EIA PERMIT PROCESS, TIMING AND FOLLOW-UP

TIME LAPSE
1. Initiation Process ESTIMATE
REQUIRED
2. EIA Process
Sent to FMEnv
Submit Draft EIA Report

Client visit FMEnv


Technical Presentation to
FMEnv (in house)
4-8 WKS

Review of Draft Report


by FMEnv
Draft report
No
accepted?

No
public display required?

6-8 WKS 20-


30
WK
S

Mandatory public display (21


working days)

FMEnv receives public


comments (14 working days) Follow up

Presentation by operator FMEnv team visits project site & conduct panel
review 4-6 WKS

Mediation

Follow up

Recieves FMEnv comments & observations


2-4 WKS

Produce & submit final EIA report

Follow up
FMEnv approval, permit issues & ESI

4-6 WKS
FMEnv visit site
Monitor Environmental management plan
DPR EIA APPROVAL PROCESS

Project Initiation
Project
Initiation

Current List Mandatory EAs:


Preliminary Assessment Report - Drilling (exploration, appraisal, development on a field
basis) for onshore/nearshore areas
- Baseline & monitoring for offshore
- Construction of crude oil production, tak farm,
Screening terminals
- Laying of flowline; pipeline longer than 50km;
- (other petroleum facilities)

Review 30 days Proposed list of mandatory EAs: (Revised DPR guidelines


- All seismic operations
- Oil & Gas developments onshore, nearshore &
No offshore
Major significant
impact - Construction of crude oil production, tank farm &
terminal facilities
Yes
- Laying of gas lines; flowlines longer than 20km
- LNG plant
Scope of work - (other petroleum facilities)
developed Scoping - Construction of waste treatment/disposal facilties
- Wastewater treatment pant
- Incineration process above 300 kg/hr
- Engineered sanitary land filling ex situ
EIA study undertake

Study
implementation

Draft EIA Review 21 days


Company
Review

Acceptable Government

Yes
Final EIA

Approval
Formally Accepted
10 days

Implement conditions &

Operations
Current list of mandatory EAs
FMEnv EIA APPROVAL PROCESS
- Oil & gas field developments
Project initiation - Construction of offshore,
onshore & overland pipeline
- Construction of oil & gas
separation, processing, handling
& storage facilities
Project proposal - Construction of oil refineries
- (other petroleum activities)
- Waste treatment & disposal
- Other activities including airport

IEE
Cat.I & Cat.II & cat. III Cat. III
cat. II physical int
in ESA
Screening report

Full EIA Partial EIA

Terms of reference
Scoping

P.A.R Specific studies


Public hearing

Revised TOR

EIA study undertaking

15 days Review

Review of draft report Mediation In-house panel


public

Acceptable Review undertaken within 1 month


after review process

Implement conditions &


monitor

Final EIA submitted to FMEnv To be received within 6 months of


receiving agency

1 month after receipt Company


EIS Developed of final report
No project
certification
Government
project implimentation
Commissioning

Mitigation compliance monitoring

Post commissioning
Auditing