Score: 27%
Performance for The Month: November Area/Location: PSS1
Main Contractor: Al Babtain PMCM/SC: Arcadis
Inspection Lead:
(Name, Role & Organisation)
Umer Siddique - Arcadis HSE Manager
Points will be objectively awarded based upon observed site health & safety conditions.
Scoring will be as follows: Good (G) = 3, Acceptable (A) = 2, Poor (P) = 1, Totally Unacceptable/Unavailable (U) = 0 or Not Applicable
Ms4 Are Supervisors providing task briefings to the workforce before U=0 X
commencement of works for that day/activity?
Ms5 Are task briefings being carried out in the worker’s native language? A=2 X
SUB TOTAL 2 15 % 13
Si Site H&S Notice Boards & Signage Scoring G A P U Comments
Do the site Notice Boards correctly identify the names and Contractor needs to be work out on this
Si1 P=1 section
telephone numbers of relevant Health and Safety staff?
Do the site Notice Boards contain relevant details of first aiders, fire
Si2 wardens, emergency hotline and/or other emergency response P=1
teams/personnel?
Si3 Do the site Notice Boards contain relevant health and safety P=1
awareness, alerts, bulletins, campaign and/or educational material?
SUB TOTAL 5 15 % 33
Em Emergency Preparedness & Response Scoring G A P U Comments
Are there adequate means and equipment for raising an emergency Contractor needs to be work out on this
Em1 P=1 section
alarm?
Is there evidence of routine emergency drills (fire and medical)
Em2 being undertaken and any associated lessons learned being P=1
actioned?
Em4 Are there means of recording all persons working/visiting the area P=1
and subsequently this information is used during any site muster?
Page 1 of 9
Health Safety Compliance Inspection Record
Contractor HSE Performance
Ac4 Are access/egress routes well lit (normal and emergency) conditions? A=2 X
Ac5 Unless for low hazard/risk area, are there two independent means of A=2 X
access/egress which can be used in the event of an emergency?
SUB TOTAL 6 15 % 40
SUB TOTAL 3 15 % 20
Ba Barriers Scoring G A P U Comments
Are barriers installed where hazards exist to either contain the Ba: Almost 1 km of trench found without
Ba1 hazard or protect workers from coming into contact with hazards i.e. U=0 X any edge protection.
excavations, plant/pedestrian segregation? Ba2: Contractor to work on the quantities
of barriers as per their site work
Are barriers of an appropriate type which are sufficient to requirements.
Ba2 U=0 X Ba3: No amber flashing lights installed.
control/contain the associated hazards/risk?
Ba5: Contractor to install relevant hazard
Are barriers visible to all in the work area with consideration for signs.
Ba3 relevant night time activities i.e. red/white tape, amber flashing U=0 X
lights at night?
Ba4 Are barriers properly maintained, kept clean and in good condition? A=2 X
Ba5 Are suitable signs posted warning workers of the hazards existing U=0 X
beyond/within the barriered area?
SUB TOTAL 2 15 % 13
Mo5 Are bus stops for dropping off/collecting workers set up in a safe U=0 X
areas clear of other traffic and site hazards?
SUB TOTAL 2 15 % 13
Fi Fire Scoring G A P U Comments
Contractor needs to be work out on this
Are portable fire extinguishers and/or other fire fighting equipment section
Fi1 of the correct type and are available next to generators, plant & P=1
vehicles, flammable materials, hot works etc.?
Fi4 Are designated smoking areas with mean of extinguishing cigarettes P=1
provided around sites, outside offices and welfare areas?
Page 2 of 9
Health Safety Compliance Inspection Record
Contractor HSE Performance
Ho5 Are sufficient waste containers provided and evidence that waste P=1
and appropriately segregated and regularly disposed of?
SUB TOTAL 7 15 % 47
Pp PPE Scoring G A P U Comments
Pp1 Are mandatory PPE requirements being enforced? P=1 Pp1: Improve the use of eye glasses.
Some formen / surveyour are being
Is provided PPE to a relevant/appropriate standard and in good witnessed without safety shoes.
Pp2 condition? A=2 X Pp3: Conduct training for the use of
safety harness for the height works.
Has adequate training been provided in the wearing of PPE and is it Pp5: Mechanism to replace damaged PPE
Pp3 being worn correctly? U=0 X must be included in induction.
Is appropriate signage displayed highlighting mandatory and task/area
Pp4 specific PPE requirements? A=2 X
Li5 Are slings/lifting equipment protected from sharp edges and taglines
provided when appropriate? U=0 X
SUB TOTAL 0 15 % 0
Page 3 of 9
Health Safety Compliance Inspection Record
Contractor HSE Performance
SUB TOTAL 3 15 % 20
Wh Work at Height Scoring G A P U Comments
Wh1 Is there is evidence that personnel are trained and competent to work Wh1: Train all personnel involved in
at height, including the wearing of any harnesses or lanyards? U=0 X height works for the WAH training.
Wh2: Provide drawing details and ensure
Wh2 Is work at height related safety equipment correctly installed (scaffolds, safe working platform for the height
fall protection systems such a horizontal safety lines etc.)? works related to casting of beams and
U=0 X roof.
Wh3: Workers found working at height
without Safety harness. Provide suitable
Wh3 Are harnesses and lanyards being worn correctly and suitable for height double lanyard harness with shock
and task? U=0 X absorber.
Wh4 Are fall restraint, as opposed to arrest, systems being used where
appropriate? Not Applicable
SUB TOTAL 0 9 % 0
Sc Scaffolds & Tower Scaffolds Scoring G A P U Comments
Sc1 Is there evidence that scaffolds have been inspected by a certified Sc1: Submit copy of scaffold inspector
scaffold inspector within the last 7 days and scafftags are fitted? U=0 X certificate.
Sc2: Ensure guard rails for the working
Sc2 Are scaffold fitted with a top rail (min 950mm) and an intermediate rail platform.
(min 470mm) and toeboards (min 150mm)? U=0 X Sc3: Ensure no gaps or openings in the
working platform.
Sc3 Are any openings in platforms protected against falls (covered/gated)? Sc4: Provide proper ladders and secure
U=0 X with clamps.
Sc4 Are ladders (where fitted) extended a minimum of 1m or 5 rungs above
platform level? U=0 X
Sc5 Are tower scaffolds erected on firm level ground with the wheels or
feet properly supported and secured? Not Applicable
SUB TOTAL 0 12 % 0
Page 4 of 9
Health Safety Compliance Inspection Record
Contractor HSE Performance
Ex5 Is spoil, materials and equipment kept a safe distance from the edges of
excavations? A=2 X
SUB TOTAL 7 15 % 47
Lo LOTO (Lock Out Tag Out) Scoring G A P U Comments
Lo1 Does the contractor have an approved lockout/tagout (LOTO) system in
place to control the inadvertent release of stored energy on workers?
Not Applicable
Hw2 Is a Hot Works permit issued for all welding/hot works operations? Not Applicable
Hw3 Are oxygen, LPG and acetylene cylinders stored at a suitable distance
apart (min 6m clearance) unless separated by a fire resistant structure? Not Applicable
Hw4 Are any hose connections made using an appropriate connector i.e. not
jubilee clips? Not Applicable
Hw5 Are flashback arrestors fitted at pressure regulator outlet valves? Not Applicable
SUB TOTAL 0 0 % Not Applicable
Cs3 Where identified on any associated Confined Space Permit, has gas
detection been completed prior to entry and during the work and has
the equipment being used been calibrated, in date and in good working Not Applicable
order?
Overall Score 72
Overall Potential Score 267
Overall % 27% <50% 50-80% >80% Scoring Criteria
Page 5 of 9
Health Safety Compliance Inspection Record
Contractor HSE Performance
70
60 58
50
50 47 47
40
40
33 33 33 33 33
% Score
30
20 20
20 17
13 13 13
10
0 0 0
0
Page 6 of 9
Health Safety Compliance Inspection Record
Contractor HSE Performance
Page 7 of 9
Health Safety Compliance Inspection Record
Contractor HSE Performance
###
###
###
###
###
###
###
###
Page 8 of 9
Health Safety Compliance Inspection Record
Contractor HSE Performance
###
###
###
Page 9 of 9