You are on page 1of 13

Client: 

STC ‐ AL ASHOURY INDUSTRY  40m GRD TOWER

ASHPOWER
ASHOURY FOR POWER, TELECOM ANDSTEEL INDUST

Technical Design Calculation

FOR

40m GRD TOWER

CUSTOMER: STC

40m GRD TOWER
Client: STC ‐ AL ASHOURY INDUSTRY  40m GRD TOWER

CONTENT
1‐ GRD TOWER INTRODUCTION

2‐ SPECIFICATION & INSTALLATION FOR PRECAST SYSTEM

3‐ TOWER PROFILE

4‐ Design Parameters
2‐1 Loading

5‐ Conclusion

6‐ Design of Anchor Bolts & Base Plates

7‐ TOWER ANALYSIS PROGRAM PRINTOUT
Section A Project Data
Section B Structure Geometry
Section C Antenna Data
Section D Transmission Line Data 
Section E Ladder Data
Section F Point Of Load Data
Section G Wind Load data
Section H Structural Displacement Data
Section J Antenna Displacement Data
Section L Strength Assessment Data
Section M Section Properties Data
Section N Leg Reaction Data
Section O Tower Foundation Data
Appendix 1 Tower Profile Diagram
Appendix 2 Horizontal Displacement Diagram

8‐ FOUNDATION 
Section I Calculation of Tensioning Bars
Section II Foundation Design
Section III Foundation Drawings

40m GRD TOWER
Client: STC ‐ AL ASHOURY INDUSTRY  40m GRD TOWER

GRD TOWER INTRODUCTION

Rapid Deployment System is composed of :
1‐ Transportable and Reusable concrete precast cells which ensure quick deployment 
      of GF site.

2‐Can be installed on any type of soil. From a rocky soil up to a very sandy soil type
     they are replacing the shallow and superficial foundations.

3‐ The frame base may also easily receive equipment as Shelter, Generator set, 
    Electrical boxes, Tanks& Fence.

4‐ The System allows for any future expanding by adding more cells.

5‐ The foundation work can be done by only one day.

40m GRD TOWER
Client: STC ‐ AL ASHOURY INDUSTRY  40m GRD TOWER

ABOUT TSTOWER SOFTWARE

TSTower is a general computer program for the analysis and design of cantilevered latticed self‐
supporting towers. Towers can either have triangular or square cross sections. The program will 
solve using the American codes :
TIA/EIA 222‐F, TIA/EIA‐222‐G (Draft) and the Canadian equivalent CSA S3794 and CSA S37‐01.           
     Load generation, capacity assessments follow the   applicable codes, and analysis is based on a 
three‐dimensional beam model .  The program analyzes the tower for all specified wind and ice 
loads and 
determines the capacity of the members. The results are displayed graphically on the screen. This 
allows the designer to visually check the adequacy of the design and quickly make adjustments to 
achieve the optimum solution. The program allows for a full printout or a summary printout of 
the results. A 
graphical printout of the profile is also available.

40m GRD TOWER
Client: STC ‐ AL ASHOURY INDUSTRY  40m GRD TOWER

Antenna Configurations:
GSM Antenna

9 nos.  GSM Panel antenna "2575 x259x 099"mm  @ Top of tower.
9 nos. GSM Panel antenna "1302 x262 x 69"mm  @ Top ‐3m.

M/W Antenna
" High Performance "
4 nos. 0.6m dia. HP solid dishes , @ Top ‐5m
4 nos. 1.2m dia. HP solid dishes , @ Top ‐6m
TX Lines:
36 nos. FOR 18 ‐  GSM antenna feeders of diameter (1 5/8) inch each,.
4 nos.  For 8 MW 0.6 m dia. feeders of diameter (7/8) inch each.
4 nos.  For 4  MW 1.2 m dia. feeders of diameter (7/8) inch each.
" See attached soft ware , Feeders are modelled and loads are generated by soft ware see section D'"
Antenna mounting System
1 NO. Circular 4.8m Dia , with 9 nos. 90mm OD x4mm thick x 6 m long mounting pipes.
Inside Ladder With Safety Rail System:
 Climbing ladders with safety rail and  cable ladders located behind the climbing ladder
ladders locations inside tower . 
* Ladder rails are L60x5mm angle bar spaced 400mm in to in.
* Ladder rungs are 20mm solid round @ 300mm c/c.
" See attached soft ware , Ladder is modelled and loads are generated by soft ware see section E'"
Inside Cable Ladder:
Two inside cable ladders located behind climbing ladder.
* Cable ladder are made  with 800mm width and from section of  80x6mm U‐ bended plate 
        spaced 1000mm c/c connected to the ladder.
Working Platform at ELEV. 38.7m
Wind Loading Area 0.3m² 
Vertical Load 2.5 KN
Rest  Platform at ELEV. 15.0 m and 30m

Wind Loading Area 0.3m² 
Vertical Load  1.0KN

40m GRD TOWER
Client: STC ‐ AL ASHOURY INDUSTRY  40m GRD TOWER

GSM Antenna WIND AREA
9NOS.  GSM ANTENNA
Number of Antenna = 9
Location = Top of the tower
Antenna Dimensions = 2.575 x 0.259 0.099
Antenna Aspect Ratio = 9.942
Force Coefficient  Ca = 1.498
Effective Area Ae = Ca(EPA)n

ASSUME WORST CASE ALL ANTENNA ARE FACING WIND

Facing Wind Area "for one Antenna" Ae = 0.999 m²

Facing Wind Area "For 9 Antenna" Ae = 8.992 m²

Latteral Wind Area "for one Antenna" Ae = 0.38 m²

Latteral Wind Area "For 9 Antenna" Ae = 3.44 m²

Weight Of 9 Antenna with  V = 9 KN
antenna mount
 We input the loading Area of the 9‐  GSM Antenna as point of load.
See section " F" in attached Report

9 NOS. 3G GSM ANTENNA
Number of Antenna = 9
Location = Top ‐3 of the tower
Antenna Dimensions = 1.302 x 0.262 0.069
Antenna Aspect Ratio = 4.969
Force Coefficient  Ca = 1.332
Effective Area Ae = Ca(EPA)n

Facing Wind Area "for one Antenna" Ae = 0.454 m²
Facing Wind Area "for one Antenna" Ae = 4.09 m²
Latteral Wind Area "for one Antenna" Ae = 0.12 m²
Latteral Wind Area "For 9 Antenna" Ae = 1.08 m²

Weight Of 9 Antenna with  V = 6 KN
antenna mount
 We input the loading Area of the 9‐  GSM Antenna as point of load.
See section " F" in attached Report

40m GRD TOWER
Client: STC ‐ AL ASHOURY INDUSTRY  40m GRD TOWER

MW Antenna Load 
MW are modelled by the TSTOWER soft Ware as  " ANDREW High performance Antenna"
Cylendrical Shrouded.

 See Section "C" in soft ware report 'antenna  and mount wind load'
See attached Tower Analysis Report

40m GRD TOWER
Client: STC ‐ AL ASHOURY INDUSTRY  40m GRD TOWER

ANCHOR BOLTS AND BASE PLATE DESIGN

40m GRD TOWER
Client: STC ‐ AL ASHOURY INDUSTRY  40m GRD TOWER

Conclusion

1‐ STEEL MEMBER STRENGTH
All Compression / Tension forces are compared to the member compression 
See attached TSTOWER program to see the utility ratio of tower members:
See Section L:
" : STRENGTH ASSESSMENT SORTED DATA " ALL ASSESS. RATIO   <  1"
The 40.0 m will meet the survival loading of (160 kph) wind speed.
2‐ Bolts Connection Capacity

Memb
Connecti
Member  Bolt  er 
Elevation   part  Leg Size          No of  on 
Thick.  Size   Capaci RATIO
 "m" number  "mm" Bots Capacity 
"mm" "mm" ty 
"KN"
"KN"
0‐8 1 120x120 10 16 6 427.1 559.3 0.76
8‐12 2 100x100 10 16 6 427.1 559.3 0.76
12‐18 3 100x100 8 16 6 386.5 559.3 0.69
18‐24 4 90x90 7 16 6 315.4 559.3 0.56
24‐30 5 90x90 6 16 6 224.5 559.3 0.40
30‐36 6 90x90 6 16 6 129.2 559.3 0.23
36‐40 7 80x80 6 16 6 171.5 559.3 0.31

R ti b t
Ratio between member capacity to the connection bolts capacity are less than 1.0 ….OK
b it t th ti b lt it l th 1 0 OK
All Connections and bolts will be safe under survival wind load.

Ratio between tensile force to the connection bolts capacity are less than 1
All Connections and bolts will be safe under survival wind load.

3‐ Tilt / Twist

See Section "J & L " in the attached Software report " for max. Tilt

The max. Tilt / Twist at wind speed of 120km/hr  operational speed
Ø  = 0.20 degree <  0.5˚       OK
eet the requirement of Zain specification "FTK‐2 Rev. 5"

40m GRD TOWER
Client: STC ‐ AL ASHOURY INDUSTRY  40m GRD TOWER

Calculation of  required For Tension Bars size

Tensile Strength of tension bar = 410 Mpa

Each Precast block Weight = 7.5 M.Tons

= 73.58 KN

Three blocks to be tensioned to the fourth one

Total blocks to be tensioned weigh = 220.7 KN

Friction Coefficient for concrete = 0.5

Total Tensioning force required = 110.4 KN

Use bar dia = 25 mm

Bar cross‐sectional area = 490.6 mm²

Ultimate  Tensile Force for bar = 201.2 KN

Ratio of Tension force to bar tensile force = 54.86 %

< 80 %

OK

40m GRD TOWER
Client: STC ‐ AL ASHOURY INDUSTRY  40m GRD TOWER

TOWER ANALSYIS PRINT OUT 

40m GRD TOWER
Client: STC ‐ AL ASHOURY INDUSTRY  40m GRD TOWER

Design Standard: ANSI/TIA-222-G-2005


Start wind direction: 0˚
End wind direction: 315˚

40m GRD TOWER
Client: STC ‐ AL ASHOURY INDUSTRY  40m GRD TOWER

Increment wind direction: 45˚


Elevation above ground: 0 m
Gust Response Factor Gh: 0.85
Structure class: II
Exposure category: D
Topographic category: 1
Material Density: 7850 Kg/m³
Weight Multiplier: 1
Minimum Bracing Resistance as per 4.4.1

WIND ONLY CONDITIONS:


Basic Wind Spee 155 Km/hr 0.00 (m/s)
Directionality Factor Kd: 0.85
Importance Factor I: 1
Wind Load Factor: 1.6
Dead Load Factor: 1.2
Dead Load Factor for Uplift: 0.9

WIND ONLY SERVICEABILITY CONDITIONS:


Serviceability Wi 120 Km/hr 0.00 (m/s)
Directionality Factor Kd: 0.85 0.85
Importance Factor I: 1.00 1
Wind Load Factor: 1.00 1
Dead Load Factor: 1.00 1

Strength Limit State Load combination " 1.2x Dedad Load + 1.6 Wind load"
" 0.9 x Dead Load + 1.6 Wind Load"

Operational Load Combination "1x Dead Load + 1.0 x Wind Load"

Allowable Tilt and Twist 0.5˚ @ 120 KM/hr

40m GRD TOWER