You are on page 1of 26

CONSTRUCTION OF GANGCHITPO BAILEY BRIDGE ON SILAMBI-NAGOR

GC ROAD, LINGMITHANG REGIONAL OFFICE

DETAIL DESIGN DRAWINGS


SPAN CARRIAGE WAY
DATE OCTOBER., 2017
DS 80 ft 3.227m
DRAWING LIST
SL DESCRIPTION DRAWING NUMBER
1 COVER PAGE
2 DRAWING LIST GB-DL-01
3 GENERAL NOTES GB-GN-02
4 REBAR CODES & SHAPE DETAILS GB-RCSD-03
5 GENERAL PLAN 01 GB-GP01-04
6 GENERAL PLAN 02 GB-GP02-05
7 GENERAL ELEVATION 01 GB-GE01-06
8 GENERAL ELEVATION 02 GB-GE02-07
9 SIDE ELEVATION & FRONT ELEVATION OF LEFT ABUTMENT GB-ABT-08
10 FOOTING & BEARING PLAN OF LEFT ABUTMENT GB-ABT-09
11 SECTIONAL ELEVATION & REINFORCEMENT VIEW "1-1-" OF LEFT ABUTMENT GB-ABT-10
12 REINFORCEMENT DETAILS OF LEFT ABUTMENT GB-ABT-11
13 FRONT REINFORCEMENT VIEW & SECTION "E-E" OF LEFT ABUMENT GB-ABT-12
14 SPACER PLAN & SECTION OF LEFT ABUTMENT GB-ABT-13
15 REINFORCEMENT SECTION & REINFORCEMENT SIDE VIEW OF LEFT ABUTMENT GB-ABT-14
16 REINFORCEMENT PLAN OF RETURN WALL GB-ABT-15
17 BAR BENDING SCHEDULE OF LEFT ABUTMENT GB-ABT-16
18 BAR BENDING SCHEDULE OF LEFT RETURN WALL GB-ABT-17
19 SIDE ELEVATION & FRONT ELEVATION OF RIGHT ABUTMENT GB-ABT-18
20 FOOTING & BEARING PLAN OF RIGHT ABUTMENT GB-ABT-19
21 REINFORCEMENT DETAILS OF RIGHT ABUTMENT GB-ABT-20
22 PLAN OF ANCHORAGE BAR & REINFORCEMENT VIEW "1-1" OF RIGHT ABUTMENT GB-ABT-21
23 BAR BENDING SCHEDULE OF RIGHT ABUTMENT GB-ABT-22
24 PLAN OF RRM WING WALL GB-ABT-23
25 ELEVATION & SECTION OF WING WALL GD-ABT-24

SHEET CONTENTS : REVISION DATE NAME & SIGNATURE DRAWING NO.


ROYAL GOVERNMENT OF BHUTAN BAILEY TYPE STEEL TRUSS GANGCHITPO BRIDGE FIRST ISSUE Oct., 2017 DESIGN TSHEWANG RINZIN (E)

Ministry of Works & Human settlement [DS 80 FT SPAN & 3.277 m CARRIAGEWAY] GB-DL-01
On Silambi-Nagor GC Road DRAWING LIST REVISED DRAWN TSHEWANG RINZIN (E)
Department of Roads, Bridge Division
Thimphu, Bhutan under Lingmithang Regional Office CHECKED RINCHEN KHANDU (EE) SCALE: NTS

APPROVED KARMA WANGDI (CE) (as Sheet A3 size)


GENERAL NOTES FOR RCC CONSTRUCTION WORK

A. GENERAL C. REINFORCEMENT
1. ALL REINFORCEMENT SHALL BE OF HIGH YIELD STRENGTH
1. THE NOTES IN THIS DRAWING SHALL BE READ IN CONJUNCTION WITH ALL DEFORMED BARS (MIN fy 500 MPa).
RELEVANT DRAWING PERTAINING TO THE BRIDGE.
2. SCHEDULLING OF BAR IS DONE IN ACCORDANCE WITH ISO 4066:2000.
2. UNLESS OTHERWISE SPECIFIED, ALL DIMENSIONS IN MILLIMETER (mm) AND
ALL LEVELS ARE IN METER (m). DIMENSIONS ARE NOT TO BE SCALED AND ONLY 3. MINIMUM LAP LENGTH OF REINFORCEMENT SHALL BE CONFORM TO
WRITTEN DIMENSION ARE TO BE FOLLOWED. AASHTO/2007. IF 50% OF REINFORCEMENT IS TO BE SPLICED PROVIDE
CLASS B AND FOR 100% SPLICING PROVIDE CLASS C AS SHOWN BELOW:
3. THE CONTRACTOR SHALL VERIFY ALL CHAINAGES, REDUCED LEVELS,
COORDINATES AND DIMENSIONS BEFORE START OF THE WORK. INCASE BAR DIA DEV. SPLICE LENGTH, mm
OF ANY DISCREPANCY, THE MATTER SHALL BE BROUGHT TO NOTICE OF mm LENGTH, mm CLASS A CLASS B CLASS C
THE ENGINEER. 10 220 300 300 374
12 317 317 412 538
4. ABUTMENTS OF THE BRIDGE IS DESIGNED AS PER IRC - 21 & IS 456 USING MIDAS CIVIL. 16 563 563 732 957
18 713 713 926 1211
20 880 880 1144 1495
5. LOADING: CLASS 24R AS PER IRC.
22 1064 1064 1384 1809
25 1374 1374 1787 2337
28 1724 1724 2247 2931
32 2252 2252 2927 3828
B. CONCRETE
4. CLEAR CONCRETE COVER TO REINFORCEMENT IS AS FOLLOW.
UNLESS OTHERWISE SPECIFICALLY MENTIONED IN THE DRAWINGS OR DIRECTED UNLESS OTHERWISE SPECIFIED BY ENGINEER,
BY THE ENGINEER, CONCRETE GRADE SHALL BE AS PER THE RELATED SECTION THIS SHALL BE FOLLOWED THROUGHOUT THE CONSTRUCTION.
OF CONTRACT DOCUMENT PARTLY REPRODUCED AS BELOW:
ABUTMENT (ALL SIDES) = 75 MM
APPLICATION LOCATION SPECIFIED COMPRESSIVE STRENGTH IN CUBE (UP TO OUTER FACE OF MAIN REINFORCEMENT)
(28 DAYS) IN MPa RETURN WALL (ALL SIDES) = 75MM

REINFORCED CONCRETE (RCC) 5. SPECIFICALLY MADE COVER BLOCKS OF SAME STRENGTH AS THAT
FOOTING SLAB, ABUTMENT & RETURN WALL. M25 OF CONCRETE AND DIMENSION AS PROVIDED IN DRAWINGS SHALL BE
ONLY USED TO OBTAIN THE UNIFORMITY OF CLEAR COVER THROUGH
OUT THE CONSTRUCTION.
PLAIN CEMENT CONCRETE (PCC)
FOR LEVELING. M10 D. WATER
WATER TO BE USED IN THE CONCRETING AND CURING SHALL BE
PORTABLE WATER.

*** UNLESS OTHERWISE MENTIONED IN THE SPECIFICATION, E. SUPERVISION


THE TRIAL MIX DESIGN STRENGTH SHALL BE 31.6 MPa.
CONSTRUCTION WORK MUST BE SUPERVISED BY A COMPETENT
SUPERVISION ENGINEER.
SHEET CONTENTS : REVISION DATE NAME & SIGNATURE DRAWING NO.
ROYAL GOVERNMENT OF BHUTAN BAILEY TYPE STEEL TRUSS GANGCHITPO BRIDGE FIRST ISSUE Oct., 2017 DESIGN TSHEWANG RINZIN (E)

Ministry of Works & Human settlement [DS 80 FT SPAN & 3.277 m CARRIAGEWAY] GB-GN-02
On Silambi-Nagor GC Road GENERAL NOTES REVISED DRAWN TSHEWANG RINZIN (E)
Department of Roads, Bridge Division
Thimphu, Bhutan under Lingmithang Regional Office CHECKED RINCHEN KHANDU (EE) SCALE: NTS

APPROVED KARMA WANGDI (CE) (as Sheet A3 size)


REBAR HOOK SPECIFICATION TABLE 3 : STANDARD RE-BAR PROPERTIES
NOTES
45° HOOK (UNIT WT. 0.00785 kg / mm² /m)

DETAILED LENGTH HOOK LENGTH REBAR AREA, UNIT WT., A. GENERAL


UNBEND HOOK LENGTH DIA, mm REBAR TYPE
H
O
DESIGNATION mm 2 kg/m ALL THE DIMENSIONS ARE IN
O
K
EX
TE T10 10 79 0.617 IS : 1786 GRADE Fe 500 MILLIMETER UNLESS
N
SI OTHERWISE SPECIFIED.
IS : 1786 GRADE Fe 500
BAR DIA

ER
O
N T12 12 113 0.888
ET
AM
DI OFFSET LENGTH T16 16 201 1.578 IS : 1786 GRADE Fe 500 B. SHAPE CODE & BAR SHAPE
ND
BE
T20 20 314 2.466 IS : 1786 GRADE Fe 500 THE STANDARD SHAPE CODES AND
T25 25 491 3.853 IS : 1786 GRADE Fe 500 ITS METHOD OF MEASUREMENT
90° HOOK T28 28 616 4.834 IS : 1786 GRADE Fe 500 HAVE BEEN PREPARED AS PER
EUROPEAN STANDARD BS EN ISO
1
2BNED F + BAR F T32 32 804 6.313 IS : 1786 GRADE Fe 500 4006 : 2000.
DETAILED LENGTH
UNBEND HOOK LENGTH

TABLE 4 : STANDARD HOOK AND BEND REQUIREMENT 1


HOOK LENGTH
HOOK EXTEN.

(ART. 5.10 AASHTO LRFD 2007) BAR MARK


BAR DIA

ER
ET
AM
DI
ND BAR MARK SPACING
BE BENDING DIAMETER STANDARD HOOK EXTENSION, mm
REBAR
40-01-T20-150-BOTT.
135° HOOK DESIGNATION TIE/STIRRUPS OTHER NOS. OF
1
2 BEND F + BAR F TIE/STIRRUPS OTHER 900 1350 90 0
1800 BAR LOCATION/
DETAILED LENGTH HOOK LENGTH REMARK
UNBEND HOOK LENGTH
T10 40 60 60 75 120 65
. T12 48 72 72 75 144 65 TYPE OF REBAR DIA. OF REBAR
TN
EX
O
O
K
T16 64 96 96 96 192 65
BAR DIA

H
ER
M
ET T20 - 120 240 120 240 80
DIA T - HIGH YIELD DEFORMED BAR

BE
ND T25 - 150 300 150 300 100 Y - DEFORMED MS BAR
OFFSET LENGTH R - ROUND MS BAR
T28 - 168 168 336 112
INDICATES BAR CUT POINT
T32 - 256 192 384 128
180° HOOK 1
1
ALL REINFORCEMENT SHALL BE COLD BEND
2 BEND F + BAR F
DETAILED LENGTH HOOK LENGTH
UNBEND HOOK LENGTH
SHAPE CODE AS PER ISO 4066 : 2000
SHAPE CODE 00 11 21 51 LEGEND :
BEND DIAMETER c
r
BAR DIA

a a
c r = BENDING RADIUS AS
HOOK EXTENSION d
SHPAE b PER TABLE 4
OFFSET LENGTH

a b b d = DIAMETER OF BAR
a a/b/c/d = AS SHOWN
Total Length : Total Length : Total Length : Total Length :
a a+b - ½ r-d a+b+c-r-2d 2(a+b)+16d

SHEET CONTENTS : REVISION DATE NAME & SIGNATURE DRAWING NO.


ROYAL GOVERNMENT OF BHUTAN BAILEY TYPE STEEL TRUSS GANGCHITPO BRIDGE FIRST ISSUE Oct., 2017 DESIGN TSHEWANG RINZIN (E)

Ministry of Works & Human settlement [DS 80 FT SPAN & 3.277 m CARRIAGEWAY] GB-RCSD-03
On Silambi-Nagor GC Road REBAR CODES & REVISED DRAWN TSHEWANG RINZIN (E)
Department of Roads, Bridge Division
Thimphu, Bhutan under Lingmithang Regional Office SHAPE DETAILS CHECKED RINCHEN KHANDU (EE) SCALE: NTS

APPROVED KARMA WANGDI (CE) (as Sheet A3 size)


CO-ORDINATES
Reference East North Elevation
STN01 1000.000 500.000 100.000 instrument station
BM01 998.889 523.269 107.039 bench mark
BM02 1001.292 497.555 100.179 bench mark

30.709

000
30.000 105

105
29.969

R15
100
525 525

25.584
BM01

100
25.000
RIGHT ABUTMENT
22.847 CH:22.846
22.011 L
ER LEVE
20.220 WAT
95

W
20.000 O F LO
LINE
EL
W WATER LEV
LINE OF LO 17.304
17.027

80' + 2.25'' (Bearing to Bearing)


80 FT DOUBLE SINGLE BAILEY
TYPE STEEL TRUSS BRIDGE
15.000
L
ION LEVE
FLOW DIRECTION FLOW DIRECT ATER
O WW
OF L
LINE
95

10.000

ED
GE E
L INE E LIN
5.000 DG
E
4.874
3.762
500 500
2.068 100
STN01

BOULDER FILLING
0.000
BM02 E
E LIN
DG
CH:-1.691
LEFT ABUTMENT E
RRM WA

RR
M
W

Description 0 LEGEND
AL
LL TOP

00 IN
G
LT

5
R1 LL
Alignment

OP

FI INSTRUMENT STATION

BENCH MARK

GENERAL PLAN 01

1025

1050
1000
975

SHEET CONTENTS : REVISION DATE NAME & SIGNATURE DRAWING NO.


ROYAL GOVERNMENT OF BHUTAN BAILEY TYPE STEEL TRUSS GANGCHITPO BRIDGE FIRST ISSUE Oct., 2017 DESIGN TSHEWANG RINZIN (E)

Ministry of Works & Human settlement [DS 80 FT SPAN & 3.277 m CARRIAGEWAY] GB-GP01-04
On Silambi-Nagor GC Road GENERAL PLAN 01 REVISED DRAWN TSHEWANG RINZIN (E)
Department of Roads, Bridge Division
Thimphu, Bhutan under Lingmithang Regional Office CHECKED RINCHEN KHANDU (EE) SCALE: 1:250

APPROVED KARMA WANGDI (CE) (as Sheet A3 size)


000
30.000

105
29.969

R15
25.584
BM01
25.000
RIGHT ABUTMENT
22.847 CH:22.846
22.011 E VEL
ER L
20.220 W WAT
O
20.000 I N E OF L
L
W WA TER LEVEL
LINE OF LO 17.304
17.027

80' + 2.25'' (Bearing to Bearing)


80 FT DOUBLE SINGLE BAILEY
TYPE STEEL TRUSS BRIDGE
15.000
TION L EVEL
FLOW DIRECTION FLOW DIREC ATER
LO WW
LIN E OF

10.000

ED
GE
LIN INE
E 5.000 GEL
ED
4.874
3.762

2.068
STN01
BM02 BOULDER FILLING
0.000
INE
CH:-1.691 GEL
LEFT ABUTMENT ED
RRM WA

RR
M
W

0
AL
LL TOP

0 G
50 IN
LT

R1 L
Alignment

OP

F IL GENERAL PLAN 02
SHEET CONTENTS : REVISION DATE NAME & SIGNATURE DRAWING NO.
ROYAL GOVERNMENT OF BHUTAN BAILEY TYPE STEEL TRUSS GANGCHITPO BRIDGE FIRST ISSUE Oct., 2017 DESIGN TSHEWANG RINZIN (E)

Ministry of Works & Human settlement [DS 80 FT SPAN & 3.277 m CARRIAGEWAY] GB-GP02-05
On Silambi-Nagor GC Road GENERAL PLAN 02 REVISED DRAWN TSHEWANG RINZIN (E)
Department of Roads, Bridge Division
Thimphu, Bhutan under Lingmithang Regional Office CHECKED RINCHEN KHANDU (EE) SCALE: 1:170

APPROVED KARMA WANGDI (CE) (as Sheet A3 size)


80 FT DOUBLE SINGLE BAILEY TYPE STEEL TRUSS BRIDGE

80' + 2.25'' (Bearing to Bearing) EXISTING ROAD LEVEL


RL= 109.039
DIRT WALL TOP
RL= 104.328
DIRT WALL TOP
RL= 104.328
LEVEL
FINISHED ROAD
FINISHED ROAD LEVEL

BEARING LEVEL BEARING LEVEL


EXISTING ROAD LEVEL RL= 103.706 RL= 103.706

CH:22.846
1501

RL= 102.108 FINISHED TERRAIN BOTTOM OF PCC SLAB


FINISHED TERRAIN
RL= 102.606
INSTRUMENT STATION
10200 3259

TOP OF FOOTING SLAB 835


RL= 98.706

BOULDER FILLING
HFL=97.659
5100

CH:-1.691
BOTTOM OF PCC SLAB
1691 RL= 97.606 LWL=96.159

Datum : 95.000
chainage

107.070 29.969

108.083 30.709
105.315 25.584
104.024 22.847

105.040 25.000

30.000
102.697 20.000

103.261 20.220
17.304
15.000
10.000

17.027
4.874
3.762

22.011
2.068

5.000
0.000

103.059
100.000

99.639
99.706

99.085
elevation

97.458

95.803
99.126

107.113
95.831

95.171

Horizontal Scale 1 : 400


Vertical Scale 1 : 400 GENERAL ELEVATION 01
SHEET CONTENTS : REVISION DATE NAME & SIGNATURE DRAWING NO.
ROYAL GOVERNMENT OF BHUTAN BAILEY TYPE STEEL TRUSS GANGCHITPO BRIDGE FIRST ISSUE Oct., 2017 DESIGN TSHEWANG RINZIN (E)

Ministry of Works & Human settlement [DS 80 FT SPAN & 3.277 m CARRIAGEWAY] GB-GE01-06
On Silambi-Nagor GC Road GENERAL ELEVATION 01 REVISED DRAWN TSHEWANG RINZIN (E)
Department of Roads, Bridge Division
Thimphu, Bhutan under Lingmithang Regional Office CHECKED RINCHEN KHANDU (EE) SCALE: 1:140

APPROVED KARMA WANGDI (CE) (as Sheet A3 size)


80 FT DOUBLE SINGLE BAILEY TYPE STEEL TRUSS BRIDGE

80' + 2.25'' (Bearing to Bearing)


DIRT WALL T
RL= 104.3
DIRT WALL TOP
RL= 104.328

HED ROAD LEVEL

BEARING LEVEL BEARING LEVEL


NG ROAD LEVEL RL= 103.706 RL= 103.706

CH:22.846
FINISHED TERRAIN
FINISHED TERRAIN
INSTRUMENT STATION
3259

TOP OF FOOTING SLAB


RL= 98.706

BOULDER FILLING
HFL=97.659
CH:-1.691

BOTTOM OF PCC SLAB


RL= 97.606 LWL=96.159

um : 95.000

GENERAL ELEVATION 02

SHEET CONTENTS : REVISION DATE NAME & SIGNATURE DRAWING NO.


ROYAL GOVERNMENT OF BHUTAN BAILEY TYPE STEEL TRUSS GANGCHITPO BRIDGE FIRST ISSUE Oct., 2017 DESIGN TSHEWANG RINZIN (E)

Ministry of Works & Human settlement [DS 80 FT SPAN & 3.277 m CARRIAGEWAY] GB-GE02-07
On Silambi-Nagor GC Road GENERAL ELEVATION 02 REVISED DRAWN TSHEWANG RINZIN (E)
Department of Roads, Bridge Division
Thimphu, Bhutan under Lingmithang Regional Office CHECKED RINCHEN KHANDU (EE) SCALE: 1:80

APPROVED KARMA WANGDI (CE) (as Sheet A3 size)


DIRT WALL TO BE CONSTRUCTED AFTER
BRIDGE SUPERSTRUCTURE IS LAUNCHED 534 900

622
300

1322
℄of Bearing
300
800
834
1000

1500
1500 1500 1500 1500
200 200
1000

℄OF ABUTMENT
800 800
5000

5000
4400

6622
6722
6000
6100

1500

6000
1000

600 800 600 750 1500 1500 1500 750


1000

1300
Weep holes
ø 11 cm HDPE pipes
1 in 20 slope
200
1000

1000

1000

1000
Construction
joint
100 2000 1000 1000
100 100 500 5000 500 100
4000 6000
4200 100 6200 100
SIDE ELEVATION FRONT ELEVATION
Scale:1:35 Scale:1:35
SHEET CONTENTS : REVISION DATE NAME & SIGNATURE DRAWING NO.
ROYAL GOVERNMENT OF BHUTAN BAILEY TYPE STEEL TRUSS GANGCHITPO BRIDGE FIRST ISSUE Oct., 2017 DESIGN TSHEWANG RINZIN (E)
SIDE ELEVATION & GB-ABT-08
Ministry of Works & Human settlement [DS 80 FT SPAN & 3.277 m CARRIAGEWAY]
REVISED DRAWN
Department of Roads, Bridge Division On Silambi-Nagor GC Road FRONT ELEVATION OF TSHEWANG RINZIN (E)

Thimphu, Bhutan under Lingmithang Regional Office LEFT ABUTMENT CHECKED RINCHEN KHANDU (EE) SCALE: AS SHOWN

APPROVED KARMA WANGDI (CE) (as Sheet A3 size)


200 200
100
100

118
102

500

574
500

250
250

622

504
1400

457
250
250

Outline of Abutment Cap


DIRT WALL DETAILS
Scale: 1:15
900
NOTES

℄of Bearing
GENERAL

1. ALL THE DIMENSIONS ARE IN MILLIMETER


UNLESS OTHERWISE MENTIONED.

2. DO NOT SCALE THIS DRAWINGS.

Front outline of Dirt Wall


Front outline of Abutment Stem

Back outline of Abutment Stem


USE GIVEN DIMENSIONS ONLY.

3. DURING THE CONSTRUCTION, THE


CONTRACTOR MUST CHECK THE
DIMENSIONS, LEVELS AND

2997

3937
6200
6000
5000
℄of Abutment
MEASUREMENTS. DISCREPANCY
IF ANY TO BE REPORTED TO THE
6200
6000
5000

ENGINEER BEFORE EXECUTION.

MATERIALS

1. CONCRETE 28 DAYS STRENGTH


IN CUBE, fck = 25 MPa. [UNLESS
OTHERWISE MENTIONED IN THE
SPECIFICATION, THE TRIAL MIX
DESIGN STRENGTH SHALL BE 31.6 MPa]

2. YIELD STRENGTH OF STEEL,


fy = 500 MPa (GRADE Fe 500, IS 1786).

3. DETAILS OF STEEL IS MENTIONED


IN THE DRAWING AND ITS QUANTITY

900
IN THE BAR BENDING SCHEDULE.

COVERING

ABUTMENT WALL (ALL SIDES) = 75 MM


(UP TO OUTER FACE OF MAIN BAR)

250
250

250

1400

457
250

575
500
102 BAR MARK
500

BAR MARK SPACING

40-01-T 20-150-BOTT.

100 2000 400 600 1000 NOS. OF BAR LOCATION

100 2000 400 600 1000


/ REMARK
TYPE OF REBAR DIA. OF REBAR

2400 1600
2400 1600 4000
T - HIGH YIELD DEFORMED BAR
Y - DEFORMED MS BAR

4000
R - ROUND MS BAR

100 4200 100


100 4200 100 INDICATES BAR CUT POINT

BEARING PLAN
FOOTING PLAN
Scale:1:35
Scale:1:35
SHEET CONTENTS : REVISION DATE NAME & SIGNATURE DRAWING NO.
ROYAL GOVERNMENT OF BHUTAN BAILEY TYPE STEEL TRUSS GANGCHITPO BRIDGE FIRST ISSUE Oct., 2017 DESIGN TSHEWANG RINZIN (E)
FOOTING & BEARING GB-ABT-09
Ministry of Works & Human settlement [DS 80 FT SPAN & 3.277 m CARRIAGEWAY]
REVISED DRAWN
Department of Roads, Bridge Division On Silambi-Nagor GC Road PLAN OF LEFT TSHEWANG RINZIN (E)

Thimphu, Bhutan under Lingmithang Regional Office ABUTMENT CHECKED RINCHEN KHANDU (EE) SCALE: AS SHOWN

APPROVED KARMA WANGDI (CE) (as Sheet A3 size)


NOTES

GENERAL

1. ALL THE DIMENSIONS ARE IN MILLIMETER


UNLESS OTHERWISE MENTIONED.

2. DO NOT SCALE THIS DRAWINGS.


USE GIVEN DIMENSIONS ONLY.

3. DURING THE CONSTRUCTION, THE


CONTRACTOR MUST CHECK THE
DIMENSIONS, LEVELS AND
MEASUREMENTS. DISCREPANCY
IF ANY TO BE REPORTED TO THE
ENGINEER BEFORE EXECUTION.

27-04-T16-150-TOP. MATERIALS

1. CONCRETE 28 DAYS STRENGTH

1500
IN CUBE, fck = 25 MPa. [UNLESS
OTHERWISE MENTIONED IN THE
SPECIFICATION, THE TRIAL MIX
DESIGN STRENGTH SHALL BE 31.6 MPa]

3900
2. YIELD STRENGTH OF STEEL,

27-03-T16-150-BOTT. fy = 500 MPa (GRADE Fe 500, IS 1786).

3. DETAILS OF STEEL IS MENTIONED


IN THE DRAWING AND ITS QUANTITY
5000

IN THE BAR BENDING SCHEDULE.

COVERING

1500
6000

ABUTMENT WALL (ALL SIDES) = 75 MM


6100

(UP TO OUTER FACE OF MAIN BAR)

40-01-T20-150-BOTT.

40-02-T16-150-TOP.
500

1300
1100

BAR MARK

BAR MARK SPACING

40-01-T 20-150-BOTT.

NOS. OF BAR LOCATION


/ REMARK
TYPE OF REBAR DIA. OF REBAR
1000

T - HIGH YIELD DEFORMED BAR


Y - DEFORMED MS BAR
R - ROUND MS BAR

INDICATES BAR CUT POINT

100 2000 1000 1000


4000
100 4200 100
LEGEND
REINFORCEMENT VIEW "1-1"
SECTIONAL ELEVATION BOTTOM BAR
Scale:1:30 TOP BAR
Scale:1:35

SHEET CONTENTS : REVISION DATE NAME & SIGNATURE DRAWING NO.


ROYAL GOVERNMENT OF BHUTAN BAILEY TYPE STEEL TRUSS GANGCHITPO BRIDGE SECTIONAL ELEVATION FIRST ISSUE Oct., 2017 DESIGN TSHEWANG RINZIN (E)

Ministry of Works & Human settlement [DS 80 FT SPAN & 3.277 m CARRIAGEWAY]
& REINFORCEMENT REVISED DRAWN TSHEWANG RINZIN (E)
GB-ABT-10
Department of Roads, Bridge Division On Silambi-Nagor GC Road
under Lingmithang Regional Office VIEW "1-1" OF LEFT CHECKED RINCHEN KHANDU (EE) SCALE: AS SHOWN
Thimphu, Bhutan
ABUTMENT APPROVED KARMA WANGDI (CE) (as Sheet A3 size)
11-12-T16-150-AC 500

8-10-T16-150-AC
40-11-T16-150-AC
3x2=6-13(A&B)-T12-EQ
-FACE

34-09(A)-T16-150-BS

30-9(B)-T16-150-RS

8x10=80-14-T12-600-SPACER
40-08(B)-T16-150-RS

40-8(A)-T20-150-BS

1 1
40-02-T16-150-TOP
27-04-T16-150-TOP

3x4=12-6(A)-T12-CHAIRS 1500
1500

3-05(A)-T12-EQ-FACE 880 570


3-05(B)-T12-EQ-FACE
2x4=8-06(B)-T12-CHAIRS

27-03-T16-150-BOTT.
3x2=6-07(A&B)-T12-EQ-FACE 40-01-T20-150-BOTT.
REINFORCEMENT DETAILS
Scale:1:30
SHEET CONTENTS : REVISION DATE NAME & SIGNATURE DRAWING NO.
ROYAL GOVERNMENT OF BHUTAN BAILEY TYPE STEEL TRUSS GANGCHITPO BRIDGE FIRST ISSUE Oct., 2017 DESIGN TSHEWANG RINZIN (E)
REINFORCEMENT GB-ABT-11
Ministry of Works & Human settlement [DS 80 FT SPAN & 3.277 m CARRIAGEWAY]
REVISED DRAWN
Department of Roads, Bridge Division On Silambi-Nagor GC Road DETAILS OF LEFT TSHEWANG RINZIN (E)

Thimphu, Bhutan under Lingmithang Regional Office ABUTMENT CHECKED RINCHEN KHANDU (EE) SCALE: AS SHOWN

APPROVED KARMA WANGDI (CE) (as Sheet A3 size)


6000

DIRT WALL IN RRM 08(B)


09(B) & 10

1000
31-11-T20-200-RS

14 09(A)
08(A)

40-08(B)-T16-150-RS
34-9(A)-T16-150-BS

E E SECTION "E-E"

30-9(B)-T16-150-RS
Scale: 1:40

40-08(A)-T20-150-BS

05(A&B) 04
02
6(A) 1500 1500 1350

7(A) 7(B)
450 1500 1500 1500
6(B)

01 LEGEND
03
BACKFILL SIDE BAR
FRONT REINFORCEMENT VIEW
RIVER SIDE BAR
Scale:1:35

SHEET CONTENTS : REVISION DATE NAME & SIGNATURE DRAWING NO.


ROYAL GOVERNMENT OF BHUTAN BAILEY TYPE STEEL TRUSS GANGCHITPO BRIDGE FRONT FIRST ISSUE Oct., 2017 DESIGN TSHEWANG RINZIN (E)

Ministry of Works & Human settlement [DS 80 FT SPAN & 3.277 m CARRIAGEWAY] REINFORCEMENT REVISED DRAWN TSHEWANG RINZIN (E)
GB-ABT-12
Department of Roads, Bridge Division On Silambi-Nagor GC Road
under Lingmithang Regional Office VIEW & SECTION "E-E" CHECKED RINCHEN KHANDU (EE) SCALE: AS SHOWN
Thimphu, Bhutan
OF LEFT ABUTMENT (as Sheet A3 size)
APPROVED KARMA WANGDI (CE)
NOTES
50

GENERAL

300
Weep holes 1. ALL THE DIMENSIONS ARE IN MILLIMETER
UNLESS OTHERWISE MENTIONED.

ø 11 cm HDPE pipes 2. DO NOT SCALE THIS DRAWINGS.


USE GIVEN DIMENSIONS ONLY.
1 in 20 slope

1500
3. DURING THE CONSTRUCTION, THE
CONTRACTOR MUST CHECK THE

600
DIMENSIONS, LEVELS AND
MEASUREMENTS. DISCREPANCY
IF ANY TO BE REPORTED TO THE
ENGINEER BEFORE EXECUTION.

600
MATERIALS

Filter materials 1. CONCRETE 28 DAYS STRENGTH


IN CUBE, fck = 25 MPa. [UNLESS
50 cm thick OTHERWISE MENTIONED IN THE
SPECIFICATION, THE TRIAL MIX
600

DESIGN STRENGTH SHALL BE 31.6 MPa]

5000

1500
2. YIELD STRENGTH OF STEEL,
fy = 500 MPa (GRADE Fe 500, IS 1786).

3. DETAILS OF STEEL IS MENTIONED


600

IN THE DRAWING AND ITS QUANTITY


IN THE BAR BENDING SCHEDULE.

COVERING

14 ABUTMENT WALL (ALL SIDES)


(UP TO OUTER FACE OF MAIN BAR)
= 75 MM

RETURN WALL = 75MM

1700
BAR MARK

BAR MARK SPACING

09(A) 09(B)& 10

200
40-01-T 20-150-BACK.

NOS. OF BAR LOCATION


/ REMARK
TYPE OF REBAR DIA. OF REBAR

T - HIGH YIELD DEFORMED BAR


Y - DEFORMED MS BAR
R - ROUND MS BAR

50

INDICATES BAR CUT POINT

SPACER PLAN SECTION OF RETURN WALL


Scale:1:30 Scale:1:30
SHEET CONTENTS : REVISION DATE NAME & SIGNATURE DRAWING NO.
ROYAL GOVERNMENT OF BHUTAN BAILEY TYPE STEEL TRUSS GANGCHITPO BRIDGE SPACER PLAN & FIRST ISSUE Oct., 2017 DESIGN TSHEWANG RINZIN (E)

Ministry of Works & Human settlement [DS 80 FT SPAN & 3.277 m CARRIAGEWAY] SECTION OF RETURN REVISED DRAWN TSHEWANG RINZIN (E)
GB-ABT-13
Department of Roads, Bridge Division On Silambi-Nagor GC Road
under Lingmithang Regional Office WALL CHECKED RINCHEN KHANDU (EE) SCALE: AS SHOWN
Thimphu, Bhutan
APPROVED KARMA WANGDI (CE) (as Sheet A3 size)
NOTES
200
GENERAL

1. ALL THE DIMENSIONS ARE IN MILLIMETER


UNLESS OTHERWISE MENTIONED.

2. DO NOT SCALE THIS DRAWINGS.


USE GIVEN DIMENSIONS ONLY.

3. DURING THE CONSTRUCTION, THE


CONTRACTOR MUST CHECK THE
DIMENSIONS, LEVELS AND
MEASUREMENTS. DISCREPANCY
IF ANY TO BE REPORTED TO THE
ENGINEER BEFORE EXECUTION.

8x4=32-05-T12- MATERIALS

1. CONCRETE 28 DAYS STRENGTH


600-SPACER IN CUBE, fck = 25 MPa. [UNLESS
OTHERWISE MENTIONED IN THE
SPECIFICATION, THE TRIAL MIX
DESIGN STRENGTH SHALL BE 31.6 MPa]

2. YIELD STRENGTH OF STEEL,


fy = 500 MPa (GRADE Fe 500, IS 1786).
02
34-04-T12-150-VS 3. DETAILS OF STEEL IS MENTIONED
IN THE DRAWING AND ITS QUANTITY
IN THE BAR BENDING SCHEDULE.

34-03-T12-150-BS COVERING

ABUTMENT WALL (ALL SIDES) = 75 MM


(UP TO OUTER FACE OF MAIN BAR)

RETURN WALL = 75MM


8-02-T16-250-VS
BAR MARK

BAR MARK SPACING

40-01-T 20-150-BACK.
01 NOS. OF BAR LOCATION

8-01-T16-250-BS TYPE OF REBAR


/ REMARK
DIA. OF REBAR

T - HIGH YIELD DEFORMED BAR


Y - DEFORMED MS BAR
R - ROUND MS BAR

INDICATES BAR CUT POINT

03 04
200

REINFORCEMENT SECTION OF RETURN WALL LEGEND


Scale:1:30 REINFORCEMENT SIDE VIEW OF RETURN WALL BACKFILL SIDE BAR
Scale:1:30 VALLEY SIDE BAR

SHEET CONTENTS : REVISION DATE NAME & SIGNATURE DRAWING NO.


ROYAL GOVERNMENT OF BHUTAN BAILEY TYPE STEEL TRUSS GANGCHITPO BRIDGE REINFORCEMENT FIRST ISSUE Oct., 2017 DESIGN TSHEWANG RINZIN (E)

Ministry of Works & Human settlement [DS 80 FT SPAN & 3.277 m CARRIAGEWAY] SECTION & REVISED DRAWN TSHEWANG RINZIN (E)
GB-ABT-14
Department of Roads, Bridge Division On Silambi-Nagor GC Road
under Lingmithang Regional Office REINFORCEMENT SIDE CHECKED RINCHEN KHANDU (EE) SCALE: AS SHOWN
Thimphu, Bhutan
VIEW OF RETURN WALL (as Sheet A3 size)
APPROVED KARMA WANGDI (CE)
NOTES

GENERAL

1. ALL THE DIMENSIONS ARE IN MILLIMETER


UNLESS OTHERWISE MENTIONED.

2. DO NOT SCALE THIS DRAWINGS.


USE GIVEN DIMENSIONS ONLY.

3. DURING THE CONSTRUCTION, THE


CONTRACTOR MUST CHECK THE
DIMENSIONS, LEVELS AND
MEASUREMENTS. DISCREPANCY
IF ANY TO BE REPORTED TO THE
ENGINEER BEFORE EXECUTION.

MATERIALS

1. CONCRETE 28 DAYS STRENGTH


IN CUBE, fck = 25 MPa. [UNLESS
OTHERWISE MENTIONED IN THE
SPECIFICATION, THE TRIAL MIX
DESIGN STRENGTH SHALL BE 31.6 MPa]

2. YIELD STRENGTH OF STEEL,


fy = 500 MPa (GRADE Fe 500, IS 1786).

20-06-T16-250-HAUNCH 3. DETAILS OF STEEL IS MENTIONED


IN THE DRAWING AND ITS QUANTITY
IN THE BAR BENDING SCHEDULE.

COVERING

ABUTMENT WALL (ALL SIDES) = 75 MM


(UP TO OUTER FACE OF MAIN BAR)

01 03 RETURN WALL = 75MM

BAR MARK

BAR MARK SPACING

05
40-01-T 20-150-BACK.

NOS. OF BAR LOCATION


/ REMARK
TYPE OF REBAR DIA. OF REBAR

T - HIGH YIELD DEFORMED BAR


Y - DEFORMED MS BAR
R - ROUND MS BAR

INDICATES BAR CUT POINT

02 04
REINFORCEMENT PLAN OF RETURN WALL
Scale:1:15

SHEET CONTENTS : REVISION DATE NAME & SIGNATURE DRAWING NO.


ROYAL GOVERNMENT OF BHUTAN BAILEY TYPE STEEL TRUSS GANGCHITPO BRIDGE FIRST ISSUE Oct., 2017 DESIGN TSHEWANG RINZIN (E)

Ministry of Works & Human settlement [DS 80 FT SPAN & 3.277 m CARRIAGEWAY] REINFORCEMENT PLAN REVISED DRAWN TSHEWANG RINZIN (E)
GB-ABT-15
Department of Roads, Bridge Division On Silambi-Nagor GC Road OF RETURN WALL
Thimphu, Bhutan under Lingmithang Regional Office CHECKED RINCHEN KHANDU (EE) SCALE: AS SHOWN

APPROVED KARMA WANGDI (CE) (as Sheet A3 size)


a b c

a b c

a b c
c
b d
a e

a b c

c
b
a

a b c

a b
c

a b c

a b c

Note:
Bar Bending Schedule prepared is just for reference and estimation purpose only. The Contractor has to prepare separate Bar Bending Schedule before bar bending starts.
SHEET CONTENTS : REVISION DATE NAME & SIGNATURE DRAWING NO.
ROYAL GOVERNMENT OF BHUTAN BAILEY TYPE STEEL TRUSS GANGCHITPO BRIDGE FIRST ISSUE Oct., 2017 DESIGN TSHEWANG RINZIN (E)

Ministry of Works & Human settlement [DS 80 FT SPAN & 3.277 m CARRIAGEWAY] REBAR SCHEDULE OF REVISED DRAWN TSHEWANG RINZIN (E)
GB-ABT-16
Department of Roads, Bridge Division On Silambi-Nagor GC Road LEFT ABUTMENT
Thimphu, Bhutan under Lingmithang Regional Office CHECKED RINCHEN KHANDU (EE) SCALE: NTS

APPROVED KARMA WANGDI (CE) (as Sheet A3 size)


a

a c
b

b
a c

c
b
a

Note:
Bar Bending Schedule prepared is just for reference and estimation purpose only. The Contractor has to prepare separate Bar Bending Schedule before bar bending starts.
SHEET CONTENTS : REVISION DATE NAME & SIGNATURE DRAWING NO.
ROYAL GOVERNMENT OF BHUTAN BAILEY TYPE STEEL TRUSS GANGCHITPO BRIDGE FIRST ISSUE Oct., 2017 DESIGN TSHEWANG RINZIN (E)

Ministry of Works & Human settlement [DS 80 FT SPAN & 3.277 m CARRIAGEWAY] REBAR SCHEDULE OF REVISED DRAWN TSHEWANG RINZIN (E)
GB-ABT-17
Department of Roads, Bridge Division On Silambi-Nagor GC Road LEFT RETURN WALL
Thimphu, Bhutan under Lingmithang Regional Office CHECKED RINCHEN KHANDU (EE) SCALE: NTS

APPROVED KARMA WANGDI (CE) (as Sheet A3 size)


1600
230

622
1000 370

622
1722

1722
1000

1000
℄of Abutment ℄of Bearing

100
6000
100 6200 100

2000 100 FRONT ELEVATION


100 2200 100 Scale:1:35

SIDE ELEVATION
Scale:1:20

200 200

118
Note:

622
Dirt Wall to be constructed only after

504
Bridge Superstructure is launched.

DIRT WALL DETAILS


Scale: 1:15

SHEET CONTENTS : REVISION DATE NAME & SIGNATURE DRAWING NO.


ROYAL GOVERNMENT OF BHUTAN BAILEY TYPE STEEL TRUSS GANGCHITPO BRIDGE FIRST ISSUE Oct., 2017 DESIGN TSHEWANG RINZIN (E)
SIDE ELEVATION & GB-ABT-18
Ministry of Works & Human settlement [DS 80 FT SPAN & 3.277 m CARRIAGEWAY]
REVISED DRAWN
Department of Roads, Bridge Division On Silambi-Nagor GC Road FRONT ELEVATION OF TSHEWANG RINZIN (E)

Thimphu, Bhutan under Lingmithang Regional Office RIGHT ABUTMENT CHECKED RINCHEN KHANDU (EE) SCALE: AS SHOWN

APPROVED KARMA WANGDI (CE) (as Sheet A3 size)


100 100 NOTES

GENERAL
102

574
1. ALL THE DIMENSIONS ARE IN MILLIMETER
UNLESS OTHERWISE MENTIONED.

2. DO NOT SCALE THIS DRAWINGS.

1400

457
USE GIVEN DIMENSIONS ONLY.

3. DURING THE CONSTRUCTION, THE


CONTRACTOR MUST CHECK THE
DIMENSIONS, LEVELS AND
MEASUREMENTS. DISCREPANCY
IF ANY TO BE REPORTED TO THE
ENGINEER BEFORE EXECUTION.
900
MATERIALS

℄of Bearing
℄of Abutment
1. CONCRETE 28 DAYS STRENGTH
IN CUBE, fck = 25 MPa. [UNLESS
OTHERWISE MENTIONED IN THE
SPECIFICATION, THE TRIAL MIX
DESIGN STRENGTH SHALL BE 31.6 MPa]

2997

3937
6200
6000
6200
6000

2. YIELD STRENGTH OF STEEL,


fy = 500 MPa (GRADE Fe 500, IS 1786).

3. DETAILS OF STEEL IS MENTIONED


IN THE DRAWING AND ITS QUANTITY
IN THE BAR BENDING SCHEDULE.

COVERING

ABUTMENT WALL (ALL SIDES) = 75 MM


900 (UP TO OUTER FACE OF MAIN BAR)

RETURN WALL = 75MM

BAR MARK

1400

457
BAR MARK SPACING

40-01-T 20-150-BACK.

575
102 NOS. OF BAR LOCATION
/ REMARK
TYPE OF REBAR DIA. OF REBAR

100 1600 400 100 2000 T - HIGH YIELD DEFORMED BAR


Y - DEFORMED MS BAR
2000 100 2200 100 R - ROUND MS BAR

100 2200 100


BEARING PLAN INDICATES BAR CUT POINT
FOOTING PLAN Scale:1:35
Scale:1:35
SHEET CONTENTS : REVISION DATE NAME & SIGNATURE DRAWING NO.
ROYAL GOVERNMENT OF BHUTAN BAILEY TYPE STEEL TRUSS GANGCHITPO BRIDGE FIRST ISSUE Oct., 2017 DESIGN TSHEWANG RINZIN (E)
FOOTING & BEARING GB-ABT-19
Ministry of Works & Human settlement [DS 80 FT SPAN & 3.277 m CARRIAGEWAY]
REVISED DRAWN
Department of Roads, Bridge Division On Silambi-Nagor GC Road PLAN OF RIGHT TSHEWANG RINZIN (E)

Thimphu, Bhutan under Lingmithang Regional Office ABUTMENT CHECKED RINCHEN KHANDU (EE) SCALE: AS SHOWN

APPROVED KARMA WANGDI (CE) (as Sheet A3 size)


40-03-T16-150-TOP
1 1
13-05-T16-150-TOP

3x10=30-06-T12-CHAIRS

3-07(A)-T12-EQ-FACE 3-07(B)-T12-EQ-FACE

13-04-T16-150-BOTT.
3x2=6-08(A&B)-T12- 40-02-T16-150-BOTT.
EQ-FACE
1300 24-01-T25-800-ANCHOR

REINFORCEMENT DETAILS
Scale:1:20

SHEET CONTENTS : REVISION DATE NAME & SIGNATURE DRAWING NO.


ROYAL GOVERNMENT OF BHUTAN BAILEY TYPE STEEL TRUSS GANGCHITPO BRIDGE FIRST ISSUE Oct., 2017 DESIGN TSHEWANG RINZIN (E)
REINFORCEMENT GB-ABT-20
Ministry of Works & Human settlement [DS 80 FT SPAN & 3.277 m CARRIAGEWAY]
REVISED DRAWN
Department of Roads, Bridge Division On Silambi-Nagor GC Road DETAILS OF RIGHT TSHEWANG RINZIN (E)

Thimphu, Bhutan under Lingmithang Regional Office ABUTMENT CHECKED RINCHEN KHANDU (EE) SCALE: AS SHOWN

APPROVED KARMA WANGDI (CE) (as Sheet A3 size)


200
NOTES

GENERAL

1. ALL THE DIMENSIONS ARE IN MILLIMETER


UNLESS OTHERWISE MENTIONED.

800
2. DO NOT SCALE THIS DRAWINGS.
USE GIVEN DIMENSIONS ONLY.

3. DURING THE CONSTRUCTION, THE


40-03-T16-150-TOP CONTRACTOR MUST CHECK THE
DIMENSIONS, LEVELS AND
MEASUREMENTS. DISCREPANCY
IF ANY TO BE REPORTED TO THE

800
ENGINEER BEFORE EXECUTION.

MATERIALS

1. CONCRETE 28 DAYS STRENGTH


IN CUBE, fck = 25 MPa. [UNLESS
OTHERWISE MENTIONED IN THE
SPECIFICATION, THE TRIAL MIX
DESIGN STRENGTH SHALL BE 31.6 MPa]

800
13-05-T16-150-TOP 2. YIELD STRENGTH OF STEEL,
fy = 500 MPa (GRADE Fe 500, IS 1786).

3. DETAILS OF STEEL IS MENTIONED


IN THE DRAWING AND ITS QUANTITY
IN THE BAR BENDING SCHEDULE.

800
Anchor Hole should be COVERING
minimum of 32mm Dia
ABUTMENT WALL (ALL SIDES) = 75 MM
(UP TO OUTER FACE OF MAIN BAR)
13-04-T16-150-BOTT. RETURN WALL = 75MM

BAR MARK
800

BAR MARK SPACING

40-01-T 20-150-BACK.

NOS. OF BAR LOCATION


/ REMARK
TYPE OF REBAR DIA. OF REBAR
800

T - HIGH YIELD DEFORMED BAR


Y - DEFORMED MS BAR
R - ROUND MS BAR

40-02-T16-150-BOTT.
INDICATES BAR CUT POINT
800

LEGEND
200

800 800
200 200 BOTTOM BAR
PLAN OF ANCHORAGE BAR
REINFORCEMENT VIEW "1-1" TOP BAR
Scale:1:30 Scale:1:30
SHEET CONTENTS : REVISION DATE NAME & SIGNATURE DRAWING NO.
ROYAL GOVERNMENT OF BHUTAN BAILEY TYPE STEEL TRUSS GANGCHITPO BRIDGE PLAN OF ANCHORAGE FIRST ISSUE Oct., 2017 DESIGN TSHEWANG RINZIN (E)

Ministry of Works & Human settlement [DS 80 FT SPAN & 3.277 m CARRIAGEWAY] BAR & GB-ABT-21
REVISED DRAWN TSHEWANG RINZIN (E)
Department of Roads, Bridge Division On Silambi-Nagor GC Road REINFORCEMENT VIEW
Thimphu, Bhutan under Lingmithang Regional Office "1-1" OF RIGHT CHECKED RINCHEN KHANDU (EE) SCALE: AS SHOWN

ABUTMENT APPROVED KARMA WANGDI (CE) (as Sheet A3 size)


a

a c
b

a b c

c
b d
a e

a c
b

a c
b

Note:
Bar Bending Schedule prepared is just for reference and estimation purpose only. The Contractor has to prepare separate Bar Bending Schedule before bar bending starts.
SHEET CONTENTS : REVISION DATE NAME & SIGNATURE DRAWING NO.
ROYAL GOVERNMENT OF BHUTAN BAILEY TYPE STEEL TRUSS GANGCHITPO BRIDGE FIRST ISSUE Oct., 2017 DESIGN TSHEWANG RINZIN (E)

Ministry of Works & Human settlement [DS 80 FT SPAN & 3.277 m CARRIAGEWAY] REBAR SCHEDULE OF REVISED DRAWN TSHEWANG RINZIN (E)
GB-ABT-22
Department of Roads, Bridge Division On Silambi-Nagor GC Road RIGHT ABUTMENT
Thimphu, Bhutan under Lingmithang Regional Office CHECKED RINCHEN KHANDU (EE) SCALE: NTS

APPROVED KARMA WANGDI (CE) (as Sheet A3 size)


600

FLOW DIRECTION
RR

G
M

IN
WA

LL
50

LL
00

FI
TO
P
50
00
RR
M
W
AL
LT LEFT ABUTMENT
50 OP
00

CH:-1.691

BM02

STN01
5000
RRM WA

0.000

5.000
3.762
2.068

4.874
LL TO P
PLAN OF RRM WING WALL
SHEET CONTENTS : REVISION DATE NAME & SIGNATURE DRAWING NO.
ROYAL GOVERNMENT OF BHUTAN BAILEY TYPE STEEL TRUSS GANGCHITPO BRIDGE FIRST ISSUE Oct., 2017 DESIGN TSHEWANG RINZIN (E)

Ministry of Works & Human settlement [DS 80 FT SPAN & 3.277 m CARRIAGEWAY] PLAN OF RRM WING REVISED DRAWN TSHEWANG RINZIN (E)
GB-ABT-23
Department of Roads, Bridge Division On Silambi-Nagor GC Road WALL
Thimphu, Bhutan under Lingmithang Regional Office CHECKED RINCHEN KHANDU (EE) SCALE: 1:100

APPROVED KARMA WANGDI (CE) (as Sheet A3 size)


B A
C
5002
5003
5003
2001

2992
2830
2671

6656
10200

C B
GENERAL ELEVATION OF RRM WALL
Scale:1:80
600
100mm thick PCC M10
20mm agg. 5100

979
500

500mm filter media


A
with approved materials
1500

544
RRM in cement mortar 1:4
599
2

6356

100x100mm weepholes

240
1500

@ 1.5m c/c

1500
Back filling by using
selected subgrade materials
1500

100mm thick PCC

648
M10, 40mm agg.
200mm thick
877

stone soiling
2000
4200
100 4400 100 100 2200 100
SECTION "A-A" SECTION "B-B" & "C-C"
Scale:1:65 Scale:1:40
SHEET CONTENTS : REVISION DATE NAME & SIGNATURE DRAWING NO.
ROYAL GOVERNMENT OF BHUTAN BAILEY TYPE STEEL TRUSS GANGCHITPO BRIDGE FIRST ISSUE Oct., 2017 DESIGN TSHEWANG RINZIN (E)

Ministry of Works & Human settlement [DS 80 FT SPAN & 3.277 m CARRIAGEWAY] ELEVATION & SECTION REVISED DRAWN TSHEWANG RINZIN (E)
GB-ABT-24
Department of Roads, Bridge Division On Silambi-Nagor GC Road OF WING WALL
Thimphu, Bhutan under Lingmithang Regional Office CHECKED RINCHEN KHANDU (EE) SCALE: 1:100

APPROVED KARMA WANGDI (CE) (as Sheet A3 size)