Professional Documents
Culture Documents
Essais Des Cellules MV
Essais Des Cellules MV
ANNEX
DOCUMENT NUMBER
AZ-0014-PRO-AEE-0004
REVISION 00
DOCUMENT ISSUED FOR: REVIEW
DATE 11/03/2021
THIS DOCUMENT CONTAINS PROPRIETARY INFORMATION AND CAN NOT BE DUPLICATED, MODIFIED OR DISCLOSED TO
THIRD PARTIES FOR ANY USE OTHER THAN THIS PROJECT AND THE PURPOSE FOR WHICH IT IS INTENDED FOR, WITHOUT
THE WRITTEN CONSENT OF COBRA.
Document No.:
EGARC-EPMV
Document Title: Reference Documents:
Medium Voltage Primary Switchgear Site Test Procedure IEC: 62271-200
IEC: 62271-1
Issued By: Date of release: Language: Page:
Mohamed Ghonim 2016 – 02 – 01 En 1/7
Issuing Department: Revision index: Document Kind:
EPMV Service Operations 1 Manual
PURPOSE
This procedure describes the works to be executed at site including the Site
Acceptance Test to verify that the installed equipment is in accordance to the
requirement of the contract.
CONTENTS:
Purpose
This test shall be carried out to ensure the correct mechanical operation of the Switchgear
and that all-mechanical interlock operates correctly.
Preliminary Conditions
- Switchgear completely assembled.
- Auxiliary circuit supplies available.
Procedure
1.2 Check that the shutters are automatically and fully closed when the circuit
breaker/vacuum contactors is withdrawn out from the switchgear panel.
1.3 Check the impossibility of either inserting or isolating the circuit breaker when closed.
1.4 Check that the mechanical interlock prevents the circuit breaker contacts closing if the
truck is positioned between service and test position.
1.5 Check that the circuit breaker cannot be inserted into service position when the earthing
switch is closed.
1.6 Check that the earthing switch cannot be closed when the circuit breaker is in service
position
1.8 Check that the circuit breaker cannot be inserted into service position when the
secondary contacts plug has not been fitted.
1.9 Check the impossibility disconnects the secondary contacts plug of the circuit breaker
when the circuit breaker is in service position.
1.10 Check the functionality of the key interlocks, if provided and the difference in code
Preliminary Conditions
- Switchgear completely assembled.
- Interconnection between panels finished.
- Auxiliary circuit supplies available.
Relay tester,
Digital multi meter
Auxiliary power supplies
Procedure
2a.2 Check the correct function of the circuits to be connected to the D.C.S.
(if provided)
2a.3 Check the functionality of the circuit breaker limit switches (test / service)
2a.4 Check the functionality of the circuit breaker aux. contacts (open / closed).
2a.5 Check the functionality of the earthing switch aux. contacts (open / closed)
2a.6 Following the SWGR functional schemes and the protection relays,
verify the panels and switchgear functionality. Checking:
Electrical interlocks, electrical sequences, functional and control indicators.
Document No.:
EGARC-EPMV
Document Title: Reference Documents:
Medium Voltage Primary Switchgear Site Test Procedure IEC: 62271-200
IEC: 62271-1
Issued By: Date of release: Language: Page:
Mohamed Ghonim 2016 – 02 – 01 En 5/7
Issuing Department: Revision index: Document Kind:
EPMV Service Operations 1 Manual
Procedure
Carry out the power frequency voltage withstand test of auxiliary and control circuits applying
a voltage of AC 1kV / 1Sec between auxiliary and control circuit connected together as a whole
and the frame of the switchgear.
Acceptance Criteria
The test shall be considered as positive if neither flashover, nor puncture will occur.
Document No.:
EGARC-EPMV
Document Title: Reference Documents:
Medium Voltage Primary Switchgear Site Test Procedure IEC: 62271-200
IEC: 62271-1
Issued By: Date of release: Language: Page:
Mohamed Ghonim 2016 – 02 – 01 En 6/7
Issuing Department: Revision index: Document Kind:
EPMV Service Operations 1 Manual
Purpose
Dielectric test is performed to verify if the insulation of live parts is satisfactory and to
permit the Switchgear to be energized.
Preliminary conditions
- Equipment installed and connected.
- Switchgear is cleaned of dust, dirt, moisture, etc.
- Temporary disconnection of electronic devices.
- Voltage transformer fuses drawn out.
Procedure
Carry out the main circuits power frequency voltage withstand test among each phase in
succession and the earthed one. The circuit breakers / LBS are closed.
Acceptance Criteria
The test is considered as successful if neither flashovers nor perforations occur during each
test
Document No.:
EGARC-EPMV
Document Title: Reference Documents:
Medium Voltage Primary Switchgear Site Test Procedure IEC: 62271-200
IEC: 62271-1
Issued By: Date of release: Language: Page:
Mohamed Ghonim 2016 – 02 – 01 En 7/7
Issuing Department: Revision index: Document Kind:
EPMV Service Operations 1 Manual
Current Circuits
Procedure
4.1 According to CTs ratio inject to primary side a suitable one / three phases current
and verify the correct ammeter reading, current transducers function etc.
According to Specifications of current protection functions carry out the
secondary injection to the protection relays to verify the correct operation of
protection circuits.
Voltage Circuits
Procedure
4.2 According to voltage transformers' ratio apply on primary side of transformers a
suitable voltage and verify correct voltmeter reading, voltage transducers
function etc.
According to Specifications of voltage protection functions carry out the
secondary injection to the protection relays to verify the correct operation of
protection circuits.