01
PART ONE
Preparation work
02
PART TWO
Unpacking and installation
03
PART THREE
Adjustment
01
PART ONE
Preparation work
01
PART ONE
Preparation work
Space Requirement
1. well-ventilated and no dust, mechanical vibration, big noise and power supply interference
2. Atmospheric pressure: 86KPa - 106 KPa
3. No corrosive and inflammable gases.
4. Temperature of working environment : 10℃ - 30℃
5. Relative humidity: ≤70%
6. Keep away from brush-type motor, flickering fluorescent lamp and electrical contact type
equipment that are frequently switched off and on.
7. Avoid direct sunlight or direct influence of heat and wind sources.
8. During normal working, the loudest noise 1m away from the instrument shall be lower than 60dB.
Water Requirement
1. Electrical conductivity of purified water shall be at least CLSI grade two and ≤1μs/cm.
2. Water supply shall purify water for at least 5L/h.
3. Temperature of supplied water shall be 5 ℃-32 ℃.
1: analyzer
3: accessories 请在此添加图片说明
2: accessories
请在此添加图片说明
请在此添加图片说明
请在此添加图片说明
请在此添加图片说明
请在此添加图片说明
请在此添加图片说明
请在此添加图片说明
请在此添加图片说明
请在此添加图片说明
请在此添加图片说明
请在此添加图片说明
请在此添加图片说明
请在此添加图片说明
DB9F1F cable
RS-232 cable
请在此添加图片说明
Shielded network
cable
Sample tube
adaptor Reagent bottle(30ml/10ml)
wrench
Allen key
BC1200 needle
cleaning unit
semi Permanent cuvettes
请在此添加图片说明
Philips screwdriver
tighten the
8 fixing
请在此添加图片说明 screws
请在此添加图片说明
请在此添加图片说明
请在此添加图片说明
请在此添加图片说明
Connect the liquid detection unit following the order and colors. Don’t mix them .
请在此添加图片说明
请在此添加图片说明
Note:
1. Dilute the alkaline wash with the purified water in the ratio 1:8.
2. Before use , displace the wash liquid for some time to make sure no bubbles in the wash liquid tank.
请在此处添加小标题 Note:
Server IP : 192.168.1.80
请在此处添加小标题
Choose TCP/IP
请在此处添加小标题 请在此处添加小标题
Note:
1. When priming the washer , it should be taken apart into a container .
2. Prime enough time to make sure the water flows continuously.
请在此处添加小标题
请在此处添加小标题 请在此处添加小标题
Reference range:
The results of all wavelength of the first cuvette
should be around 50000, and the others should
be around ±3500.
ISE
请在此处添加小标题 请在此处添加小标题
Loose these
fixing screws
请在此处添加小标题
Charge the Filling solution from the charging hole on the top of
Reference electrode. the Filling solution should reach 2/3 to 3/4
of Electrode cavity volume(~5mL)
Make sure no bubbles between Filling solution and Electrode
membrane, if any bubbles inside, swing the electrode or flip it
with finger to remove the bubbles
Make sure the charging hole is not blocked by crystal.
请在此处添加小标题
The filling solution should reach 2/3 to 3/4 of cavity volume, make sure not too less or too much.
Make sure no bubbles between filling solution and Electrode membrane, if any bubbles inside,
swing the electrode or flip it with finger to remove the bubbles.
Dummy electrode
请在此处添加小标题 请在此处添加小标题
1
3 “07 01 16 “ A standard reagent
2
4
Note: It is suggested to prime for 2-3 times for A/B standard reagent separately.