2 Contracted Demand
. Power Contract A - GNPD 27.00 233,280 27.00 233,280 27.00 233,280 27.00
Total-Contracted Demand 27.00 233,280 27.00 233,280 27.00 233,280 27.00
6 Net- Uncontracted Demand 16.81 5,270 13.96 (26,814) 15.07 (20,206) 16.14
Important Notes;
Peak Load requirements (5, 6, 7, 8, 9 and 10 MW) are for CSP. The 47 MW requirement is based on our submitted DDP/PSPP 2021 to DOE.
Wind EGF is from Alternergy which is at present, conducting feasibility study in the area of Alabat Island.
Hydro EGF is left blank for the reason that the reservoir is still on-going construction and feasibility study will be done after the completion.
Contact Person Gerald P. Bautista Contact No. 09088214148
273,019 52.16 284,024 54.14 294,776 56.06 305,279 57.95 315,536 59.79 325,557 61.59 335,349
273,019 52.16 284,024 54.14 294,776 56.06 305,279 57.95 315,536 59.79 325,557 61.59 335,349
- - - - - - - - - - - - -
57,903 8.00 66,974 9.00 76,261 10.00 85,894 47.00 408,402.88 47.00 442,047.00 47.00 477,726.54
57,903 8.00 66,974 9.00 76,261 10.00 85,894 47.00 408,402.88 47.00 442,047.00 47.00 477,726.54
(18,163) 17.16 (16,230) 18.14 (14,764) 19.06 (13,895) 10.95 (92,866) 12.79 (116,490) 14.59 (142,377)
(18,163.43) 17.16 (16,230.24) 18.14 (14,764.32) 19.06 (13,895.46) 10.95 (92,866.42) 12.79 (116,489.70) 14.59 (142,377.20)
19,823 6.51 29,968 9.06 41,681 11.98 55,127 15.32 70,469 19.10 87,870 23.36 107,493
2.00 4,320 2.00 4,320 2.00 4,320 2.00 4,320 2.00 4,320
10.00 43,200.00 10.00 43,200 10.00 43,200 10.00 43,200 10.00 43,200 10.00 43,200
- - - - - -
- 10.00 43,200 12.00 47,520 12.00 47,520 12.00 47,520 12.00 47,520 12.00 47,520
(19,823) 3.49 13,232 2.94 5,839 0.02 (7,607) (3.32) (22,949) (7.10) (40,350) (11.36) (59,973)
(18,163) 7.16 (59,430) 6.14 (62,284) 7.06 (61,415) (1.05) (140,386) 0.79 (164,010) 2.59 (189,897)
RENEWABLE ENERGY DEVELOPMENT PLAN (REDP)
Procurement Plan
Minimum
RE Resource Type Minimum MW PSA Start PSA End Publication
MWh/yr
. Under CSP (Renewable Energy) Base 0.00 -
. RE Market 1 Base 0.00 -
. RE Market 2 Base - -
. RE Market 3 Base - -
. Solar EGF Daytime Peak 2.00 4,320
. Wind EGF Base 10.00 43,200
. Hydro EGF Base 0.00 -
RENEWABLE ENERGY DEVELOPMENT PLAN (REDP)
General Instructions
1. Development of Greenfield RE-EGF shall be based on Uncontracted Demand (Baseload or Intermediate) of EC.
2. Cells highlighted with beige colors shall be filled-in manually by EC
Note: Edit to actual Cost of Power (Without EGF and With EGF), Weighted Average Cost of Power, and Power Utilization
74.83 80.19 85.08 89.63 93.86 97.81 101.54 105.02 108.31
85.43 91.93 101.37 110.739 121.244 132.991 145.589 159.16 174.314