Disusun Oleh :
4 MRK 5
2021
PLANNING
5. Prepare forecast :
( Umar Syarief / 1841320109 / 24 )
• Where are we capable to going ?
We assume the project is still running at 30%. Because we have
weather contraints. That’s why we are still digging the installation path.
• What do we need to take us where we want to go ?
If the project work is carried out during the rainy season, the solution
is to immediately provide a concrete work floor.
6. Select strategy portfolio :
( Aditya Ristha Pradana / 1841320147 / 02 )
• What is the best course for us to take ?
One strategy to speed up the process of implementing this
wastewater treatment plant (WWTP) construction project at Dr.
Mohammad Saleh is to apply the right method to the construction of the
bottom structure of the building, that is foundation. Because the foundation
is the most important part of a building and must be carried out first before
building another structure, if the foundation work can be done faster it is
possible that other work will also be carried out soon.
Technically, the strauss pile foundation is also very suitable for use
in this hospital WWTP project. The load that will be received by this
foundation will be in the form of a load from the first floor plate with an
area of 26.5 m2, a steel frame structure with a height of 6.5 m and the
volume of water accommodated by a biofiller tank with a total capacity of
about 80000 liters. With building dimensions that are not too large but have
such a large load, the decision to choose to use a strauss pile foundation is
the right choice.