This document provides instructions for Assignment 2 and 3 of the Power System Protection course. It specifies that students must individually complete and submit a single PDF report containing:
1) A table with currents, voltages and impedances for different fault locations and impedances using Power World Simulator (PWS)
2) Details of steps to complete the PWS case file
3) A brief description of software including PWS, PSCAD and ATPDraw
4) An explanation of impedance and differential protection schemes using data from the previous tasks
It also includes a table allocating different fault scenarios to students for analysis in their reports.
This document provides instructions for Assignment 2 and 3 of the Power System Protection course. It specifies that students must individually complete and submit a single PDF report containing:
1) A table with currents, voltages and impedances for different fault locations and impedances using Power World Simulator (PWS)
2) Details of steps to complete the PWS case file
3) A brief description of software including PWS, PSCAD and ATPDraw
4) An explanation of impedance and differential protection schemes using data from the previous tasks
It also includes a table allocating different fault scenarios to students for analysis in their reports.
This document provides instructions for Assignment 2 and 3 of the Power System Protection course. It specifies that students must individually complete and submit a single PDF report containing:
1) A table with currents, voltages and impedances for different fault locations and impedances using Power World Simulator (PWS)
2) Details of steps to complete the PWS case file
3) A brief description of software including PWS, PSCAD and ATPDraw
4) An explanation of impedance and differential protection schemes using data from the previous tasks
It also includes a table allocating different fault scenarios to students for analysis in their reports.
NUST School of Electrical Engineering and Computer Science
Department of Electrical Engineering
Power System Protection (EE-464) Assignment # 2 and 3 (CLO-2) Class: BEE-10 Instructor: Tassawar Kazmi Submission Date: 05 November 2021 Instructions: Each student should complete and submit individual report. Report should be printed in pdf format in A4 paper size. There should be a single detailed report for all tasks. Report must contain proper cover page. Everything must be specified/ highlighted with the clarity of writing and presentable formatting, which is also a part of evaluation. Such reports will be given zero marks in which noticeable similarity is found in any part. PWS (Power World Simulator) case file and pdf file should be submitted at LMS. 1. Assignment 2 Total Marks: [ ___ / 10] a. Use PWS to make a table for currents, voltages and impedances at all 5 buses, under normal operation and in case of specified faults. Fault locations: At the distances of X% of the line length from both line terminals and middle of the line. Fault impedances: 0Ω and 40Ω
X = Sum of last two digits of your Qalam ID number
b. Write all steps in completing PWS case file.
2. Assignment 3 Total Marks: [ ___ / 10]
a. Give brief description about the importance and working of following softwares: i. PWS ii. PSCAD iii. ATPDraw
b. Describe the applicability of impedance protection and differential protection schemes
for transmission line from the data obtained in the previous steps. Table 1: Tasks of assignment Task Allocations: 1 00000264029 2 00000256062 Task 1: 3 00000267706 SLG fault at line 1 4 00000259108 5 00000242995 6 00000253124 7 00000202211 Task 2: 8 00000253875 SLG fault at line 2 9 00000261974 10 00000244305 11 00000244344 12 00000246620 Task 3: 13 00000243583 SLG fault at line 3 14 00000264831 15 00000249796 16 00000241741 17 00000255030 Task 4: 18 00000261455 LLG fault at line 1 19 00000258651 20 00000244099 21 00000247895 22 00000243048 Task 5: 23 00000262098 LLG fault at line 2 24 00000244019 25 00000265249 26 00000266513 27 00000244588 Task 6: 28 00000268850 LLG fault at line 3 29 00000253175 30 00000248838 31 00000241917 32 00000248381 Task 7: 33 00000270659 LLL fault at line 1 34 00000265785 35 00000245387 36 00000245695 37 00000268723 Task 8: 38 00000244979 LLL fault at line 2 39 00000250407 40 00000261088 41 00000258857 42 00000244132 Task 9: 43 00000248896 LLL fault at line 3 44 00000245139 45 00000243154