Professional Documents
Culture Documents
➢ T-H Diagrams,
➢ Problem table method,
330 (370-330).4,0=160 kw
3 370
4
For hot combined stream:
H1=(450-400).1=50 kw
H2=(400-350).(2+1)=150 kw
H3=(350-310).2=80 kw
H1=(330-300).1,8=54 kw
H2=(370-330).(4+1,8)=232 kw
H3=(390-370).1,8=36 kw
5
6
The pinch temperatures:
Thc,pinch=340 K
Tcc,pinch=330 K
Qhu,min=48 kw
Qcu,min=6 kw
7
➢ Problem table method,
305 1 Adjusted
395
temperatures
2
395 305
3
375 335
445 345 4
8
1
9
Stream Stream Heat
Number Type Capacity,
mCp (kw/K)
1 Hot 2.0
2 Cold 1.8
3 Cold 4.0
4 Hot 1.0 (0-1).50
(1,8-(2+1)).20
((4+1,8)-(2+1)).30
((4+1,8)-2).10
The pinch temperatures: Tpinch
(1,8-2).30
Thc,pinch = Tpinch+Tmin/2
= 340 K
Tcc,pinch= Tpinch-Tmin/2
= 330 K
The minimum utility requirements:
10
Qhu,min=48 kw
Qcu,min=6 kw
MAXIMUM ENERGY RECOVERY (MER)
H1
H4
C2
C3
11
Thc,pinch mCp
450 400 340 310
2
H1 H1
350 1,0
H4 H4
C2
C2 1,8
C3
370
C3 4,0
Tcc,pinch
Network Design Above the Pinch
(𝒎𝑪𝒑)𝒉 ≤ (𝒎𝑪𝒑)𝒄
13
➢ Match H1 and C3:
H1 stream: (400-340).2=120 kw
C3 stream : (370-330).4=160 kw
160-120=40 kw
H4 stream: (450-350).1=100 kw
C2 stream : (390-330).1,8=108 kw
108-100=8 kw
330+(100/1,8)=385,56 K
15
Network Design Below the Pinch
(𝒎𝑪𝒑)𝒉 ≥ (𝒎𝑪𝒑)𝒄
16
➢ Match H1 and C2:
H1 stream: (340-310).2=60 kw
C2 stream : (330-300).1,8=54 kw
60-54=6 kw
100 kw 350
H4 H4 2
120 kw 54 kw 313 K
H1 H1 1 3 C
6 kw
C3 370 360 K
H 1 C3
40 kw 120 kw
C2 385,56 K
H 2 3 C2
8 kw 100 kw 54 kw
Tcc,pinch