Project Management Office
AGK-PM-QA-PL-0004
Documento de aceptación de Page 1 of 1
entrega ambiental

Project details
Client / Project Name
Project Number
Site Location / Country
MW – kV – Hz
Project Engineer
Operations Manager/Supervisor

Condition at time of handover


(Please attach photographs at the time of handover Notes
with this form for records (Please state any agreements that have been made)
on additional pages with each page signed)
Ground condition clear of oil and spills
All waste has been removed from site
All Aggreko installation/structures have
been removed
All Electrical connections have been
disconnected and secured
All Fuel connections have been
disconnected and secured
Site has been returned in agreed condition
between both Aggreko and Client

NOTES:____________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________

Aggreko

Project Engineer/Manager
The site is fit to be returned

Signed Date

……………………………………... ………………………………

Clients Representative

I/We accept that Aggreko have fulfilled their environmental commitment and there are no further obligations for
Aggreko to fulfil.

Signed Date

……………………………………... ………………………………
END OF DOCUMENT

Document No: AGK-PM-QA-PL-0004


Document Name: Documento de aceptación de entrega ambiental