spare
NOZZLES

86 G RF 150# 3/4" Spare


87 H RF 150# 1" Spare
87 I RF 150# 1/2" vent
88 J RF 150# 3/4" N2
89 K RF 150# 1" Process in
90 L RF 150# X" Process in
91 M RF 150# 1" Process in
92 N RF 150# 1" Process in
93 O RF 150# 1/2" Process in
# row Rev. PARAMETER
94 Cleaning Commercial Cleaning
FINISH

95 Painting, Outside Acc. To GV0001-220-02


96 Conservation, Inside Yes
97 Insulation No
# row Rev. PARAMETER UNIT remarks

98

99
100
101
102
TANK P&ID

103
104
105
106
107
108
109
110
111
112
# row Rev. PARAMETER
113 Inspection Authority None
114 General Arrangement Drawing Required For Approval, before start of production
INSPECTION, TESTING,

115 Lifting Lugs Drawing Required For Approval, before start of production
116 Mechanical Calculations Required for Approval before start of production
DOCUMENTS

117 Welding documents Required For Approval, before start of production


118 Non-destructive testing Acc. Code
119 Chemical Analysis / PMI Not Required
120 Material Certificates Required for Review before delivery
121 Cleanliness Certificate Not Required
122 Lifting instructions Not Required
123 Pressure test Certificate Required for Review before delivery
124 Manufacturing Data Book Required 3 weeks after delivery
# row Rev. PARAMETER
*. To be advised by vendor if not specified
The manufacturer is responsible that design and construction are in accordance with the specifications and codes referred to on the requisition and/or
NOTES

drawings. Furthermore, the manufacturer is responsible for ensuring that the design is satisfactory for the design conditions indicated on the requisition and/or
drawings. Calculations and thickness of material supplied to the manufacturer are for information and tendering purposes only. The manufacturer shall make
his own calculations for which he is fully responsible. The manufacturer shall ensure that the supply conforms to all applicable codes and regulations and he
shall obtain all necessary approvals from statutory authorities.