Parth Infrastucture Pvt.

Ltd
nspection And Test Plan For Roads
Attachments
List of Referenced Forms:

Sir No Form No. Description

1.1 ITP-PIPL-QMD-FMT-020 Inspection of Grubbing


1.2 ITP-PIPL-QMD-FMT-021 Field Compaction test on original ground
1.3 ITP-PIPL-QMD-FMT-022 Inspection of thikness of filling layer
1.4 ITP-PIPL-QMD-FMT-023 Field Compection of Subgrade
2.1 ITP-PIPL-QMD-FMT-024 Inspection of material
2.2 ITP-PIPL-QMD-FMT-025 Inspection of Spreading & Layer thikness
2.3 ITP-PIPL-QMD-FMT-026 Field Compaction test GSB
3.1 ITP-PIPL-QMD-FMT-027 Inspection of Mix & Spreading
3.2 ITP-PIPL-QMD-FMT-028 Inspection of Layer width layer thikness & Paving top levels
3.3 ITP-PIPL-QMD-FMT-029 Field Compaction test
4.1 ITP-PIPL-QMD-FMT-030 Inspection of Material at HMP (Review of MTC) Prime Coat
4.2 ITP-PIPL-QMD-FMT-031 Inspection of rate of spread
5.1 ITP-PIPL-QMD-FMT-032 Inspection of Material at HMP (Review of MTC) Tack Coat
5.2 ITP-PIPL-QMD-FMT-033 Inspection of rate of spread for tack coat cover bitumen surface
6.1 ITP-PIPL-QMD-FMT-034 Inspection for quality of mix (Stability, flow, density, & Air voids)
6.2 ITP-PIPL-QMD-FMT-035 Inspection of Layer width layer thikness & Paving top levels (DB
7.1 ITP-PIPL-QMD-FMT-036 Temperature chek of mix (at Plant laying & roling temp.)
7.2 ITP-PIPL-QMD-FMT-037 Layer Thikness (Seal Coat)
Note:
1 Each specific Inspection and Test Plan (ITP) will have a revision number which is Individually changed as
The referenced forms are incuded in and controlled by the referenced document. Therefore, the latest revis
at the time of initiation of the ITP, will be utilized. the referenced forms will be included only during ITP rev
issue for contruction (IFC)

2 This ITP shall be used as Inspection and Test Plan before execution of the job, where as during and after
be used as checklist.

Legend of Inspection Requirements:


H: Hold Point: A mandatoty inspection point and work shall not proceed without the presence of a represen
organizationh
w: witness Inspection point: Designated witnaess points for the Involved personnel which are required to be
witnessed personnel. All activityed, which have a “W” point will requite a written notification to company
event that the Company Inspector dose not attend within an agreed period the work may proceed. In suc
contractors Inspectors will record inone appropriate signature spece on the torros not wimessed and sha
spaces.
w%: % witness Inspection point: Desgnated percentage witness point assigned by the Company, which will Re
notificatiom the vendor/contractor. In the event Company Inspector does not attend within an agreed per
proceed. The percentage shall mean a minimum of 10% Inspection, if not otherwise agreed in the contrac
be increased at discretion of the Company Inspector.

S: Surveillance/monitoring: Random observation of the controls of process activies. However,such activities


be signaed off by Company Inspector
DR: Document Review/ Review: This entails of review of approiate documentation.

ITP-QMD-PIPL-ITP-005

Prepared Checked
Rev Date Revision
By By
Note:- This ITP provides general information. This is valid for specific project only when reviwed and modified as per specific project
approved by authorized person.
e
)
BM)

s tha ITP are revised.


sion of these forms,
view cycles prior to

job execution it shall

ntive of the cognizant

signed off by
Inspector, in the
ch cases, Vendors/
all signand date such

equire written
riod the work nay
ct, however this nay

s are not required to

Approved By
t requirements and
Parth Infrastucture Pvt.Ltd
nspection And Test Plan For Roads
Attachments
List of Referenced Forms:

Sir No Form No. Description

1.1 ITP-PIPL-QMD-FMT-020 Inspection of Grubbing


1.2 ITP-PIPL-QMD-FMT-021 Field Compaction test on original ground
1.4 ITP-PIPL-QMD-FMT-023 Field Compection of Subgrade
2.1 ITP-PIPL-QMD-FMT-024 Inspection of material
2.3 ITP-PIPL-QMD-FMT-026 Field Compaction test GSB
3.1 ITP-PIPL-QMD-FMT-027 Inspection of Mix & Spreading
3.2 ITP-PIPL-QMD-FMT-028 Inspection of Layer width layer thikness & Paving top levels
3.3 ITP-PIPL-QMD-FMT-029 Field Compaction test Wmm
4.1 ITP-PIPL-QMD-FMT-030 Inspection of Material at HMP (Review of MTC) Prime Coat
4.2 ITP-PIPL-QMD-FMT-031 Inspection of rate of spread
5.1 ITP-PIPL-QMD-FMT-032 Inspection of Material at HMP (Review of MTC) Tack Coat
6.1 ITP-PIPL-QMD-FMT-034 Inspection for quality of mix (Stability, flow, density, & Air voids)
6.2 ITP-PIPL-QMD-FMT-035 Inspection of Layer width layer thikness & Paving top levels (DB
7.1 ITP-PIPL-QMD-FMT-036 Temperature chek of mix (at Plant laying & roling temp.)
7.2 ITP-PIPL-QMD-FMT-037 Layer Thikness (BC Top Layer)
Note:
1 Each specific Inspection and Test Plan (ITP) will have a revision number which is Individually changed as
The referenced forms are incuded in and controlled by the referenced document. Therefore, the latest revis
at the time of initiation of the ITP, will be utilized. the referenced forms will be included only during ITP rev
issue for contruction (IFC)

2 This ITP shall be used as Inspection and Test Plan before execution of the job, where as during and after
be used as checklist.

Legend of Inspection Requirements:


H: Hold Point: A mandatoty inspection point and work shall not proceed without the presence of a represen
organizationh
w: witness Inspection point: Designated witnaess points for the Involved personnel which are required to be
witnessed personnel. All activityed, which have a “W” point will requite a written notification to company
event that the Company Inspector dose not attend within an agreed period the work may proceed. In suc
contractors Inspectors will record inone appropriate signature spece on the torros not wimessed and sha
spaces.
w%: % witness Inspection point: Desgnated percentage witness point assigned by the Company, which will Re
notificatiom the vendor/contractor. In the event Company Inspector does not attend within an agreed per
proceed. The percentage shall mean a minimum of 10% Inspection, if not otherwise agreed in the contrac
be increased at discretion of the Company Inspector.

S: Surveillance/monitoring: Random observation of the controls of process activies. However,such activities


be signaed off by Company Inspector
DR: Document Review/ Review: This entails of review of approiate documentation.

ITP-QMD-PIPL-ITP-005

Prepared Checked
Rev Date Revision
By By
Note:- This ITP provides general information. This is valid for specific project only when reviwed and modified as per specific project
approved by authorized person.
)
BM)

s tha ITP are revised.


sion of these forms,
view cycles prior to

job execution it shall

ntive of the cognizant

signed off by
Inspector, in the
ch cases, Vendors/
all signand date such

equire written
riod the work nay
ct, however this nay

s are not required to

Approved By
t requirements and